dormakaba L80 Muto Comfort Ceiling Mount with Dormotion and Sidelites Glass Installation Guide

June 21, 2024
dormakaba

MUTO Comfort
L80
Ceiling mount with Dormotion and Sidelites (Glass)
Installation Manualdormakaba L80 Muto Comfort Ceiling Mount with
Dormotion and Sidelites Glass - track

Technical specifications

1.1 Overview
These instructions are for installation of MUTO COMFORT sliding door system L80 with Sidelites for the following mounting and style versions:

  1. Ceiling mount
    1.1.1 General information
    • dormakaba requires use of tempered monolithic or tempered laminated glass.
    • dormakaba glass hardware is not suitable for application in rooms where chemicals (e.g. chlorine) are used as indoor swimming pools, saunas or salt- water pools.
    • Never move sliding panels faster than walking speed and always stop the door manually before it reaches end position.
    • Do not slide doors with excessive force. Install limiting stop to prevent door from opening too far.
    1.1.2 Intended use
    • For sliding door in dry indoor areas only
    • For manual slowly opening and closing only
    1.1.3 Glass requirements and fittings
    • The substructure/wall must be able to bear permanent loads and be level (max. tolerance: 1/16” [2] per 39” [1m]).
    • Fasteners must be sufficiently dimensioned for the substructure/wall and weight of the door.
    • When adjusting glass components, always stick to the required clearance for the respective hardware. Adjust clearance so glass does not come in contact with any hard surfaces such as glass, metal or concrete.
    • Do not use excessive force when installing the glass (avoid over tightening screws).
    1.1.4 Requirements for glass panel
    • dormakaba requires use of fully tempered glass, which complies with ASTM C 1036 and ASTM C 1048. Secondary heat soaking processes are recommended but not required. This applies to both tempered monolithic and tempered laminated glass.
    • Clamping area must be flat and uncoated (no self-cleaning coating!)
    • Never use glass with conchoidal fractures and/or damaged edges.
    1.1.5 Safety instructions
    • Installation requires two people.
    • Only properly qualified and specially trained staff are authorized to mount dormakaba glass hardware.
    • Due to crushing hazards and possible injury caused by breakage of glass during mounting, corresponding protective clothing (especially gloves and protective goggles) is required.
    • Never clamp metal fitting hardware directly to glass surface.

1.1.6 Symbols used – Safety/Installation
CAUTION
Mounting components must meet the requirements of substructure/wall and door weight. Please read the technical information for fittings.
WARNING
Risk of breaking glass. When installing the door, support the door panel with a block of wood or similar object.
TIPS AND RECOMMENDATIONS
Information note
CLOSING EDGE
1.1.7 Maintenance, care, repair

  • Immediately replace damaged parts.
  • Always use original dormakaba parts.
  • Clean clamping area with alcohol-based standard commercial cleaning agent before mounting the glass hardware.
  • Use a damp clothe for occasional cleaning, especially the track.
  • Always use silicone – and oil-free cleaners (e.g. acetone).
  • Check glass hardware at regular intervals for proper positioning and smooth operation and correct adjustment.
  • High traffic door systems require inspection by properly qualified staff (specialized companies or installation firms.)

1.1.8 Disposal
Disposal in accordance with local, state and national regulations.

Single Door Double Door

| | L80| L80
Ceiling| Door leaf weight lbs [kg] *| ≤176lbs [≤80]| 2 x ≤176lbs
[2 x ≤80]
mount

1.3 Tempered laminate glass (TLG) and adhesive specifications

Required parts for laminate glass with MUTO System (not included)| Part Number| Quantity| Usage recommendation
---|---|---|---
3MT” Scotch-WeldTM Urethane Adhesive, DP 605 NS| 934.800| 1 tube| 1 tube per 4 roller carriers
3MT” Scotch-WeldTM EPXTM Plus II Applicator with 1:1 Plunger 2| 934.801| 1 applicator| 1:1 plunger with 934.800 adhesive
3MT” Scotch-WeldTM EPXTM Plus II Mixing Square Nozzle, 5.3mm 3| 934.805| Pk of 4| 4 nozzles per 1 tube of adhesive
MUTO TLG gasket set| 807.640| 1 set|
Handling time frame| Function| Time
| Working life (time application and clamping| 5 minutes @ 75°F
Handling strength| 20 minutes @ 73°F or more
Full cure time (normal door usage not recommended until full cure time as been met)| 48 hours @ 73°F or more

NOTE: Door glass should not be installed until the full cure time as been reached (see chart above).
1.1 Clean clamping area with alcohol-based standard commercial cleaning agent before mounting the glass hardware.
Important safety-related information for the mounting and use of dormakaba glass hardware.
1.2 Never clamp metal glass fitting hardware directly to glass surface.
1.3 Never use clamping product on surfaces with self-cleaning coatings.
2 Scotch-Weld™ EPX™ Plus II Applicator with 1:1 Plunger is a trademark of 3M.
3 Scotch-Weld™ EPX™ Plus II Mixing Square Nozzle is a trademark of 3M.

 Installation instructions

2.1 Overalldormakaba L80 Muto Comfort Ceiling Mount with Dormotion and
Sidelites Glass - Overall 1.3 Track
1.4 Cover end c ap
1.1 Cover panel
1.2 Br ush strip
1.5 Sidelite profile end cap
1.8 End st op
1.9 Cover clips
1.6 F iller profile
1.7 Sidelite profile
1.10 Start / stop guide
1.13 F loor guide
1.14 U-channel
1.11 Roller carrier
1.12 Dormotion units
1.17 View protection clip
1.16 View protection profile
1.15 Sidelite glass gasket
2.2 Door/wall dimentions
![dormakaba L80 Muto Comfort Ceiling Mount with Dormotion and Sidelites Glass

  • Door](https://manuals.plus/wp-content/uploads/2024/06/dormakaba-L80-Muto- Comfort-Ceiling-Mount-with-Dormotion-and-Sidelites-Glass-Door.jpg) NOTE:
    Overhead Reinforcement:
    The overhead reinforcement must be a minimum of ¼” [6] x 3” [76] steel angle, 16 gauge metal stud, or two pieces of 1 1/2” [38] thick wood blocking (double stacked), secured to studs or joists on a maximum 16” [406] centers for the length of the track. The overhead einforcement may be flush on the overhead surface or on the interior of this surface.
    Track mounting screws must fully penetrate the steel angle, metal stud, or at a minimum of 2” [51] into wood blocking, utilizing the predrilled holes in the MUTO track.
    Consult with a structural engineer to determine if reinforcement is adequate for your specific application or to meet specific codes in your location.
    2.3 Installing the end stopsdormakaba L80 Muto Comfort Ceiling Mount
with Dormotion and Sidelites Glass - end stops 2.3.1 Slide bumper stops into each end of the track.
    NOTE: Loosen bottom section of end stop for easier install.
    NOTE: Be sure set screw is flush with back of bumper.
    NOTE: Exact location/adjustments will be determined in the Adjustment End Stop Location step.
    2.4 Securing gasket to trackdormakaba L80 Muto Comfort Ceiling Mount
with Dormotion and Sidelites Glass - Securing gasket 2.4.1 Ensure the track is cut to proper length.
    NOTE: SEE DIMENSION INSTRUCTIONS ON PAGE 6.
    2.4.2 Cut adhesive gasket equal to sidelite glass width.
    2.4.3 Adhere gasket along bottom edge of back of track.
    2.5 Securing track and sidelite section profile to mounting surfacedormakaba L80 Muto Comfort Ceiling Mount with Dormotion and
Sidelites Glass - Securing track 2.5.1 Secure track to mounting surface.
    2.5.2 Align predrilled holes in sidelite profile with track profile.
    NOTE: Holes will be predrilled every 7-7/8″ [200].
    2.5.3 Secure with proper fasteners.
    NOTE: Be sure fasteners are flush with track to avoid rollers catching protruding fasteners.
    2.6 Installing U-channel for sidelitedormakaba L80 Muto Comfort Ceiling
Mount with Dormotion and Sidelites Glass - sidelite 2.6.1 Install gaskets as shown. Trim to correct length.
    2.6.2 Secure u-channel to floor using appropriate fasteners.
    NOTE: Ensure u-channel is plumb and the back of the u-channel profile aligns with back of sidelite profile.
    2.7 Installing sidelite glassdormakaba L80 Muto Comfort Ceiling Mount
with Dormotion and Sidelites Glass - sidelite glass 2.7.1 Place setting blocks into u-channel.
    2.7.2 Spray inside of u-channel with glass cleaner.
    2.7.3 Lift glass up and into sidelite profile.
    2.7.4 Lower glass into u-channel.
    2.7.5 Ensure there is 1/8″ [3] gap between wall and edge of sidelite glass.
    2.7.6 If using tempered laminated glass, gently press glass panel against u-channel gasket and dispense silicone along full length of non-gasket side of U-channel.
    2.8 Installing sidelite glass filler paneldormakaba L80 Muto Comfort
Ceiling Mount with Dormotion and Sidelites Glass - filler
panel 2.8.1 Fit filler panel in to gap of door panel section in sidelite profile
    2.9 Installing sidelite glass gasketdormakaba L80 Muto Comfort Ceiling
Mount with Dormotion and Sidelites Glass - glass gasket 2.9.1 Cut gasket to length per chart above.
    2.9.2 Press gasket in between sidelite glass and sidelite profile.
    2.10A Installing the roller carriers: on monolithic glass ONLYdormakaba
L80 Muto Comfort Ceiling Mount with Dormotion and Sidelites Glass - monolithic
glass ONLY NOTE: FULLY CLEAN SURFACE OF GLASS WITH AN ALCOHOL-BASED MILD GLASS AND SURFACE CLEANER.
    ENSURE GASKET IS FREE OF DEBRIS.
    ENSURE ROLLER CARRIER WHEELS ARE FREE OF DEBRIS.
    2.10A.1 Slide roller carriers onto glass.
    2.10A.2 Slide glass gasket and metal shim between glass and roller carrier.
    NOTE: Orient gasket with rubber side facing the glass.
    2.10A.3 Secure roller carriers to glass using appropriate-size hex key at 10 ft lbs [14 Nm].
    2.10B Installing roller carriers: on tempered lamiate glass ONLYdormakaba
L80 Muto Comfort Ceiling Mount with Dormotion and Sidelites Glass - lamiate
glass ONLY NOTE: THE RECOMMENDED ADHESIVE’S SET-UP TIME IS 20 MINUTES FOR THE DUO-PAK CARTRIDGES.
    NOTE: USE 1:1 RATIO PLUNGER WITH THE 3M™ Scotch-Weld™ Urethane Adhesive.
    NOTE: FULLY CLEAN SURFACE OF GLASS WITH AN ALCOHOL-BASED MILD GLASS AND SURFACE
    CLEANER. ENSURE NO DEBRIS IS ON THE GASKET.
    ENSURE ROLLER CARRIER WHEELS ARE FREE OF DEBRIS.
    2.10B.1 Slide carriers onto glass.
    2.10B.2 Replace existing gasket with TLG gasket.
    2.10B.3 Slide laminated glass gasket and metal shim between glass and roller carrier.
    NOTE: Orient gasket with rubber side facing the glass.
    2.10B.4 Replace existing set screws with vented set  screws.
    2.10B.5 Tighten vented set screws at 4 ft lbs [5Nm].
    NOTE: Onto scrap material, first dispense approximately 12″ of 3M™ Scotch-Weld™ Urethane Adhesive prior to application to prevent mixing errors and ensure optimal hardening.
    2.10B.6 Dispense adhesive into vented set screws on both sides of carrier.
    Stop application when adhesive can be seen past edge of roller carrier.
    MUTO Comfort 11-2023936049
    Roller carriers
    DO NOT WIPE any excess adhesive from glass surface. Allow adhesive to dry and scrape off glass surface with a beveled-edge chisel or putty knife.
    NOTE: Keep glass flat during curing process.
    NOTE: See chart in Specifications section for appropriate curing time.
    2.11 Install DORMOTION start/stopdormakaba L80 Muto Comfort Ceiling
Mount with Dormotion and Sidelites Glass - DORMOTION
start NOTE: Determine a pin length based upon how square and plumb the opening is.
    2.11.1 If required, change pin in start/stop assembly.

    • Remove hex screws.
    • Remove existing pin and plate.
    • Swap in appropriate pin and plate.
    • Replace hex screws.

2.11.2 Slide start/stop onto glass.
2.11.3 Center equally between the carriers.
2.11.4 Slide glass gasket between start/stop and glass.
NOTE: Orient with gasket facing glass.
2.11.5 Secure start/stop via set screws.
2.12 Disengaging the anti-jumpdormakaba L80 Muto Comfort Ceiling Mount
with Dormotion and Sidelites Glass - Disengaging the anti-
jump 2.12.1 Disengage the anti-jump on roller carrier.
NOTE: Using the appropriate-size hex key, push antijump adjustment crew IN and turn COUNTER- CLOCKWISE 90° to disengage anti-jump.
2.13 Install glass/rollers in track
If installing/hanging tempered laminated glass panels, ensure carrier adhesive has cured for 48 hours. See Specifications for more information on cure time.dormakaba L80 Muto Comfort Ceiling Mount with Dormotion and
Sidelites Glass - rollers in track ENSURE ROLLERS AND TRACK ARE FREE OF DEBRIS.
2.13.1 Place glass on setting blocks on floor for stability.
2.13.2 Tip glass and rollers upward and rest rollers on track.
2.14 Install floor guidedormakaba L80 Muto Comfort Ceiling Mount with
Dormotion and Sidelites Glass - Install floor guide ANTI-JUMP IS DISENGAGED!
2.14.1 Align centerline of glass with centerline of floor guide.
2.14.2 Be sure the glass is plumb.
2.14.3 Mark appropriate floor guide measurements.
2.14.4 TEMPORARILY REMOVE GLASS AND ROLLERS FROM TRACK.
2.14.5 Pre-drill into mounting surface using a 5/16″ drill bit.
2.14.6 Secure floor guide anchor with included fasteners.
2.15 Install floor guide: continueddormakaba L80 Muto Comfort Ceiling
Mount with Dormotion and Sidelites Glass - floor guide 2.15.1 SET GLASS AND ROLLERS ONTO TRACK.
2.15.2 Slide floor guide over floor guide anchor and tighten with set screws.
2.15.3 Remove setting blocks.
NOTE: Be sure glass is centered in floor guide.
2.15.4 Adjust using set screws.
2.16 Engaging anti-jumpdormakaba L80 Muto Comfort Ceiling Mount with
Dormotion and Sidelites Glass - Engaging anti-jump 2.16.1 Engage anti-jump on roller carrier.
2.16.2 Using appropriate-size hex key, push anti-jump adjustment screw IN and turn CLOCKWISE 90° to engage anti-jump.
2.17 Adjustment door heightdormakaba L80 Muto Comfort Ceiling Mount
with Dormotion and Sidelites Glass - Adjustment door
height 2.17.1 Set height of glass door.
2.17.2 Loosen height adjustment locking screws of carrier.
2.17.3 Using appropriate-size hex key, turn height adjustment screw CLOCKWISE or COUNTERCLOCKWISE to raise or lower glass. NOTE: Be sure glass is level during this adjustment.
2.18 Adjustment end stop location: LEADING end stopdormakaba L80 Muto
Comfort Ceiling Mount with Dormotion and Sidelites Glass - LEADING end
stop Adjustment end stop location: TRAILING end stopdormakaba L80 Muto
Comfort Ceiling Mount with Dormotion and Sidelites Glass - TRAILING end
stop 2.19 Install DORMOTION unitsdormakaba L80 Muto Comfort Ceiling
Mount with Dormotion and Sidelites Glass - DORMOTION
units RH Dormotion -door closed
2.19.1 Rotate RH DM fastening plates.

  • Using 4 mm hex key, loosen fastening plate hex screws.

  • Rotate fastening plates until they are parallel to the DM unit (Fig. 19.2)

  • Snug hex screws.
    2.19.2 Move door to close position.

  • For installation of RH DM unit, door must be in the closed position against bumper.

2.19.3 Align DM unit in track, engage DM hook in DM trigger.

  • Align DM unit in track (Fig. 19.7).

  • Slide DM unit over the DM trigger block until the DM hook engages the DM trigger (Fig. 19.4)
    2.19.4 Use adjustment tool to set DM unit final position.

  • Place adjustment tool flat against DM unit with fork between DM hook and DM end stop (Fig. 19.5).

  • Slide DM unit over until hook and DM end stop are against the fork. This sets 5 mm gap (fork gap).

  • Trigger height: Adjust so trigger sets on top of adjustment tool (Para. 2.20).
    2.19.5 Secure the DM unit in position.

  • NOTE: Insure door is fully closed against bumper before performing this step.

  • Using 4 mm hex key, tighten DM unit fastening plate socket head cap screws . Fastening plates must engage the track (Fig. 18.6 and .8).

Torque Socket head cap screws 3 ft lbs [4 Nm]dormakaba L80 Muto Comfort
Ceiling Mount with Dormotion and Sidelites Glass - LH DM
unit LH Dormotion -door open
2.19.6 Rotate DM fastening plates.

  • Using 4 mm hex key, loosen fastening plate hex screws.
  • Rotate fastening plates until they are parallel to the DM unit (Fig. 19.10)
  • Snug hex screws.

2.19.7 Move door to open position.

  • For installation of LH DM unit, door must be in the open position against bumper.

2.19.8 Align DM unit in track, engage DM hook in DM trigger.

  • Align DM unit in track (Fig. 19.15).

  • Slide DM unit over the DM trigger block until the DM hook engages the DM trigger (Fig. 19.12)
    2.19.9 Set DM unit final position.

  • Place adjustment tool flat against DM unit with fork between DM hook and DM end stop (Fig. 19.13).

  • Slide DM unit over until hook and DM end stop are against the fork. This sets 5 mm gap (fork gap).

  • Trigger height: Adjust so trigger sets on top of adjustment tool (Para. 2.20).
    2.19.10 Secure the DM unit in position.

  • NOTE: Insure door is fully open against bumper before performing this step.

  • Using 4 mm hex key, tighten DM unit fastening plate socket head cap screws . Fastening plates must engage the track (Fig. 19.16).

Torque
Socket head cap screws 3 ft lbs [4 Nm] 2.20 Adjust start/stop pin height (if necessary)dormakaba L80 Muto Comfort Ceiling Mount with Dormotion and
Sidelites Glass - fig 2.21 Cover clipsdormakaba L80
Muto Comfort Ceiling Mount with Dormotion and Sidelites Glass - Cover
clips 2.21.1 Insert cover clips into track. (One clip per foot)
2.21.2 Insert perpendicular to track, and turn CLOCKWISE to snap into place.
2.22 Cover spacersdormakaba L80 Muto Comfort Ceiling Mount with
Dormotion and Sidelites Glass - Cover clips 2.22.1 Tip cover spacers into outer most edge of track.
2.22.2 Place one at each end of track as shown.
2.22.3 Tighten at at 1 ft lbs [1Nm] or hand tighten.
2.23 Install brush profiledormakaba L80 Muto Comfort Ceiling Mount with
Dormotion and Sidelites Glass - brush profile 2.23.1 Measure and cut brush to appropriate length.
2.23.2 Slide brush into cover.
2.24 Install view protection clipsdormakaba L80 Muto Comfort Ceiling
Mount with Dormotion and Sidelites Glass - protection
clips 2.24.1 Slide door open until it meets the end stop.
2.24.2 Measure and cut view protection profile to fit into empty sliding portion of track – 3/16″ [5].
2.24.3 Snap view protection clips onto inside of cover as shown.
2.24.4 Use minimum 1 clip per foot of profile.
Exception: If profile is minimum of 1 foot in length, use 2 clips.
2.25 Install cover and view protection profiledormakaba L80 Muto
Comfort Ceiling Mount with Dormotion and Sidelites Glass - fig
1 2.25.1 Secure cover to clips and snap into place.
NOTE: Roll cover from the bottom upwards. Ensure the bottom of the cover is supported by the groove in the cover clip
2.25.2 Tip view protection profile up into track and snap down into cover and onto track as shown.
2.26 Install end capsdormakaba L80 Muto Comfort Ceiling Mount with
Dormotion and Sidelites Glass -end caps 2.26.1 Snap sidelite profile end caps into sidelite profile.
2.26.2 Snap end caps into cover.

https://bit.ly/3v0h9lh?r=qr
Scan for product details and downloads.
Call 800-523-8483 or visit
[email protected]
for assistance or warranty information
dormakaba USA, Inc.
1 Dorma Drive, Drawer AC
Reamstown, PA 17567

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

dormakaba User Manuals

Related Manuals