KOLINK Unity Meshbay ARGB MIDI Tower Case User Manual

June 16, 2024
KOLINK

UNITY
MESHBAY
ARGB MIDI TOWER CASE
USER MANUAL

KOLINK Unity Meshbay ARGB MIDI Tower Case -

ACCESSORY PACK CONTENTS

KOLINK Unity Meshbay ARGB MIDI Tower Case - contents

PANEL REMOVAL

PANEL REMOVAL

  • Left Panel – Unscrew the two thumbscrews and slide the glass panel backwards.
  • Right Panel – Unscrew the two thumbscrews and slide off.
  • Front Panel – Find the bottom cut out, stabilise the chassis with one hand, and pull from the cutout with a little force until the clips release.

KOLINK Unity Meshbay ARGB MIDI Tower Case - panel

MOTHERBOARD INSTALLATION

MOTHERBOARD INSTALLATION

  • Align your motherboard with the chassis to locate where the stand-offs should be installed.
    Once done, remove the motherboard and fasten stand-offs accordingly.

  • Insert your motherboard I/O plate into the cutout at the rear of the case.

  • Place your motherboard into the chassis, making sure the rear ports fit into the I/O plate.

  • Use the provided motherboard screws to attach your motherboard to the chassis.

KOLINK Unity Meshbay ARGB MIDI Tower Case - panel1

POWER SUPPLY INSTALLATION

POWER SUPPLY INSTALLATION

  • Place PSU in the bottom rear of the case, within the PSU shroud.
  • Align the holes and secure with screws.

GRAPHICS CARD/PCI-E CARD INSTALLATION

VIDEO CARD/PCI-E CARD INSTALLATION

  • Remove the rear PCI-E slot covers as necessary (depending on the slot size of your card)
  • Carefully position and slide your PCI-E card into place, then secure with the add-on card screws supplied.
  • If mounting vertically, remove the verbcal PCI-E slot covers and attach a riser cable to the card (sold separately) before securing with the add-on card screws.

3.5″ HDD INSTALLATION

3.5″ HDD INSTALLATION

  • Plce the 35″ HDD nto/0n top o the HDD bracket and screw in if require.

2.5″ SSD INSTALLATION (REAR)

2.5″ SSD INSTALLATION

  • Remove the bracketfrom the rea o the motherboard plate attach your 257 hive nd then srew backinto place.
  • Placethe 25 HOD/SSD nto/o t9p f the HOD bracket and screw inf requirc,

KOLINK Unity Meshbay ARGB MIDI Tower Case - panel5

TOP FAN INSTALLATION

TOP FAN INSTALLATION

  • Remove the dust fiter from the top of the case.
  • Algn your fan(s] o the srew holeson the tp o the chassis and secure with screws.
  • Reptace yourdust fite once secured

FRONT/SIDE/REAR FAN INSTALLATION

FRONT/SIDE/REAR FAN INSTALLATION

  • Align your an o the screw holes on the chasss and secure with screws.

WATERCOOLING RADIATOR INSTALLATION

WATERCOOLING RADIATOR INSTALLATION

  • Secure the fans ta the radiator, hen asten the aditor inside the chassis by Securing with screws fom the outside.

I/0 PANEL INSTALLATION

I/0 PANEL INSTALLATION

  • Carefully check the labelling of each connector from the I/O panel to identify their function.
  • Cross reference with the motherboard manual to locate where each wire should be installed, then secure one at a time. Please ensure they are installed in the correct polarity to avoid non-function or damage.

Pro Gamersware GmbH
GauBstraBe 1, 10589 Berlin, Deutschland
info@gamersware.com
+49(0)30 83797272
www.kolink.eu | support@kolink.eu

The WEEE symbol indicates that this product must not be disposed of with normal household waste. Through the correct disposal ofthis product, you wil help protect the environment. For more information on the disposal of this product, please contact your local municipality, your waste disposal service or the shop where you purchased the product

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals