ULINE Fountain Roller Kit Instruction Manual
- June 7, 2024
- ULINE
Table of Contents
ULINE Fountain Roller Kit
OPERATION FOUNTAIN ROLLER KIT
INKING
-
Fill the roller with the proper ink.
NOTE: Only use compatible ink. -
Pump 30 to 50 strokes while rolling back and forth on a 6 x 18″ piece of oil board. Continue pumping while rolling. To get uniform distribution of ink, use extra firm pressure on the roller.
NOTE: DO NOT use an absorbent material. -
To provide uniform inking around the entire surface of the roller, the inking path length must be at least 12″. This will eliminate light and dark marking.
-
To test for uniformity of the ink stripe, make a test roll on a clean carton board using normal rolling pressure.
STENCILING
- Pass the roller back and forth over the stencil with straight passes.
- When more ink is needed, pump once or twice before or while stenciling.
- When stenciling a vertical surface, or if one side of the roller inks too heavily, reverse the roller. (Put the rest bar up.)
OPERATING TIPS
- To correct unequal distribution of ink due to rapid usage of ink from one area of the roller, occasionally squeeze the roller extra firmly as you roll it against a test surface.
- Do not allow the roller to become too dry.
- During continuous stenciling, pump the roller once occasionally. Occasional pumping prevents drying or flooding and oversaturation of the foam rubber.
- Fountain Roller Kits work best with .007″ thin oil boards or plastic sheets.
- Be sure to use roller cover to protect the inked roller when not in use.
CLEANING THE ROLLER
- Remove the screw (1) and carefully slide the roller (2) off the spindle (4).
- Wipe and cover the spindle with a cloth to absorb fluids. Fill the reservoir 1/4 full of the proper solvent.
- Shake vigorously and then empty the reservoir.
- Refill the reservoir 1/4 full of solvent and pump to flush the valves, ink passages and orifice.
- Drain all solvent from the fountain roller and refill with proper ink.
REPLACING THE ROLLER
-
Remove the screw (1) and slide the old roller (2) off the spindle (4).
NOTE: Do not pump with the roller removed. Ink will spray from the orifice. -
Wipe and lubricate the spindle (4).
-
Carefully slide the new roller over the spindle and o-rings (3).
REPLACING THE PUMP
- Unscrew the hex nut (6) and remove the entire assembly.
- Lubricate the casting and the new pump (5).
- Attach the new pump assembly with the hex nut.
REPLACING THE O-RINGS
- Being careful to not damage the adjacent bearing surface, remove the o-rings (3) with a knife or other pointed tool.
- Carefully fit the new rings into place.
REPLACING THE SPINDLE
-
Grasp the spindle (4) with pliers on its undercut portion.
-
Unscrew it from the frame.
NOTE: Handle the new spindle gently to avoid burring the orifice bearings in the center of the new spindle. -
Install the new spindle by grasping the undercut portion of the new spindle and screwing into the frame.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>