Muzata TA00 T-Bar Galvanized Steel Main Tee Drop Ceiling System User Guide
- June 7, 2024
- Muzata
Table of Contents
Muzata TA00 T-Bar Galvanized Steel Main Tee Drop Ceiling System
Description
Types
Installation Steps
-
Step 1 – Use a laser level to outline the position of the L tee.
-
Step 2 – Snap a chalk line.
-
Step 3 – Fix L tees in position with screws.
-
Step 4 – Mark positions for tensioners to hang main tees.(The spacing of the main tees is 60cm)
-
Step 5 – Fix the tensioner with the screw.
-
Step 6 – Screw the cover onto the tensioner.
-
Step 7 – Thread cables through brackets.
-
Step 8 – Fasten the cable to the tensioner.
-
Step 9 – Thread main tees through brackets.
-
Step 10 – Adjust the length of the cables until the main tees are level.
-
Step 11 – Install cross tees.
-
Step 12 – Install PVC panels.