Muzata HF20 SL4 Bar Foot Rail Kit User Guide
- May 15, 2024
- Muzata
Table of Contents
Muzata HF20 SL4 Bar Foot Rail Kit
Overview
Muzata Bar Foot Rail Kit provides convenient foot support for people sitting on high stools. It’s made of high-quality stainless steel with great corrosion resistance, rust resistance and water resistance, which is strong, durable and not easily broken so that you will spend less time on maintenance in daily use. Three lengths and two colors are available, suitable for various home decor styles and bar sizes.
Specifications
Name | Model | Material | SPEC | Color |
---|---|---|---|---|
4ft Brushed Bar Foot Rail Kit | HF20 SL4 | T304 stainless steel | 47 1/4 ” | |
(1200mm) | Brushed | |||
6ft Brushed Bar Foot Rail Kit | HF20 SL4 | T304 stainless steel | 70 7/8 ” | |
(1800mm) | Brushed | |||
8ft Brushed Bar Foot Rail Kit | HF20 SL4 | T304 stainless steel | 94 1/2 ” | |
(2400mm) | Brushed | |||
4ft Brass Bar Foot Rail Kit | HF20 PA4 | T304 stainless steel | 47 1/4 ” | |
(1200mm) | Brass | |||
6ft Brass Bar Foot Rail Kit | HF20 PA4 | T304 stainless steel | 70 7/8 ” | |
(1800mm) | Brass | |||
8ft Brass Bar Foot Rail Kit | HF20 PA4 | T304 stainless steel | 94 1/2 ” | |
(2400mm) | Brass |
Items included
For your convenience, we have provided a list of items in the bar foot rail kit packaging below.
Tips: Setscrew’s have been pre-installed on brackets, not individually packaged.
-
Stainless steel tube
-
Brackets
-
End caps
-
Spanner
-
Screws
-
Expansion stoppers
Installation Steps
The installation steps of 4ft brushed bar foot rail kit will be presented below as a template.
For wooden wall
-
Step 1 – Loose the setscrew’s on the brackets ➋.
-
Step 2 – Pass the steel tube ➊ through brackets ➋ , adjust the appropriate position according to your needs.
-
Step 3 – Place the foot rail in the mounting position and mark the positions where the holes will be drilled.
-
Step 4 – Drill the holes with 3/16” drill bit.
-
Step 5 – Clean up the holes.
-
Step 6 – Fix the brackets ➋ on the wall with screws ➎
-
Step 7 – Tighten the setscrews with spanner ➍ to prevent the tube from moving.
-
Step 8 – Cover the end caps ➌
For concrete wall and ceramic wall
-
Step 1 – Loose the setscrews on the brackets ➋.
-
Step 2 – Pass the steel tube ➊ through brackets ➋ , adjust the appropriate position according to your needs.
-
Step 3 – Place the foot rail in the mounting position and mark the positions where the holes will be drilled.
-
Step 4 – Drill the holes with 3/8” drill bit.
-
Step 5 – Clean up the holes and then plug the expansion stoppers ➏.
-
Step 6 – Fix the brackets ➋ on the wall with screws ➎.
-
Step 7 – Tighten the setscrews with spanner ➍ to prevent the tube from moving.
-
Step 8 – Cover the end caps ➌.
Tips
- Loose the setscrews before passing the steel tube through brackets to avoid the tube being scratched.
- Short screwdriver will be necessary when fixing the brackets.
- Please measure the distance and spacing before the installation.
Free design service
We offer personalized railing design service for free. If you are a beginner or not sure about how to do it, please reach us. Our experts can do all the planning, designing and budget work for you without extra charging.
About Muzata
Muzata has helped millions of families with their cable railing projects during the past years. We believe that home renovation should be easy and affordable. So we work with every effort to provide quality products and professional service, to make Muzata a reliable brand.
Follow us
@Muzata railing
@muzata official
@muzata official
@muzata official
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>