DANCO 9D 51930 Toe Touch Polypro Tubing with Chrome Finish Instructions

June 6, 2024
DANCO

Instructions for Bath Drain Assembly
Toe Touch Polypro Tubing w/ Chrome Finish
9D 51930

Instructions

Tools Needed: Strainer Wrench or Pliers (not included), Plumber’s Putty (not included), and Phillips screwdriver (not included)
Note: This product is compatible with standard tub depths of up to 15”.
Extensions (not included) may be necessary for deeper tubs.

  1. Install rubber gasket (A) onto the overflow (B) by folding the 3 small flaps of the gasket onto the overflow tube (B).
  2. Insert the rubber gasket (A) with overflow (B) through the overflow hole of the bathtub.
  3. Roll a piece of plumber’s putty that is about the same thickness of a pencil. Wrap this putty on the underside of the flange of the tub shoe strainer (C), making sure it reaches all the way around.
  4. Align the show elbow (D) under the bathtub with gasket (E) between the bathtub and elbow (D).
  5. Hand tightens the tub shoe strainer (C) through the bathtub into the shoe elbow (D) by turning it clockwise to catch the first few threads of the drain elbow (D). Be careful not to cross-thread. Use a strainer wrench or pliers (not included) to further tighten. Remove any excess putty that may be squeezed out around the edge of the flange of the strainer.
  6. Insert slip nut (F) onto elbow (D) with the nut facing outward. Insert washer (G) onto elbow (D) with larger diameter facing outward. Repeat with overflow (B) tube and second slip nut (F) and second washer (G).
  7. Insert shoe elbow (D) with washer (G) and slip nut (F) into waste tee (H) and secure by tightening the slip nut (F). Adjust the length as needed. Repeat on overflow (B) tube and adjust the length as needed. Only hand-tighten the slip nuts.
  8. Using tapping screws (L), attach retainer plate (M) to the overflow (B) by threading the screws into the smaller holes of overflow (B).
  9. Using screws (K), attach faceplate (J) onto the overflow (B) by threading the screws into the larger holes of overflow (B).
  10. Install Touch Toe assembly (I) by threading it clockwise into tub shoe strainer (C).
  11. Check for leaks. Tighten connections if necessary.

©2021 Manufactured for
Danco, Inc., Irving, TX 75062
51930i

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Related Manuals