IMMERGAS 3.023960 VICTRIX PRO 100 2 ErP Instruction Manual
- October 27, 2023
- IMMERGAS
Table of Contents
IMMERGAS 3.023960 VICTRIX PRO 100 2 ErP
KIT COLLETTORE IDRAULICO CALDAIA AGGIUNTIVA VICTRIX PRO 80-100-120 COD.
3.023960
THIS SHEET MUST BE LEFT WITH THE USER ALONG WITH THE BOILER INSTRUCTION
BOOKLET
General warnings
All products are protected with suitable transport packaging. The material
must be stored in dry environments and protected against weathering.
This instruction manual provides technical information for installing the kit.
As for the other issues related to kit installation (e.g. safety in the work
site, environment protection, injury prevention), it is necessary to comply
with the provisions specified in the regulations in force and principles of
good practice.
Improper installation or assembly of the appliance and/or components,
accessories, kit and devices can cause unexpected problems to people, animals
and objects. Read the instructions provided with the product carefully to
ensure a proper installation.
Installation and maintenance must be performed in compliance with the
regulations in force, according to the manufacturer’s instructions and by
authorized professionally qualified staff, intending staff with specific
technical skills in the plant sector, as envisioned by the Law.
Kit Assembly
Pre-assemble the fitting (14) and the nipple (4) on the 3-way valve (13) by
interposing suitable sealing material such as oakum or similar.
Pre-assemble the fitting (14) on the system shut-off valve (11) by interposing
suitable sealing material such as oakum or similar.
Pre-assemble the nipple (4) on the check valve (3) by interposing suitable
sealing material such as oakum or similar.
Connect the check valve (3) to the manifold (9).
Attention: when installing the check valve (3) make sure that the arrow
on the casing faces the hydraulic manifold kit as shown in figure 2. Also make
sure to interpose suitable sealing material such as oakum or similar on the
connection thread.
Connect the 3-way valves (13), pre-assembled earlier, on the sup-ply (M) of
the boiler (12) and interpose the gasket (1). Connect the shut-off valve (11),
pre-assembled earlier, on the return (R) of the boiler (12) and interpose the
gasket (1).
N.B.: assemble the valves (11 and 13) as shown in fig. 2.
Connect the insulated pipe (2) on the valve (13) and the insulated pipe (5) on
the valve (11) and interpose the gasket (1).
Connect the supply manifold (9) equipped with the check valve to the insulated
pipe (2) and the return manifold (9) to the insulated pipe (5). Make the
connection respecting the arrangement shown in figure 2 and interposing the
gaskets (1) and (6).
After the 1st temperature test, check the tightness of all the pipes.
N.B.: the components downstream of the system, such as the expansion tank,
must be sized according to the flow rate of the system.
If assembling the kit with free outputs on the left side, perform the
installation as shown in figure 3.
Attention: the modular generators, i.e. installed in cascade (set) with an
original connection kit, must be considered a unique appliance, which assumes
the serial number (factory number) of the generator nearest to the INAIL
safety devices. Attention: the VICTRIX PRO boilers have an IPX5D electric
insulation rating and can also be installed outdoors, without ad-ditional
protections. However, if installed outdoors, the relevant piping should be
insulated and the kit protected from the elements.
The boilers must be installed in the configurations and with their own
original set and safety kits. The factory declines all liability whenever the
installer does not use the devices and INAIL-approved original kits or uses
them improperly.
N.B.: before closing the system cut-off cocks or the 3-way valves (3),
the boiler must be switched off.
N.B.: the additional hydraulic manifold kit must not be connected to an
individual boiler.
LEFT OUTLET
Ref. | Kit components description | Qty |
---|---|---|
1 | 44x34x2 gasket | 6 |
2 | Short 90° bend for the insulated supply connection | 1 |
3 | Check valve | 1 |
4 | Nipple | 2 |
5 | Long 90° bend for the insulated return connection | 1 |
6 | Flange gasket DN100 | 2 |
7 | Washer | 16 |
8 | Screw M16x65 | 16 |
9 | Insulated manifold DN100 | 2 |
10 | Nut M16 | 16 |
11 | Ball valve | 1 |
13 | 3-way valve casing | 1 |
14 | Valve fixing fitting | 2 |
M – System flow
R – System return
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>