BATO BAP-2861L 60 x 32 x 22 Inch Corner Bathtub with Left Side Drain Installation Guide

June 11, 2024
BATO

BATO BAP-2861L 60 x 32 x 22 Inch Corner Bathtub with Left Side Drain Installation Guide

⚠ ATTENTION

BEFORE STARTING
OUR PRODUCTS ARE CAREFULLY INSPECTED IN OUR WAREHOUSE AND PACKAGED FOR SHIPPING. ONLY REMOVE THE PROTECTIVE FILM AT THE VERY END OF THE INSTALLATION TO ENSURE MAXIMUM PROTECTION. (EXCEPT WHERE BATH SURFACES WILL BE IN PERMANENT CONTACT WITH ANOTHER SURFACE (I.E., FAUCETS, ETC.).

IT IS VERY IMPORTANT THAT YOU CAREFULLY INSPECT THE PRODUCT BEFORE INSTALLATION. IF A PRODUCT IS DEFECTIVE, PLEASE CONTACT THE COMPANY BEFORE INSTALLATION. THE INSTALLER WILL BE HELD RESPONSIBLE
FOR ANY BREAKAGE OR DAMAGES FOLLOWING THE USE OF A DEFECTIVE PRODUCT. TO PROTECT THE UNIT DURING INSTALLATION, PLACE A CARDBOARD IN THE BOTTOM OF THE BATHTUB. VERIFY THAT THE BATHROOM FLOOR IS
LEVELED AND STRONG ENOUGH TO SUPPORT A MINIMUM WEIGHT OF 1500 LBS. REINFORCE THE EXISTING FLOORING IF NEEDED. THE DRAIN IN YOUR BATHTUB MAY BE TO THE LEFT, THE MIDDLE OR THE RIGHT. VERIFY THE DRAIN LOCATION BEFORE DRILLING A HOLE IN THE FLOOR ACCESS PANEL MUST BE FORESEEN NEAR THE PLUMBING, PUMP AND/OR CONTROL BOXES TO TAKE THEN EASILY APART AND/OR REPAIR THESE COMPONENTS.

REQUIRED TOOLS

IMPORTANT

INSTRUCTIONS ARE TO BE PRESERVED BY FINAL USER.
READ CAREFULLY BEFORE PROCEEDING WITH INSTALLATION.

MAKE SURE THAT THE PLUMBING IS DONE BY A CERTIFIED PLUMBER.
MAKE SURE THAT YOU RESPECT THE PLUMBING CODE AND/OR BUILDING CODE OF YOUR REGION.

INSTALLATION INSTRUCTIONS

Step1: Make sure the studs DUH straight and square.

Step2: After carefully verifying the drain location, drill the drain hole.

Picture for reference only. For accurate measures and installation, you need a certified plumber.

Step 3: If the floor is not flat or level, it is recommended to put down a mortar bed where the base will be positioned.

Step 4: Make sure all the legs of the tub are entirely touch the floor. If not, adjust them or set the level or use a mortar bed for proper installation.

Step 5: Use a level and a bracket to make sure that the bathtub is straight and perpendicular

NOTE: Please a small amount of water in the tub to make sure that the water flows into the tub and not to the ground.

⚠ Bathtub bottom must be in contact with a perfectly straight and level surface.

Step 6: Drill 3/16’’ holes at the stud locations on top flanges

⚠ Gap between flanges and studs must be less than 1/8’’

Step 7: Install the drain onto the tub.

Step 8: Secure the tub Zita the stud Place a cardboard or drop cloth inside the tub, stand inside  to press it to floor then securing to all studs. Secure flanges to studs with 1 1/4″ screws.

⚠ Do not overtight screws as it will crack the flange.

Step: Apply siliconH and remove the protection film. $fter the installation is Secure the tub ith the stud Place a cardboard or drop cloth inside the tub, stand  inside to  wall meet.

⚠ Apply silicone sealer around all eternal Mounts of the bath and leave WR allow it to dry for at leas 24 hours.

For regular cleaning use only mild detergents or warm soap and water. Use only non abrasive cloth or sponge. $lZa\s rinse surfaces after cleaning. Fore using cleaning products, test a small inconspicuous area.