Growatt AXE 5.0L Modular Battery Installation Guide
- June 5, 2024
- Growatt
Table of Contents
Growatt AXE 5.0L Modular Battery
Installation environment
Installation tools
Battery size
Check
Battery operation panel introduction
Floor installation with base
Installation Location Requirements
Note:
- The battery base is required while installing the battery system .
- The maximum quantity of stacking battery pack is 10, if it exceeds 10, please install them by the way of multiple clusters in parallel.
- Please install indoors and ensure the level of the ground.
Installation Procedure
Wiring
Note: 1 ) Please install the communication line first, then plug the
unused RJ45 port and USB port with a dust cover, and finally install the power
line.
2) No cable connection required between battery packs in a single battery
cluster.
Key operation
Power button
Service and contact
Shenzhen Growatt New Energy CO.,Ltd 4-13/F,Building A,Sino- German,Europe,Industrial Park, Hangcheng Ave,Guxing Community,Xixiang Subdistrict, Bao’an District,shenzhen,China. W:www.ginverter.com service@ginverter.com
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>