GROWATT SPH3000-6000 Residential Storage Inverters User Guide

June 5, 2024
Growatt

GROWATT SPH3000-6000 Residential Storage Inverters

GROWATT SPH3000-6000 Residential Storage Inverters
product

Overview

GROWATT SPH3000-6000 Residential Storage Inverters 1

  1. Front panel
  2. Double color LED
  3. LCD screen
  4. Push button
  5. Wall hole
  6. Magnetic devices
  7. Heat sink
  8. PV switch
  9. PV connector
  10. Grounding screw
  11. AC grid connector
  12. Reserved hole
  13. EPS connector
  14. Antenna hole
  15. RS232 port
  16. USB port
  17. Communication ports
  18. Battery power terminal
  19. DIP and Dry connector

Note
If SP-CT is used to communication with hybrid inverter. Please plug in antenna in 14. Machine damage caused by failure to follow the content is not covered by the warranty.

Installation

System Overiew

GROWATT SPH3000-6000 Residential Storage Inverters 2 Note
The installation of this hybrid system needs to comprehensively consider the position of the battery and the power collector.

Installation requirements
Wall mounting

GROWATT SPH3000-6000 Residential Storage Inverters 5

Note
Be careful  Avoid water and eletricity pipes when punching holes in the wall, otherwise it may be dangerous.

Monitoring device installation

GROWATT SPH3000-6000 Residential Storage Inverters 7 GROWATT SPH3000-6000 Residential Storage Inverters
8Follow the installation steps:

  1. Remove the RS232 waterproof cover.
  2. Switch off all the DIP next to RS232
  3. Plug in the communication module.

Connecting cables

Number| Cable name| Type| Recommend module|  Notice:

Lithium battery has its own power line and communication line, so use them.

Hybrid inverter

include the basic communication line. So use them directly.Please make sure all the switches off before connection. For your safety, please do not operation when power on.

---|---|---|---|---
1| grounding cable| Single multi core yellow green copper cable| Cable diameter≥AWG10
2| AC output cable| Two or three different color multi-core copper

cables

| Cable diameter≥AWG10
3| PV input cable| Photovoltaic dedicated cable such as PV1-F| 4mm² – 6mm²
4| Battery power cable| Red and black multi-core copper| Cable diameter≥AWG6
5| Other communication cable| CAT5E|

Grounding

AC GRID and EPS output connection

GROWATT SPH3000-6000 Residential Storage Inverters 10

Screw up connector Release AC connector

The following shows the AC output terminal of the Australian machine connection steps, EPS output terminal connection steps consistent with the above steps.

Release AC Connector

DC connection

PV input terminal installation

GROWATT SPH3000-6000 Residential Storage Inverters 20

Please make sure cable can’t put out from terminal after pressing.

Pull the PV cable make sure there is no loosen or shaking.

GROWATT SPH3000-6000 Residential Storage Inverters 24

Plug in PV terminal

Notes
Please make sure the P V in put voltage/current not beyond the specification before plug in. When installing the PV terminal, pay attention to the distinction between the positive and negative terminals and the one to  one correspondence between the terminals and hybrid inverter. When the terminal is docked, there is aclick sound. After the terminal is docked, gently pull the PV cable to observe whether the terminal is shaking or not.

Battery power line connection

GROWATT SPH3000-6000 Residential Storage Inverters 27

Installation steps as follow
Pass the battery power cables through the tightening nut, waterproof rubber plug and waterproof cover. Press OT terminal at the end of cables. Connect the power cable to hybrid inverter. Be careful the polarity. Be careful not to tighten the tightening nut at this time. After all the communication cables are installed, tighten them together.

Communication cables installation

Seal Ring

GROWATT SPH3000-6000 Residential Storage Inverters 34 When all the communication lines are installed, push the waterproof cover into the bottom, lock the screws fixed to the frame, and finally lock the waterproof cap.

Post installation check

Number Acceptance Criteria Number Acceptance Criteria
1 Hybrid inverter is installed correctly and firmly 2 shineWiFi-S or

shinelink or GPRS is installed correctly and firmly.
3| Cable wiring is reasonable, meets the requirements, no broken skin, etc.| 4| The ground wire confirms the connection and is reliable.
5| All switches off| 6| All wires are correct and securely connected.
7| Cable tie port trimming, no sharp corners, etc.| 8| All exposed terminals are well protected, no vacant ports.
9| Pay attention to packing all the residual materials.| |

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals