GOODWE SEC1000S Smart Energy Controller User Manual

June 5, 2024
GOODWE

GOODWE SEC1000S Smart Energy Controller User Manual

1 Symbols

  • Caution! – Failure to observe a warning indicated in this manual may result in minor or moderate injury.

  • Danger of high voltage and  electric shock!

  • Product should not be disposed as normal household waste.

  • CE Mark

  • Keep Dry – The package/product must be protected from excessive humidity and must accordingly be stored under cover.

  • Components of the product can be recycled.

  • This side up – The package must always be transported, handled and stored in such a way that the arrows always point upwards.

  • No more than six (6) identical packages be stacked on each other.

  • The package/product should be handled carefully and never be tipped over or slung.

Safety and Warning

SEC1000 of Jiangsu GoodWe Power Supply Technology Co.,Ltd (hereinafter referred to as GoodWe) has been designed and tested strictly according to the international safety regulation. As electrical and electric equipment, Safety Regulation shall be followed during installation and maintenance. Improper operation may bring severe damage to the operator, the third party and other properties.

  • Installation. maintenance of SEC1000 must be performed by qualified personnel.in compliance with local electrical standards. regulations and the requirements of local power authorities.
  • To avoid electric shock, make sure the connection between SEC1000 and AC output of  inverter. SEC1000 and Grid, is disconnected before performing any installation or maintenance.
  • When in operation, users should not touch any of the electrical parts of SEC1000 ,like internal components. cables, to avoid electric shock.
  • All electrical installations must comply with local electrical standards and obtain permission from local power authorities before SEC1000 can be connected to the grid by professionals.
  • Before replacing any internal components of SEC1000, the connection between the inverter and SEC1000,the power grid and SEC1000 must be disconnected, and the newly replaced components must meet the requirements of SEC1000. Otherwise, GoodWe will not assume the responsibility and quality assurance for the personal harm.
  • Make sure that the AC input voltage and input current match the rated voltage and current of SEC1000, otherwise the components will be damaged or cannot work properly, and GoodWe will not assume the responsibility and quality assurance for this case.
  • There are lightning protection modules inside. Make sure to connect the internal PE with the ground when installing SEC1000.
  • When in operation, do not plug or unplug cables of SEC1000.
  • SEC1000 must be Installed out of reach of children.
  • Appropriate antistatic measures should be taken.

Mounting

Mounting Instruction
  • SEC1000 must be installed where there is no significant shaking, shock vibration and no rain or snow.
  • SEC1000 shall be installed at eye level for easy operation and maintenance.
  • SEC1000 should not be installed near inflammable and explosive items. Any strong electro magnetic equipment should be kept away from installation site.
  • SEC1000 shall be installed at a location free from explosive hazardous media and free from gas and dust sufficient to corrode metals and destroy insulation.
  • SEC1000 parameters and warning signs must be clearly visible after installation.
  • SEC1000 should be installed without sunshine, rain and snow.
Overview and Packaging

After opening the package, confirm if it is consistent with specification of SEC1000 you purchased.

SEC1000 Overview

  1. Voltage input port
  2. GPRS antenna output port
  3. Current input (external CT) port
  4. LAN network port
  5. Communication port

Package

SEC1000S Installation

Selecting the installation location
The following must be considered when selecting the best location for an SEC1000S.

  • The mount and installation method must be appropriate for the SEC1000S’s weight and dimensions.

  • Install on a sturdy surface.

  • The installation location must be well ventilated.

  • SEC1000S can be placed horizontally or installed vertically.

  • The SEC1000S must be installed vertical or with a backward tilt less 15°.No sidwways tilt is allowed.The connection area must point downwards.Refer to Figure 3.3.1-1.

  • To allow dissipation of heat,and for convenience of dismantling,clearances around the SEC1000S must be no less than the values, refer to figure3.3.1-2.

Mounting Procedure

(1)Drill holes on the wall,8mm in diameter and 45mm deep;Refer to Figure 3.3.2-1.
(2)Fix the wall mounting bracket on the wall with expansion bolts in accessory bag,refer to Figure 3.3.3-2.

(3)Place SEC1000S on the wall-mounted bracket as illustrated in figure 3.3.2-3.

  1. SEC1000S can be placed horizontally to work, as shown in the figure 3.3.2-4.
  2. SEC1000S should be placed in a fixed place indoors as shown in the figure 3.3.2-5.

Port and wiring instructions

Voltage Input Port(L1\L2\L3\N\PE)

Input phase voltage range:AC60V-AC280V;
Input line voltage range:AC100V-AC480V;
AC Frequency:50/60Hz;

urrent Input Port (three sets of CT )

Connect three sets of external CT to the connector at the position shown in figure 3-1(A+A-\B+B-\C+C-).
For detailed external CT connection, please refer to the CT connection manual.
Recommended CT
According to the external current range, GoodWe recommends the following specifications, for reference only.

NO Range of current tested Content Remark

1

|

Imax<250A

| CT 200A Acrel/AKH-0.66(200A/5A)| Backflow CT,closed type(Holesize31mm11mm, 22mm)
CT 250A/5A Acrel/AKH-0.66-K-30×20-250/5| Backflow CT,open type(Opening size:32mm
22mm),accuracy 0.5%
CT 250A/5A Acrel/AKH-0.66-K-60×40-250/5| Backflow CT,open type(Opening size:62mm*42mm),accuracy 1.0%

2

|

250A≤Imax<1000A

| CT 1000A/5A Acrel/AKH-0.66-K-60×40-1000/5| Backflow CT,open type(Opening size:62mm42mm),accuracy 0.5%
CT 1000A/5A Acrel/AKH-0.66-K-80×40-1000/5| Backflow CT,open type(Opening size:82mm
42mm),accuracy 0.5%
CT 1000A/5A Acrel/AKH-0.66-K-80×80-1000/5| Backflow CT,open type(Opening size:82mm82mm),accuracy 0.5%
3| 1000A≤Imax<5000A| CT 5000A/5A Acrel/AKH-0.66-K-140×60-5000/5| Backflow CT,open type(Opening size:142mm
62mm),accuracy 0.2%
CT 5000A/5A Acrel/AKH-0.66-K-160×80-5000/5| Backflow CT,open type(Opening size:162mm*82mm),accuracy 0.2%

LAN Network port

LAN SEC1000S uses this port when accessing a network cable;The access point is as shown in the “NET” position in the figure above.
It is recommended to use network cables better than Super Five Type. After wiring, use the fire-proof mud to seal the port, to ensure its protective performance.

Communication Port

Descriptions of internal communication ports of SEC1000S are as following

Port Description
POWER DC Power Input (Occupied)
NET Ethernet Interface
DI DRED or RCR functional interface
NC reserve
COM1 485 interface1 with Inverter
COM2 485 interface2 with Inverter
COM3 485 interface3 with Inverter
COM4 485 interface4 with SEC1000S internal Meter(Occupied)

Note:The system supports up to 10 inverters, please distribute them equally to each COM port

SEC1000S Grid Connection Diagram

Note: No separate Smart Meter is required in inverter paralleling system along with SEC1000S deployed. This solution is only applicable to the paralleling of on-grid side not to back-up side. There are special requirements on the version of firmware of ET or BT applied in this solution, with DSP version 01 or newer and ARM version 09 or newer. The firmware version of SEC1000S designated for inverter paralleling application should be 01 or newer..

Main functions of SEC1000S

In the Grid Connection Diagram as shown in 3.3.4( quantity of Inverter can be more than one), SEC1000S will have the functions of Active Power Regulation, and Back flow prevention, etc. The corresponding parameters of the inverter are acquired and set through the software ProMate installed in computer for monitoring and configuring SEC1000S. ProMate is a kind of software that can configure Ezlogger Pro, SEC1000S etc. It can modify the network IP address of Ezlogger Pro and SEC1000S, configure the number of connected inverters, time setting, RCR, DRED function, configuration and on-site debugging. First, the user need to install “ProMate” in the computer by downloading ProMate from Internet (http://www.goodwe-power.com/files/ProMate.rar), Please access to the website to download the program and competethe installation. If the user needs to use ProMate software to configure SEC1000S, it needs to be set in dynamic IP(DHCP) or static IP according to the network connection mode.
(1)If the user is in the dynamic IP mode, he/she only needs to connect the SEC1000S NET port to the Router LAN port with the network cable to connect to the network, namely plug and play.
(2)If the user has a static IP, it is necessary to switch SEC1000S to the static IP mode. That is, press the Reload key for about 10 seconds to reset and restart SEC1000S, About 10 seconds after pressing the Reload button, the LED lights on the SEC1000S internal EzLogger Pro Panel will blink from right to left and reset and restart.
After restart, SEC1000S will be switched to static IP mode(default IP:192.168.1.200), then use cables to connect SEC1000S“NET” port to the Ethernet port of the computer.At the same time, the IP address of the computer needs to be modified. The IP address and the default gateway should be set at 192.168.1.xxx segment (1 ≤XXX ≤250 and XXX ≠200). For example, the IP address can be set as 192.168.1.100 and the default gateway as 192.168.1.254.

The interface of Promate is as follows:

On “COM Configuration” part, you should enter the number of inverter connected to each communication port of SEC1000S. For example, you should enter “3” if there are 3 pieces of inverters communicate to COM1, enter “2” if there are 2 pieces of inverters communicate to COM2.

SEC1000S Anti Reverse Current Function
On “DRED & ARCB Setting”part, enter total capacity of the paralleling system and ratio of CT (external) and power limit into grid.
Note: the above steps are mandatory to set up the whole system.
Please check the option “Export Enable” if you want to apply export power limit function in your system.with this function enabled, you can monitor real-time data of grid connection such as output active power, output current, and output voltage.

PV Master configuration for paralleling application (inverter)

You should set communication address for every inverter in the paralleling system, and the address should be different from each other. For example, you may set the address for each inverter from 1 to 10 if there are 10 inverters in the paralleling system. The ID of inverter connected to the communication port should not be duplicate. To monitoring the whole system, all inverters should be registered under the same power plant on GoodWe monitoring platform SEMS Portal.

4 Troubleshooting

If the external CT current is connected in the wrong direction, please reconnect it.
Take the reversed CT current connection of B + and B- as an example to introduce the correcting method, as shown below:

Note: When replacing the meter, all 3 groups of CTs need to be short- circuited.

5 Technology parameter

Name SEC1000S(Smart Energy Controller 1000S)

Technology parameter
Input voltage range| Phase voltage:AC60V~280V
Input voltage frecrency| 50Hz/60Hz
Input current range| 0~5A
Rated power consumption| <10W
Communication with the inverter| RS485
Maximum distance from the inverter| 1000m(use shielded twisted-pair cable)
Maximum number of inverters connected| 60pcs
Communication with terminals| LAN
System Boot Time| 3S(MAX)
Operating temperature range(℃)| -25~60℃
Relative humidity| 0~100%
Level of protection| IP65
Size(LWH mm)| 4620mm×320mm×131mm
Weight| 4KG

Relevant Certification

GoodWe Technologies Co., Ltd.

No. 90 Zijin Rd., New District, Suzhou, 215011, China
www.goodwe.com
service@goodwe.com

Read More About This Manual & Download PDF:

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals