esp EMDLED3WMBULK2 3W LED IP65 Maintained Emergency Bulkhead Instruction Manual
- June 4, 2024
- ESP
Table of Contents
esp EMDLED3WMBULK2 3W LED IP65 Maintained Emergency Bulkhead
GENERAL INFORMATION
Our products are designed to comply with the recommended codes of practice for
emergency lighting of premises and be installed by competent person in
accordance with the relevant wiring regulations.
LUMINAIRE INFORMATION
Rated input supply: AC 240V 50Hz Rated output power: 8 x SMD 2835 LED
Operating Environmental: Temperature:- 0-40°C Operating relative humidity:
Less than 90% Battery Specification: 3.6v 1200mAh NI-CAD Batteries Emergency
Duration: More than 3 Hours. Change over time: Less than 1 second.
MONITORING
Green indicator lamp (LED) normally continuously ‘on’. Indicator lamp goes out
if A.C. supply or charger fails.
NSTALLATION
- Provide power to the required point of installation. Suitable IP rated junctions boxes should be used where required
Mark the location of fixing holes and drill the holes enauring not to infringe
with any joists, gas or water pipes or electrical cables
Remove two screws
-
Pull apart tabs (see Fig 2) to gain access to the connections
-
For non-maintained operation please wire up connector block
-
For maintained operation (luminaire always on)
-
Switch on the power supply and ensure the LED status indicator is illuminated green to ensure the battery and supply are functioning.
After 36 hours on continuous charge a mains failure should be simulated to ensure successful operation. -
For switchable maintained operation see Fig 5
-
Connect the battery via the plug and socket on the PCB
-
Switch on the power supply and ensure the LED indicator is illuminated Green
WARNING
-
This product must be disconnected from the circuit if subjected to any high voltage or insulation resistance testing. Irreparable damage will occur if this instruction is not followed
-
Recommended routine test procedure in accordance with BS 5266 Daily check – check that the status GREEN LED indicator is illuminated
-
Monthly functional test – simulate a mains supply failure for approx. 30 secs by operation of a key switch or circuit breaker. Ensure normal supply
is restored after test and the indicator status LED is illuminated. -
Twice yearly conduct a one hour duration test – simulate a mains supply failure breaker. Ensure normal supply is restored after test and the indicator status LED is illuminated
-
Annual full three hour duration test – conduct a three hour continuous duration test. Simulate a mains supply failure for three hour continuous test by operation of key switch or switichng off circuit breaker. Ensure normal supply is restored after test and the indicator status LED is illuminated.
-
If the luminire fails any of the above tests, please contact a qualified electrician see overleaf foe test b record sheet.
GENERAL
The LEDs fitted in this product or non replaceable.The unit should be
recyled inthe correct manner when it reaches the end of its life. Check local
authorities for where facilities exist. Clean with a soft dry cloth only , do
not use aggressive cleaning
GENERAL INSTRUCTIONS
These instructions should be read carefully and retained after installation
by the end
user for future reference and maintenance.
SAFETY
Installation of this luminare should only be carried out by a qualified electrician or competent person to the current IEE Wiring Regulations
- Please isolate mains prior to installation/maintenance
- Check the total load on the circuit (included when this luminare is fitted )does not exceed the rating of the circuit cable, fuse or circuit breaker
- Please note the IP (Ingress of Protection) rating of this luminaire when deciding the location for installation.