SellEton SL-7510-SS Stainless Steel Indicator Instruction Manual
- June 1, 2024
- selLEton
Table of Contents
SellEton SL-7510-SS Stainless Steel Indicator
Product Information
Specifications
- Platform: 2 pieces
- Ramp A: 4 pieces
- Load Cell: 8 pieces
- Feet: 8 pieces
- Indicator: 1 piece
- Junction Box: 2 pieces
- Signal Cable for Indicator: 2 pieces
- Bending Plate: 2 pieces
- Bolt for Load Cell M24 x 75 mm: 16 pieces
- Expansion Bolt M16 x 100 mm: 28 pieces
- Limit Bolt M20 x 70 mm: 8 pieces
- Bolt for Bending Plate: 16 pieces
- M16 Eyebolt: 2 pieces
Product Usage Instructions
Tools Required for Installation
- Forklift
- Tape
- Churn drill
- Wrench
- Flat screwdriver
- Hammer
Installation Steps
- Make sure the complete installation is done on a level ground.
- Bolt the installation plate to the ramps and place the ramps 87 inches apart in parallel with the forklift.
- Bolt the installation plates to the platform and screw the four threaded level feet into the corners of the platform while lifting it with the forklift.
- Place the platform between the two ramps, ensuring all feet sit inside the rings on the ramps. Adjust height if necessary with a screwdriver.
- Pull out the interface cable from the junction box and run it through the hole on the bottom. Connect it to the indicator.
- Repeat steps for the other set.
- Plug the connectors on the interface cables to the ports of the indicator.
- For permanent use, install anchoring bolts to the ramps.
FAQ
Q: What should I do if the indicator is not displaying accurate readings?
A: Check the connections between the load cells and the indicator. Ensure they are securely plugged in and not damaged. Recalibrate the system if needed.
Q: Can I use this product outdoors?
A: The product is designed for indoor use. Exposure to outdoor elements may affect its performance and longevity.
Q: How often should I check and calibrate the scale?
A: It is recommended to perform regular checks for accuracy and calibration at least once a month or as per your usage frequency to maintain precise measurements.
PRODUCT OVERVIEW
WHAT IS IN THE BOX
Scale Components
Bolts details
Tools Required for Installation
- Make sure the complete installation is done on a level ground.
- Bolt the installation plate to the ramps and place the ramps 87″ apart in parallel with forklift .
- Bolt the installation plates to the platform and screw the four threaded level feet into the four corners of the platform while lifting it with the forklift .
- Place the platform between the two ramps, making sure all the feet sit inside the rings on the ramps .
If necessary, adjust the height with a screwdriver from the top.
-
Pull out the interface cable Open the cover on the side and you will find the junction box with a 50ft long cable nested inside. Run the cable (with connector) through hole on the bottom and pull it out from underneath as long as you need .
Close the cover with the original screws after this is finished . -
Follow the same steps to install the other set .
-
Plug the connectors on the interface cables to the 2 ports of the indicator .
-
For permanent use, install anchoring bolts to the ramps .
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>