SDHQ-00-1103-SMK ARB Compressor Switch Mount Kit Instruction Manual

June 1, 2024
SDHQ

SDHQ-00-1103-SMK ARB Compressor Switch Mount Kit

SDHQ-00-1103-SMK-ARB-Compressor-Switch-Mount-Kit-
PRODUCT

Product Specifications

  • Product: SDHQ-00-1103-SMK
  • Description: SDHQ Built ARB Compressor Switch Mount Kit
  • Packing List:
    • Switch Mount Bracket (1)
    • ARB Twin PNP Switch Harness (1)
    • Hardware Package (1)
  • Tech Notes: Harness Fits ARB Dual compressors ONLY
  • Approx. Install Time: 15 minutes
  • Required Tools: 3mm and 4mm Hex Key

Product Usage Instructions

  1. Take your compressor and using the 4mm hex key, remove the M5 bolt holding the compressor body to the frame.
  2. Replace the removed bolt with the mount and supplied hardware, using a 3mm hex key to tighten down the hardware.
  3. Attach the PNP harness to the back of the Switch, then place it in the mount.
  4. Attach the 3-pin connector on the ARB Twin to the connector on the PNP harness and test the switch function.
  5. Enjoy your SDHQ Built ARB Switch Mount!

Important Notes

  • Double check all hardware is installed correctly and tight.
  • Re-torque ALL bolts after 100 miles.

FAQ

Frequently Asked Questions

  • Q: Can this switch mount kit be used with any compressor?
    • A: No, the harness included in this kit is designed to fit ARB Dual compressors ONLY.
  • Q: What tools are required for installation?
    • A: You will need a 3mm and 4mm Hex Key for installing this switch mount kit.

Product Packing List

Kit

  • 1 Switch Mount Bracket / SDHQ-00-1103-5M-A
  • (1) ARB Twin PNP Switch Harness / SDHQ-02-ARB-51
  • (1) Hardware Package / SDHQ-00-1103-5MK-HP
  • (1) M5 – 0.8 x 10mm 5.5. Shoulder Bolt

Kit

SDHQ-00-1103-SMK-ARB-Compressor-Switch-Mount-Kit-FIG-1

Parts List Hardware List Required Tools

(1) Switch Mount Bracket SDHQ -00-1103-SM-A

(1) ARB Twin PNP Switch Harness SDHQ -02-ARB-S1

(1) Hardware Package SDHQ -00-1103-SMK-HP

| (1) M5 – 0.8 x 10mm S.S. Shoulder Bolt| 3mm and 4mm Hex Key
Tech Notes
Harness Fits ARB Dual compressors ONLY

Approx. Install Time: 15 minutes

Installation Instructions

Bolts

SDHQ-00-1103-SMK-ARB-Compressor-Switch-Mount-Kit-FIG-2

  1. Take your compressor and using the 4mm hex key remove the M5 bolt holding the compressor body to the frame.
  2. Replace the removed bolt with the mount and supplied hardware as shown above, using a 3mm hex key tighten down the hardware.
  3. Attach the PNP harness to the back of the Switch, then place it in the mount.
  4. Attach the 3-pin connector on the ARB Twin to the connector on the PNP harness and test the switch function.
  5. Enjoy your SDHQ Built ARB Switch Mount!

Double check all hardware is installed correctly and tight
Re-torque ALL bolts after 100 miles

SDHQ-00-1103-SMK-ARB-Compressor-Switch-Mount-Kit-FIG-4

CONTACT

Follow us on:

  • FB
  • INSTA
  • For questions or help with the installation, please email help@sdhqoffroad.com
  • Store front hours: Mon. – Fri. 8:00am – 5:30pm and Sat. 9:00am – 2:00pm Arizona Time.
  • Inspected and Packaged By: ………………………..
  • Date: ……………………………

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

SDHQ User Manuals

Related Manuals