PHOENIX Mimicoco Cromford Rail Shower Instruction Manual
- June 1, 2024
- Phoenix
Table of Contents
INSTALLATION INSTRUCTIONS
CROMFORD RAIL SHOWER
IN0585_revA
MEASUREMENTS
Mimicoco Cromford Rail Shower
Mark two points 635mm apart vertically.
Drill two Ø6mm holes 21mm apart at both points (4 holes in total).
Always use physical product for accurate measurements.
recommended working pressure
150-500KPa
maximum hot water temperature
75 degrees
NOTE:
-
If the pressure exceeds or is likely to exceed 550kpa, an approved pressure limiting device must be installed.
-
Flush out all pipe work prior to installation.
-
If the water temperature exceeds 75°C, an approved tempering valve must be fitted.
-
Installation should comply with Australian standard AS3500.1 or relevant local authority requirements.
Showers may not be suitable for use within:- Gravity-fed water systems
- Some instantaneous hot water systems; or
- Pressure supply less than 150kPa;
NOTE: The 500kPa maximum water supply pressure does not apply to fire service outlets.
Failure to comply with the above may void all warranties.
WARRANTY:
Please refer to the full warranty statement enclosed with the product before installing.
MAINTENANCE AND CARE:
- Chrome plated surfaces should be cleaned with mild liquid detergent or soap and water.
- Do not use cream cleaners or citrus based cleaning products, as they are abrasive.
- Use of unsuitable cleaning agents may damage the surface. Any damage caused in this way will not be covered by warranty.
DISCLAIMER:
While we aim to ensure the specifications shown are correct at the time of
printing, we reserve the right to make modifications without prior notice.
Always use the physical product measurements for mark-ups and roughing-in as
the line drawing shown may differ from the actual product over time.
*All measurements are shown in millimeters.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>