RELAX4LIFE Awning with Extendable Arms Instruction Manual
- May 15, 2024
- RELAX4LIFE
Table of Contents
RELAX4LIFE Awning with Extendable Arms
Important: Read “Instructions for installation and operation” carefully before installation. Keep the instruction in a safe place for future reference.
Parts Diagram
A-1. Roller(left)
A-2. Roller(right)
A-3. Roller connector
A-A-1. Bolt M4 x 15
B-1. Torsion bar(left)
B-2. Torsion bar(right)
B-3. Torsion bar connector
B-B-1. Bolt M6 x 45
B-B-2. Bolt M6 + Washer Ø6
C-1. Front bar(left)
C-2. Front bar(right)
C-3. Front bar link tube
D-1. Left roller support
D-2. Bolt M10 x 60
D-3. Gear box
D-4. Bolt M6 x 50
E-1. Right roller support
E-2. Round shaft cover
F-1. Square shaft
F-2. Round shaft
G. Bolt M10 x 65
H. Arm shoulder
I. Adjustable bolt M10 x 30
J. Washer Ø10
K. Bolt M10 x 50
L-1. Left arm
L-2. Right arm
M. Fabric
N. Fabric liner
O. Valance
P. Spirit level
Q-1. Front bar wrist support
Q-2. Bolt M8 x 12
Q-3. Self lock nut M10 + Washer
Ø10
R. Plastic cover for front bar
S. Screws
T. Hand Crank
Steps of Assembly
-
Roller Assembly: Insert roller connector (A-3) into right roller (A-2), fasten it with bolt (A-A-1). Link the left roller (A-1) to the connector (A-3), fasten it with bolt (A-A-1). Now you have a full length roller.
-
Front bar assembly: Insert front bar connector (C-3) into right front bar (C-2), fasten with bolt (A-A-1). Link left front bar (C-1) with the connector (C-3), fasten it with bolt (A-A-1). Now you have a full length front bar.
-
Torsion bar assembly: Insert torsion bar connector (B-3) into right torsion bar (B-2), fasten with bolt (B-B-1). Link left torsion bar (B-1) with connector (B-3), fasten with bolt (B-B-1). Now you have a full length torsion bar.
-
Installation of gear box: Combine left roller support (D-1) with gear box (D-3) through bolt (D-4) M6x50, refer to Diagram 1. Then install right roller support (E-1) and round shaft cover (E-2) together as in Diagram 2.
-
Installing of arm shoulder: Assemble arm shoulder (H), bolt M10x65 (G), washer and adjustable bolt M10x30 (I) together, refer to Diagram 3.
-
Torsion bar and arm shoulder assembly: Link torsion bar and arm shoulder, tighten arm shoulder with bolt M10x65 (G) with socket head wrench. Set positions of arm shoulder for both side against different awning sizes. (This step is already done by factory.)
-
Arm shoulder Assembly: Link both left (L-1) and right (L-2) arms with corresponding arm shoulder through bolt Ml0xS0 (K).
Warning: Arms should be tied together during installation to avoid bouncing out and causing injury. -
Spread out both of the fabrics (M) and valance (O) and insert fabric liner (N). Push one end of fabric with liner inserted into gauges on roller, then the other end through front bar. (Attention: The fab ric has two sides: front and back. The back side is with hem facing downwards).
-
Front bar wrist support assembly: Slide spirit level (j) and front bar wrist support (X) into big trough of front bar, put both left and right plastic cover (f) to each end of the bar, then fix the screw(e) to the plastic cover(f).
-
Left roller support with gear box assembly: Hammer left roller support with gear box into torsion bar with gentle strength. Tighten screws with screwdriver.
-
Assembly of whole awning: Insert square shaft (F-1) in roller with fabric into square hole of gear box, then knock round shaft cover (E-2) into right roller support (E-1) and link it with round shaft of right side using hammer, tighten screw on it using screwdriver.
-
Setting position of whole awning: Make sure two arms are tied tightly to torsion bar, move front bar wrist support (Q-1) until it connects with front bar wrist. Align the front bar and roller, tighten bolt (Q-2) of two front bar wrist support upwardly by screwdriver. Then fasten self locking nut MlO (a) with bolts up to 95% tight using ribbon tube spanner. Lastly, setting spirit level (P) in center of two arms, fasten it when awning is opened.
Specification
Product name| Material and surface treatment| Applicable wall
type| Recommended installation height| Applicable weather
---|---|---|---|---
Retractable awning (Please see details on the package)| Materials: Steel
tube, Aluminum alloy, plastic parts, polyester fabric. Service treatment
: tubes: spray paint and oxidation Cloth surface: PU, UV, waterproof|
Reinforced concrete walls, brick walls, and wooden walls| 2.5m – 3.5m| The
products are used to shield sunshine.
Applicable when wind is under level 5. Not suitable for rainy weather.
The lifespan of the product is 5 years (assuming the frame is opened and closed twice a day). Only screws for reinforced concrete walls and brick walls are provided. If you want to install the product on a wooden wall, please seek advice from professional installer.
Parts List
Please prepare the following tools before installation (not included with the product)
-
Power drill with drilling bit
-
Tape.
-
Wrench (wrenches of M10 and M12)
| |
|
Wall Bracket
| Product model| No. Of wall brackets
2
| No. Of expansion bolts
4
---|---|---|---|---
<3m
3.5m – 4.5m| 3| 6
5m| 4| 8
Installation Procedure
-
Measure the distance along the wall where it can be placed. Drill holes for wall brackets on the wall according to the installation distances and height of the wall brackets. The diameter and depth of hole must be the same as expansion bolts.
The holes of each group must be on the same line in transversal direction and vertical direction.
(Note: It is recommended to draw lines on the wall first to ensure precise position and size of the holes) -
Hammer all the expansion bolts into the holes.
Then take down the nuts and washer.
Note: -
The expansion bolts must be hammered into the wall completely.
-
The bolts must be stick out of the wall so that the wall brackets can be installed on it.
-
The nut and washer might be separated from the bolt during process of transportation, please put them back into their original positions before hammer them into the wall.)
-
Take down the original bolts of the wall brackets as shown in the figure, use expansion bolts to fix the wall brackets on the wall.
Do not tighten completely, leave wall brackets to stay on the wall with little movement.
Installation distance between wall brackets
** Awning< 3m| Only 2 wall brackets for each end of torsion bars
---|---
Awning 3.5m – 4.5m| 2 wall brackets at each end of torsion bar, a middle
bracket in between distance of 2 arm shoulders (arm brackets refer to steps of
assembly 6)
Awning> 5m| 2 wall brackets at each end of torsion bar, 2 middle brackets
divide into equal length in between distance of 2 arm shoulders at each end of
torsion bars. (steps of assembly 6)
4. As shown in the figure, we recommend making the awning surface to form an angle of about 80 degrees with the wall when it is open.
A) The height of front bar you desire
L) The length of the arm stretch out
C) The height of wall brackets
You can follow this formula: C= A+ 0.17*L**
-
Install the awning on the wall brackets according to “Installation distances between wall brackets” above, put the original bolts on the wall brackets and tighten them. Finally fasten all expansion bolts.
CAUTION: PROPER LOCATION OF THE BRACKETS IS THE MOST IMPORTANT ASPECT OF THE AWNING INSTALLATION. IT IS CRITICAL THAT YOU FASTEN ALL THE MOUNTING BRACKETS TO STUDS, JOISTS, HEADERS OR OTHER MAJOR STRUCTURAL COMPONENTS.
WARNING: FAILURE TO SECURELY FASTEN ALL THE BRACKETS TO THE WALL COULD RESULT IN THE COLLAPSE OF THE AWNING AND CAUSE PERSONAL INJURY OR DEATH. -
Instruction for front side leveling
-
Loosen the locking nuts.
-
Turn the jack bolt to adjust pitch
-
Adjust the arm until the front side
-
stays in horizontal line.
-
Tighten the locking nuts.
Common Mistakes
Documents / Resources
|
RELAX4LIFE Awning with Extendable
Arms
[pdf] Instruction Manual
Awning with Extendable Arms, Awning, with Extendable Arms, Extendable Arms,
Arms
---|---
References
- Costway - More Than Just Furniture
- Costway - Plus que des Meubles
- Costway - Più che semplici mobili
- COSTWAY - Umebluj dom po swojemu
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>