MYPV AC-THOR IME Conto D4 Modbus MID Instructions

May 15, 2024
MYPV

MYPV Logo Instructions for connecting
AC•THOR / AC•THOR
9s / AC ELWA 2
with IME Conto D4 Modbus MIDMYPV AC THOR IME Conto D4 Modbus
MID

AC-THOR IME Conto D4 Modbus MID

If the RS485 communication connection on the meter is still being used by other devices, communication with my-PV will not be possible!
A connection with the AC ELWA-E is not possible as it does not have Modbus RTU (RS485) communication!

Default settings on my-PV device

Before commissioning, please read the installation instructions supplied with the device as well as the operating instructions available online.
Find the AC•THOR operation manual here.
Find the AC ELWA 2 operation manual here.
We recommend installing the latest firmware on the AC-THOR via the Internet before installation. IME is stored as a signal source from firmware version a0020708.

Communication with IME Conto D4

The combination with IME was tested by my-PV with IME Conto D4 Modbus MID.
According to IME, these types are compatible:

  • CE4TBDTMID
  • CE4TBDTCL1
  • CE4DF3DTMID
  • CE4DF3DTCL1

The my-PV device is connected directly to the meter via three-pole Modbus RTU cabling.
Use a shielded twisted pair cable and connect the shield to earth (GND) at one end!
RTU gateway should be equipped with a 120 Ohm terminating resistor!
When controlled via Modbus RTU, M7 operating mode cannot be used with the AC•THOR!

MYPV AC THOR IME Conto D4 Modbus MID - Modbus

Three pins on the 8-pin connector of the AC•THOR are the Modbus RTU communication connection. The 120 Ohm terminating resistor is not included with the AC THOR!

MYPV AC THOR IME Conto D4 Modbus MID - Modbus 1

On the AC ELWA 2, the connection is identified by RS485, A, B, GND.
The communication connection on the top of the IME Conto D4 Modbus MID test device looks like this (yellow highlighted).

Settings on IME Conto D4

In the setup of the IME meter, the Modbus ID (“Address”) may need to be set to 005 and the baud rate to 19.2 kbit/s so that the communication matches the my- PV default settings.

Settings on my-PV

In the control settings “IME C. D4 MID (Modb RTU)” must be selected.

MYPV AC THOR IME Conto D4 Modbus MID - Settings

Alternatively, these settings can also be made on the web interface. To do this, the my-PV device must also be integrated into the local network.
If there is a ESS/battery in the system and this is to be charged as a priority, then the “control target” should be set to -150 W. Otherwise, we recommend leaving it at -50 W

my-PV GmbH
Betriebsstrasse 12, 4523 Neuzeug
www.my-pv.com
Subject to change.MYPV Logo

Documents / Resources

| MYPV AC-THOR IME Conto D4 Modbus MID [pdf] Instructions
AC-THOR, AC-THOR IME Conto D4 Modbus MID, IME Conto D4 Modbus MID, Conto D4 Modbus MID, D4 Modbus MID, Modbus MID, MID
---|---

References

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

MYPV User Manuals

Related Manuals