MYPV AC ELWA 2 Digital Meter P1 Interface User Guide
- June 12, 2024
- MYPV
Table of Contents
Digital Meter P1 Interface
for AC•THOR / AC•THOR 9s / AC ELWA 2
Quick Start Guide
NOTE: The Digital Meter P1 Interface can be used with AC•THOR from firmware version a0020300 or higher! To install this firmware on already delivered devices, please send us the 16-digit serial number to support@my- pv.com.
Intended Use
The Digital Meter P1 interface is exclusively designed for operation with
AC•THOR, AC•THOR 9s or AC ELWA 2. It connects the displayed utility meter with
the Modbus RTU gateway of the my-PV device. Thus the excess power info in a
photovoltaic system can be received and used without any additional meter.
The Digital Meter P1 interface will be damaged by any wrong usage.
Before commissioning, it is essential that you read the assembly instructions
that accompany the my-PV device, as well as the operation manual available
online.
Find the operation manual here.
|
---|---
<https://www.my-pv.com/en/info/downloads?alias=AC%E2%80%A2THOR%20Operation%20manual>
| https://www.my-pv.com/de/manuals/ac-elwa-2
Scope of delivery
- Digital Meter P1 Interface
- 120 Ohm resistor
Safety indication
Always comply with local regulations for mounting and connection.
Any damage caused by ignoring the installation and user manual is not covered
by the manufacturer’s warranty.
Exemption of Warranty and Liability
Any warranty and Liability is excluded for:
- Injury to person and/or damage to property caused bunintended use or in disregard of safety-and user instructions
- Consequential damages
- Unauthorized modification, disassembling or other conversion of the device.
Assembly
Plug the RJ12 socket of the interface into the right port of the displayed
utility meter (P1).
Install a cable with 3 wires (shielded) from the terminal block on the
interface to the Modbus RTU gateway on the my-PV device. Maximum cable length
is 1,000 m Install the 120 Ohm resistor between A and B at the myPV side of
the cable.
Use shielded twisted pair wire for communication!
Setting for Communication
Check if the data output of the meter data needs to be activated by your grid
operator!
At step 3 of the commissioning you have to choose a signal source. Select
“Digital Meter P1” at this step.
The signal source can also be adjusted anytime later on the display under
“Settings” or on the Web-Interface if the my-PV device has an Ethernet
connection with a router.
Troubleshooting
The device does not contain any user serviceable parts.
Call your installer for service.
Disposal of waste
Keep the packaging material or dispose it properly.
Dispose the product at the end of its service life in accordance with the
applicable regulatory requirement.
EU Declaration of Conformity
You can find them at any time on www.my-pv.com
Digital Meter P1 Interface Quick Start Guide, 230628
References
- pv.com is for sale | www.oxley.com
- my-PV – Hot Water and Heating with Your Solar Power
- my-PV – Hot Water and Heating with Your Solar Power
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>