Edge-core Wedge100BF-32X 32 Port 100G Ethernet Switch User Guide

June 17, 2024
Edge-core

Edge-core Wedge100BF-32X 32 Port 100G Ethernet Switch User Guide
Edge-core WedgePort 100G Ethernet Switch

Package Contents

  1. Wedge100BF-32X or Wedge100BF-32QS
    Package Contents

  2. Rack Mounting Kit—2 front-post brackets, 2 rear-post brackets, 20 screws, and 2 ear-locking screws

  3. Power cord—either Japan, US, Continental Europe, UK or China

  4. DC Connector Kit (included with DC PSUs only)—1 connector housing, 3 golden terminal pins, 3 plastic “Y” locking pins

  5. Documentation—Quick Start Guide (this document) and Safety and Regulatory Information

Note : For safety and regulatory information, refer to the Safety and Regulatory Information document included with the switch.

Caution : Risk of explosion if battery is replaced by an incorrect type. Dispose of used batteries according to the manufacturer’s instructions.

Attention : Bisque d’explosion is la batterie Est replace par un type incorrect. Olamines les piles usages conformément aux instructions.

Note : The switch has the Open Network Install Environment (ONIE) software installer pre-loaded on the switch, but no switch software image. Information about compatible switch software can be found at www.edge- core.com

Mount the Switch

**

Mount the Switch
**

  1. Attach each of the front- and rear-post brackets to the switch using four of the included bracket screws.
  2. Use an additional two screws to secure each of the rear-post brackets at the mid-point on the sides of the switch.
  3. Use the screws and cage nuts supplied with the rack to secure the switch in the rack.
  4. Lock the position of the rear-post bracket ears using the included position-locking screws

You can also adjust the rear-post bracket ears to fit different rack depths from 56 cm to 85 cm.

Ground the Switch

****

  1. Ensure the rack on which the switch is to be mounted is properly grounded and in compliance with ETSI ETS 300 253. Verify that there is a good electrical connection to the grounding point on the rack (no paint or isolating surface treatment).
  2. Attach a lug (not provided) to a #14 AWG minimum grounding wire (not provided), and connect it to the grounding point on the switch rear panel. Then connect the other end of the wire to rack ground.

Caution : The chassis ground connection must not be removed unless all supply connections have been disconnected.

Caution : The device must be installed in a restricted access location. It should have a separate protective ground terminal on the chassis that must be permanently connected to a well grounded chassis or frame to adequately ground the device chassis and protect the operator from electrical hazards.

Connect Power

Caution : Be sure to use a correct PSU for your switch model. See the PSUs listed under “Hardware Specifications” in this document.

AC Power
. AC Power

  1. install two universal AC power supply units (PSUs) in the switch.
  2. Connect an external AC power source to the PSUs.

Caution : Use the AC power cord supplied with the switch. For International use, you may need to change the AC line cord. You must use line cord sets that have been approved for the socket type in your country.

**DC Power

**

  1. 48 – 60 VDC
  2. DC Return
  3. Ground

Caution : Use a UL/IEC/EN 60950-1 certified power supply to connect to a DC converter, and a #14 AWG wire (for 48 VDC to 60 VDC PSU) to connect to a DC PSU.
Attention : Utilise use alimentation certified UL/IEC/EN 60950-1 pour le connecter à un convertisseur CC et un cable AWG #14 (pour 48 VDC à 60 VDC) pour vows connecter à use alimentation CC.

DC Terminal Connector Wiring
Use the contents of the DC Connector Kit (included with DC PSUs) to correctly wire the DC PSU connector plug

The DC PSU requires a Bel Power Solutions ZES.00046 Female Pin Connector Terminal. Each connecting wire must be properly crimped to each DC plug terminal pin (included in the DC Connector Kit).

It is recommended to use a Junhong Optronic THB Terminal Crimping Machine with 12A-01 crimping mold and YJD-DP5 crimping tools.

Prepare each wire by striping the jacket back 8mm at the end before crimping it to a DC plug terminal pin.
DC Terminal Connector Wiring

  1. Place a stripped wire end into a golden terminal pin.
  2. Crimp the terminal pin firmly to the wire end.
  3. Insert the crimped terminal pin and wire fully into its correct connector slot (48 VDC, DC Return, or Ground).
  4. Secure the terminal pin in the connector slot using one of the white plastic locking “Y” pins.

Verify Basic Switch Operation

Verify Basic Switch Operation

  1. Verify basic switch operation by checking the SYS LED.
  2. When operating normally, the SYS LED should be blinking blue.

Connect Network Cables

Connect Network Cables

  1. Connect a 100-ohm Category 5e (or better) twisted-pair cable to the 1000BASE-T RJ-45 Management port.
  2. Connect network cables to QSFP28 interfaces:
  • If you are connecting fiber optic cables, install QSFP28 fiber transceivers and then connect fiber optic cabling to the transceiver ports.
    The following transceivers are supported:

    • CLR4 100G
    • LR4/LR4-lite 100G
    • CWDM4 100G
    • Open Optic 100G
  • If you are using twin ax copper cables (DAC cables) for port connections, connect the QSFP28 transceivers on the end of the DAC cables directly into the QSFP28 slots
    The QSFP28 ports can be configured as single-lane 100G mode, dual-lane 50G mode, single-lane 40G mode, forlana 25G mode, or four-lane 10G mode.
    The following cable types are supported:

    • 100 Gbe to QSFP28 100 Gbe cable: 1 m, 2 m, and 3 m
    • 100 Gbe to 2xQSFP28 50 Gbe split cable (Y-cable): 1 m, 2 m, and 3 m
    • 100 Gbe to 4xSFP28 25 Gbe fanout cable: 1 m, 2 m, and 3 m

Hardware Specifications

Switch Chassis

Size (WDHP) 440 x 507 x 44 mm (17.32 x 19.97 x 1.73 inches)
Weight Wedge100BF-32X: 9.8 kg (21.61 lb)
Wedge100BF-32QS: 10.2 kg (22.49 lb)
Temperature Operating: 5° C to 45° C (41° F to 113° F)
Storage: -40° C to 70° C (-40° F to 158° F)
Humidity Operating: 10% to 90% (non-condensing)
Power Consumption Wedge100BF-32X: 512 Watts maximum
Wedge100BF-32QS: 574 Watts maximum

AC 600W PSU (PFE600-12-054NA for Wedge100BF-32X only)

Power Rating 100–240 VAC, 50–60 Hz, 600 Watts
AC Input 100–240 VAC, 50–60 Hz, 8–3 A

AC 1100W PSU (PFE1100-12-054NA for Wedge100BF-32QS only)

Power Rating 100–240 VAC, 50–60 Hz, 1100 W
AC Input 100-240 VAC, 50-60Hz, 12–5A per PS

AC/DC 1100W PSU (PFE1100-12-NAS435 for Wedge100BF-32X only) (not included in BSMI)

AC Input 100–127 VAC, 50–60 Hz, 11 A
200–240 VAC, 50–60 Hz, 6 A
DC Input 200–300 VDC, 6 A

DC 1100W PSU (PFE1100-12-054ND for Wedge100BF-32X only)

DC Input 40–72 VDC, 30 A

Regulatory Compliances

Emissions EN 55032:2015+AC:2016, Class A
EN 61000-3-2:2014, Class A
EN 61000-3-3:2013
FCC Class A
VCCI Class A
CISPR 32:2015
RCM
EAC (Wedge100BF-32X only)
KCC
CCC GB/T9254-2008 (Class A)
BSMI Class A, CNS 13438
Immunity EN 55024:2010+A1:2015
IEC 61000-4-2/3/4/5/6/8/11
Safety UL (CSA 22.2 No 60950-1 & UL60950-1; CSA
22.2 No 62368-1 & UL62368-1)
CB (IEC/EN60950-1 & IEC/EN 62368-1)
CCC GB4943.1-2011
BSMI, CNS 14336-1
SII (Israel)
Taiwan RoHS CNS 15663

Power and Battery Safety

Warning : If your switch uses a lithium battery, do not attempt to replace the battery yourself. Return the switch to the manufacturer for battery replacement.

If the switch contains lithium batteries that are encased in a sealed chassis, do not attempt to open the sealed chassis under any circumstances.

Risk of explosion if the battery is replaced by an incorrect type. Dispose of used batteries according to the instructions.
Bisque d’explosion is la batterie Est replace par un type incorrect. Olamines les piles usages conformément aux instructions.

Caution – Risk of Electrical Shock: To disconnect
power, remove all power cords from the unit.

References

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Edge-core User Manuals

Related Manuals