Safety Information
- All electrical work must be undertaken by a qualified contractor to ensure compliance with the latest edition BS 7671 and IEE/IET wiring regulations.
- Before installing a LED Cambridge fitting or doing any maintenance, ensure the power supply is turned off at the circuit breaker or fuse box.
- This product is designed for permanent connection to fixed wiring; the circuit should be protected with the appropriate MCB of the fuse.
Environment
- Please Do NOT dispose of electrical items or packaging as unsorted waste, use the recycling facilities provided by your local authorities.
PRODUCT DIMENSIONS
Important Warranty Information
The LED Cambridge fitting has a 3-year warranty, which can be extended free of charge to 5 years by registering online via the website address below The registrant must provide the product part number and date of manufacture, which can be found on the label attached to the luminaire housing.
|
http://tinyurl.com/ooyn6wj
---|---
KEY DATA|
---|---
Light Source| LED
Power| 38W / SOW
Luminous Flux| 5000Im / 65001m
Luminous Efficacy| >1301m/W
Colour Temperature| 3000K / 4000K / 5500K
Colour Rendering| >80 CRI
Housing Material| SPCC
Diffuser Material| PC
IP Rating| IP20
Manufacturer| Sealite UK
SUPPLY / EARTH CLASS
220- 240 V AC 50/60 Hz
Fig.1 Mains Input termination|
---|---
Installation procedure: Carefully read the installation instructions and ensure the mains supply is isolated before installation. Please follow the safety information overleaf before carrying out any installation. Please retain this leaflet for future reference.
|
---|---
Replaceable control gear by professional| Replaceable (LED only)light source
by a professional
Step 1: Carefully remove the fitting from the packaging. Using a flat
screwdriver, rotate the retention clip Step
Step 2 : Select the mounting points most suitable for the surface. Mount
the fitting onto the mounting into the open position to release the diffuser.
surface.
Step 3 : For side cable entry, drill out the 20mm cable gland position,
then secure the cable with a Cable Gland. For rear cable entry, select one of
the three pre-cut cable access holes. Select the color temperature on the Tri-
colour switch.
Step 4a : Connect the input wires according to the wiring diagram below.
Step 4b – Dimmable and Dimmable Emergency, please refer to the above QR code
for wiring instructions.
<https://www.tridonic.com/com/en/download/technical/LCA_PRE_LC_EXC_ProductManual_en.pdf>
For Dimmable and Dimmable Emergency, please refer to the above QR Code for
wiring instructions.
Ensure that the Emergency Test Record is completed.
Example of Emergency Test Report
SELF-TEST EMERGENCY INSPECTION GUIDE
About:
Initial Test
Connect LED load, emergency module, battery, and LED driver, then connect
mains supply, this emergency conversion module will automatically start to do
an initial test. If the components are not functioning correctly, the LED
indicator will flash RED. If everything is correct, then it will go into
charge mode.
Functional Test
Functional tests are carried out for 10 seconds automatically every 30
calendar days.
Duration Test
Emergency conversion module will automatically make a full duration test every
180 calendar days to check the capacity of the battery.
Note
If the mains supply is off during the self-test period, the emergency
conversion module would terminate the self-test immediately and go into
emergency mode.
Timer reset functionality
The timer for function and duration test can be set to a particular time of
the day by cycling the un-switched line supply 3 times within 1 minute.
LED STATUS INDICATOR
| Colour| LED indication| Status| Comment
---|---|---|---|---
| Green| Slow flashing green (3sec on, 1sec off)| Charging mode|
| Green| Permanent green| Fully Charged & Operational|
| Green| Fast flashing green (0.1sec on, 0.1sec off)| Function test underway|
| Green| Slow flashing green (lsec on, 1sec off)| Duration test underway|
| Red| Permanent red| Load failure| Open circuit / Short cicuit / LED failure
| Red| Slow flashing red (1 sec on, 1 sec off)| Battery failure| Battery
failed the duration test or function test / No battery
RESET INDICATOR
If faulty status is triggered, the LED indicator will flash RED. To reset the
emergency kit, touch the two reset points for 5-10seconds with a piece of
wire, or a short-circuit needle.
Part Number: | Installation Date: |
---|---|
Luminaire Ref/Location | **In case of difficulty, contact the |
Installation Engineers: Tel ..**
Full Recharge Time 24 Hours| Duration 3 Hours| Lamp Type – LED
ROUTINE INSPECTION TEST RECORD (ENSURE SELF-TEST LED INDICATOR IS DISPLAYING
PERMANENT GREEN STATUS)
| Year 1| Year 2| Year 3| Year 4| Year 5
Monthly Check| Signed| Date| Signed| Date| Signed| Date| Signed| Date|
Signed| Date
Inspection| | | | | | | | | |
Inspection| | | | | | | | | |
Inspection| | | | | | | | | |
Inspection| | | | | | | | | |
Inspection| | | | | | | | | |
Inspection| | | | | | | | | |
Inspection| | | | | | | | | |
Inspection| | | | | | | | | |
Inspection| | | | | | | | | |
Inspection| | | | | | | | | |
Inspection| | | | | | | | | |
Inspection| | | | | | | | | |
NET LED Ltd.
Buckingway Business Park
300 Anderson Road
Cambridge, CB24 4UQ
sales4netled.co.uk
www.netled.co.uk
Technical Helpline: 01223 851505
Email:support@netled.co.uk
www.netled.co.uk/downloads
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>