prescolite 2.0 LFR-4/6R-M Indoor Ceiling Light Instruction Manual

June 16, 2024
prescolite

prescolite 2.0 LFR-4/6R-M Indoor Ceiling Light

Product Information

Specifications

Fixture Module Ceiling Cutout Ceiling Thickness
Standard/Shallow Downlight LFR-4R* .5 to 2.5 inches (12.7 to 63.5mm)
LWW/Adjustable Downlight LFR-6R* .5 to 1.25 inches (12.7 to 31.8mm)

FAQ

  • Q: What is the maximum ceiling thickness supported by the fixture?
    • A: The fixture supports a maximum ceiling thickness of 2.5 inches (63.5mm) for Standard/Shallow Downlight and 1.25 inches (31.8mm) for LWW/Adjustable Downlight.
  • Q: How should I orient the LWW Light Engine?
    • A: Use the arrow mark on the casting flange to determine the orientation and ensure the arrow mark points toward the wall to be illuminated.
  • Q: Can I modify or rewire the factory-installed wiring on the fixture?
    • A: No, it is not recommended to modify or rewire the factory-installed wiring on the fixture as it can compromise safety and proper operation.

Product Usage Instructions

Direct Install of Fixture Module from Below Ceiling

  1. Pull the conduit through the ceiling cut-out (4) and ensure there is enough length to make electrical connections to the Driver/J-Box (2) from below the ceiling.
  2. Place the Driver/J-box assembly (2) above the ceiling surface by inserting the whole assembly through the ceiling cut-out (4) and ensure it is properly placed. Use one hand to install the Driver/J-box (2) and support the light engine assembly (1) with the other hand.
  3. Install the light engine assembly (1) to the ceiling (3) by squeezing all the springs (9), inserting it through the ceiling cutout (4), and gently pushing it against the ceiling. Make sure the upper optic is properly seated to the LED holder and has not become dislodged during shipping or installation of the fixture. For LWW Light Engine, use the arrow mark on the casting flange to determine the orientation and ensure the arrow mark points toward the wall to be illuminated.

View of Adjustment Mechanism

  • Horizontal Rotation Adjustment: Use the horizontal rotation adjustment lock screw (1) to lock or unlock the rotation of the fixture.
  • Vertical Angle Adjustment: Use the vertical angle adjustment lock thumbscrew (2) and the positioning assist handle (3) to adjust the vertical angle of the fixture. The maximum angle is 40 degrees, indicated by the red colored angle indicator groove.

CAUTION: Do not attempt to modify or rewire factory-installed wiring on the fixture. Safety and proper operation of the fixture depend on the integrity of the wiring. Keep these installation instructions for reference.

IMPORTANT SAFETY INFORMATION

READ AND FOLLOW ALL SAFETY INSTRUCTIONS

Follow label information and instructions concerning Wet or Damp Locations, installation near combustible materials, insulation, building materials, and proper lamping. Do not install in areas subject to combustible vapors or gases. Before wiring to power supply and during servicing or relamping, turn off power at fuse or circuit breaker. All servicing or relamping must be performed by qualified service personnel. Product must be grounded to avoid potential electric shock or other potential hazard.

Product must be mounted in locations and at heights and in a manner consistent with its intended use, and in compliance with the National Electrical Code and local codes. The use of accessory equipment not recommended by the manufacturer or installed contrary to instructions may cause an unsafe condition. Do not block light emanating from product in whole or part, as this may cause an unsafe condition. Do not allow items such as drapes, curtains, screens or the like to come into contact with the product or to block light from the product, as this may cause an unsafe condition.

INSTALLATION INSTRUCTIONS

INSTALLATION INSTRUCTIONS LITEFRAME® 2.0 LFR-4/6R-M

CAUTION: TO REDUCE THE RISK OF ELECTRICAL SHOCK, MAKE CERTAIN THAT THE POWER SUPPLY IS OFF BEFORE INSTALLING OR SERVICING THIS FIXTURE!

NOTE: For Ceiling thickness & Cutout dimensions refer Table 1.

For Direct Install of Fixture Module from below ceiling:

  1. Pull the conduit through ceiling cut-out (4) and make sure to have enough length to make electrical connections to the Driver/J-Box (2) from below ceiling.
  2. Press snap button (5) and swing Driver/J-Box cover (6) FIG 1.2. Remove appropriate knockout and assemble appropriate connector for the supply wire used. Connect ground wires to green ground leads. Connect white (common) to white (leads). Connect power supply (line) to black lead(s). Swing the Driver-Box cover (6) closed and snap firmly together with Driver/J-box assembly (2). WARNING: DO NOT pinch wires between Driver/J-Box cover and J-Box. Consult a qualified electrician for all other options that require other wiring configurations.
  3. Place the Driver/J-box assembly (2) above the ceiling surface by inserting the whole assembly through the ceiling cut-out (4) and make sure the Driver/J-box (2) placed well. FIG 1.1.
    • NOTE: Use one hand to install the Driver/J-box (2) and support the light engine assembly (1) with the other hand.
  4. Install the light engine assembly (1) to ceiling (3) by squeezing all the springs (9) inserting it through ceiling cutout (4) and gently pushing it against the ceiling. FIG 1.1
    • NOTE: Ensure the upper optic is properly seated to the LED holder and has not become dislodged during shipping or installation of the fixture. For LWW Light Engine Use the arrow mark on the casting flange to determine the orientation and ensure the arrow mark points toward the wall to be illuminated. FIG 1.3

Table 1

CEILING CUTOUT & THICKNESS DIMENSIONS

Ceiling Cutout
Round Frames| Standard/Shallow Downlight| LWW/Adjustable Downlight
LFR-4R| Ø 4.75″ (Ø 120.7mm)| Ø 4.75″ (Ø 120.7mm)
LFR-6R
| Ø 6.50″ (Ø 165.1mm)| Ø 6.50″ (Ø 165.1mm)
Ceiling Thickness
LFR-4/6R*| .5″ to 2.5″ (12.7 to 63.5mm)| .5″ to 1.25″ (12.7 to 31.8mm)

For Fixture Module installation with optional housings (Non-IC Frame or IC/CP enclosed housing) sold separately:

Prior to Light Engine (1) and Driver/J-box Assembly (2) installation please make sure to install the optional housing (3) into the ceiling per installation instruction included with the housing.

*For Fixture Module installation with housing frame (LFR-RD-H) sold separately:**

  1. Pull the conduit through frame assembly (3)/ceiling cut-out (4) and make sure to have enough length to make electrical connections to the Driver/J-Box (2) from below ceiling.
  2. Press snap button (5) and swing open Driver/J-Box cover (6) FIG 2.2. Remove appropriate knockout and assemble appropriate connector for the supply wire used. Connect ground wires to green ground leads. Connect white (common) to white (leads). Connect power supply (line) to black lead(s). Swing the Driver-Box cover (6) closed and snap firmly together with Driver/J-box assembly (2). WARNING: DO NOT pinch wires between Driver/J-Box cover and J-Box. Consult a qualified electrician for all other options that require other wiring configurations.
  3. Install the Driver/J-box assembly (2) into the fixture by inserting the whole assembly through the ceiling cut-out (4) and align them using curved tab & lance (7) features available in the Driver/J-box (2) & frame assembly (3) respectively. Once into position, the ball catch (8) is ready to snap by pressing down the entire Driver/J-box assembly (2) until you hear a click sound to secure the Driver/J-box (2) into frame assembly (3). FIG 2.3
    • NOTE: Use one hand to install the Driver/J-box (2) and support the light engine assembly (1) with the other hand.
  4. Install the light engine assembly (1) to frame assembly (3) by squeezing all the springs (9) inserting it through ceiling cutout (4) and gently pushing it against the ceiling. FIG 2.1
    • NOTE: Ensure the upper optic is properly seated to the LED holder and has not become dislodged during shipping or installation of the fixture. For LWW Light Engine Use the arrow mark on the casting flange to determine the orientation and ensure the arrow mark points toward the wall to be illuminated. FIG 2.4

For Fixture Module installation with IC or CP enclosed housings (LFR-RD-H-IC or LFR-RD-H-CP):

  1. Pull the Whip wire harness assembly (10) through housing (3)/ceiling cut-out (4) and open the Driver-Box cover (6) Press snap button (5) and swing open Driver-Box cover (6). FIG 3.2 Remove appropriate knockout (Ø .875 KO) and assemble appropriate connector for the supply wire used. Connect ground wires to green ground leads. Connect white (common) to white (leads). Connect power supply (line) to black lead(s) and assemble the Whip assembly strain relief (10) snap firmly together with Driver box assembly (2). Swing the Driver-Box cover (6) closed and snap firmly together with Driver-box assembly (2). WARNING: DO NOT pinch wires between Driver/J-Box cover and Driver-Box. Consult a qualified electrician for all other options that require other wiring configurations.
  2. Install the Driver-Box assembly (2) into the fixture by inserting the whole assembly through the ceiling cut-out (4) and align them using curved tab & lance (7) features available in the Driver-Box (2) & housing (3) respectively. Once into position, the ball catch (8) is ready to snap by pressing down the entire driver box assembly (2) until you hear a click sound to secure the Driver box (2) into housing (3). Refer Sheet 2 FIG 2.3
    • NOTE: Use one hand to install the driver box and support the light engine assembly (1) with the other hand.
  3. Install the Light engine assembly (1) to housing (3) by squeezing all the springs (9) inserting it through ceiling cutout (4) and gently pushing it against the ceiling. FIG 3.1
    • NOTE: Ensure the upper optic is properly seated to the LED holder and has not become dislodged during shipping or installation of the fixture. For LWW Light Engine Use the arrow mark on the casting flange to determine the orientation and ensure the arrow mark points toward the wall to be illuminated. FIG 3.3

FOR ADJUSTABLE ONLY

AIMING ADJUSTMENT: (This can be performed after installation with the power on.)

  1. Loosen the horizontal rotation screw (1) and rotate the mechanism to the desired position. Lock the position by tightening the horizontal rotation screw. Loosen the vertical angle locking thumbscrew (2) and adjust the vertical angle to the desired position. There is a positioning assist handle (3) below the thumbscrew to aid in vertical positioning. Lock the position by tightening the vertical angle locking thumbscrew.
    • NOTE: Ensure the upper optic is properly seated to the LED holder and has not become dislodged during shipping or installation/adjustment of the fixture.

CAUTION: DO NOT ATTEMPT TO MODIFY OR REWIRE FACTORY-INSTALLED WIRING ON THE FIXTURE. SAFETY AND PROPER OPERATION OF THE FIXTURE DEPEND ON THE INTEGRITY OF THE WIRING.

KEEP THESE INSTALLATION INSTRUCTIONS

Contact

currentlighting.com/Prescolite

© 2023 HLI Solutions, Inc. All rights reserved. Information and specifications subject to change without notice.
All values are design or typical values when measured under laboratory conditions.

Prescolite Toll Free Technical Support: 1-800-532-1022
Hours: 8am – 5pm ET

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals