GOODWE GW5000-MS-30 Grid Tied PV Inverter Installation Guide
- June 15, 2024
- GOODWE
Table of Contents
Quick Installation Guide
Grid-Tied PV Inverter
MS Series
(GW5000-MS-30 | GW6000-MS-30
GW7000-MS-30 | GW8500-MS-30 |
GW10K-MS-30 | GW7000-MS-C30 |
GW8000-MS-C30)
Safety Precautions
General Disclaimer
- The information in this quick installation guide is subject to change due to product updates or other reasons. This guide cannot replace the product labels or the safety precautions in the user manual unless otherwise specified. All descriptions here are for guidance only.
- Before installations, read through the quick installation guide. For additional information, please see the user manual.
- All operations should be performed by trained and knowledgeable technicians who are familiar with local standards and safety regulations.
- Check the deliverables for correct model, complete contents, and intact appearance. Contact the manufacturer if any damage is found or any component is missing.
- Use insulating tools and wear personal protective equipment when operating the equipment to ensure personal safety. Wear anti-static gloves, clothes, and wrist strip when touching electronic components to protect the inverter from damage. The manufacturer shall not be liable for any damage caused by static electricity.
- Strictly follow the installation, operation, and configuration instructions in this guide and user manual. The manufacturer shall not be liable for equipment damage or personal injury if you do not follow the instructions. For more warranty details, please visit https://en.goodwe.com/warranty.
Safety Disclaimer
Warning
DC Side:
- Ensure the component frames and the bracket system are securely grounded.
- Connect the DC cables using the delivered PV connectors. The manufacturer shall not be liable for equipment damage if other connectors are used.
- Ensure the DC cables are connected tightly, securely, and correctly. Inappropriate wiring may cause poor contacts or high impedances, and damage the inverter.
- Measure the DC cable using the multimeter to avoid reverse polarity connection. Also, the voltage should be under the max DC input voltage. The manufacturer shall not be liable for the damage caused by reverse connection and extremely high voltage.
- The PV modules used with the inverter must have an IEC61730 class A rating.
AC Side:
- The voltage and frequency at the connecting point should meet the on-grid requirements.
- Additional protective devices like circuit breakers or fuses are recommended on the AC side. Specification of the protective device should be at least 1.25 times the rated AC output rated current.
- Make sure that all the groundings are tightly connected. When there are multiple inverters,make sure that all the grounding points on the enclosures are equipotential bonding.
- You are recommended to use copper cables as AC output cables. If you prefer aluminum cables, remember to use copper to aluminum adapter terminals.
Product:
-
Do not apply mechanical load to the terminals, otherwise the terminals can be damaged.
-
All labels and warning marks should be visible after the installation. Do not scrawl, damage, or cover any label on the device.
-
Unauthorized dismantling or modification may damage the equipment, the damage is not covered under the warranty.
-
Install the inverter away from high magnetic field to avoid electromagnetic interference.
If there is any radio or wireless communication equipment below 30MHz near the inverter, you have to:
• Install the inverter at least 30m far away from the wireless equipment.
• Add a low pass EMI filter or a multi winding ferrite core to the DC input cable or AC output cable of the inverter. -
Warning labels on the inverter are as follows.
|
HIGH VOLTAGE HAZARD.
Disconnect all incoming power and turn off the product before working on it.|
| Delayed discharge. Wait 5 minutes after power off until the components
are completely discharged.
---|---|---|---
| Read through the guide before working on this device.| | Potential risks
exist. Wear proper PPE before any operations.
| High-temperature hazard. Do not touch the product under operation to avoid
being burnt| | Grounding point. Indicates the position for connecting the PE
cable.
****| CE marking| | Do not dispose of the inverter as household
waste.Discard the product in compliance with local laws and regulations, or
send it back to the manufacturer.
Check before Power-on
No. | Check Item |
---|---|
1 | The product is firmly installed at a clean place that is well-ventilated |
and easy-tooperate.
2| The PE, DC input, AC output, and communication cables are connected
correctly and
securely.
3| Cable ties are intact, routed properly and evenly.
4| Unused ports and terminals are sealed.
5| The voltage and frequency at the connection point meet the inverter grid
connection
requirements.
Declaration of Conformity
GoodWe Technologies Co., Ltd. hereby declares that the inverter with
wireless communication modules sold in the European market meets the
requirements of the following directives:
- Radio Equipment Directive 2014/53/EU (RED)
- Restrictions of Hazardous Substances Directive 2011/65/EU and (EU) 2015/863 (RoHS)
- Waste Electrical and Electronic Equipment 2012/19/EU
- Registration, Evaluation, Authorization and Restriction of Chemicals (EC) No 1907/2006 (REACH)
GoodWe Technologies Co., Ltd. hereby declares that the inverter without wireless communication modules sold in the European market meets the requirements of the following directives:
- Electromagnetic compatibility Directive 2014/30/EU (EMC)
- Electrical Apparatus Low Voltage Directive 2014/35/EU (LVD)
- Restrictions of Hazardous Substances Directive 2011/65/EU and (EU) 2015/863 (RoHS)
- Waste Electrical and Electronic Equipment 2012/19/EU
- Registration, Evaluation, Authorization and Restriction of Chemicals (EC) No 1907/2006 (REACH)
You can download the EU Declaration of Conformity on www.goodwe.com.
LED Indicators
Inverters Designed with LCD
Indicator | Status | Description |
---|---|---|
ON = Wi-Fi IS CONNECTED/ACTIVE | ||
BLINK 1 = Wi-Fi SYSTEM IS RESETTING | ||
BLINK 2 = NOT CONNECTED TO THE ROUTER | ||
BLINK 4 = Wi-Fi SERVER PROBLEM | ||
BLINK = RS485 IS CONNECTED | ||
OFF = Wi-Fi IS NOT ACTIVE | ||
ON = THE INVERTER IS FEEDING POWER | ||
OFF = THE INVERTER IS NOT FEEDING POWER AT THE MOMENT | ||
ON = A FAULT HAS OCCURRED | ||
OFF = NO FAULT |
Inverters Designed without LCD
Indicator | Status | Description |
---|---|---|
ON = EQUIPMENT POWER ON | ||
OFF = EQUIPMENT POWER OFF | ||
ON = THE INVERTER IS FEEDING POWER | ||
OFF = THE INVERTER IS NOT FEEDING POWER | ||
SINGLE SLOW FLASH = SELF CHECK BEFORE CONNECTING TO THE GRID | ||
SINGLE FLASH = CONNECTING TO THE GRID | ||
ON = WIRELESS IS CONNECTED/ACTIVE | ||
BLINK 1 = WIRELESS SYSTEM IS RESETTING | ||
BLINK 2 = WIRELESS ROUTER PROBLEM | ||
**** | BLINK 4 = WIRELESS SERVER PROBLEM | |
BLINK = RS485 IS CONNECTED | ||
OFF = WIRELESS IS NOT ACTIVE | ||
ON = A FAULT HAS OCCURRED | ||
OFF = NO FAULT |
Product Introduction
Parts
1. DC switch Locking Hole [1] Communication
Module/RS485-USB
4. Cable Port/USB
Communication Port
7. AC Output Terminal
10. LCD(optional)
13. Heat Sink| 2. DC Switch
RS485/Remote Shutdown/
5. CT/Meter Communication Cable Port
8. PE Terminal
11. Button(optional)| 3. PV Input Terminal [2] DRED/Dry Contact
6. Communication
Cable Port
9. Indicator
12. Mounting Plate
---|---|---
[1] For Australia only.
[2]:GW7000-MS-C30/GW8000-MS-C30: 2x PV+/PV-. Others: 3x PV+/PV-.
Dimensions
Inverter Installation
Space Requirements
Angle Requirements
Installing the Inverter
Electrical Connection
PE Cable
AC Cable
DC Cable
Devalan
MC4
Communication Connection
PIN | Function | Definition | PIN | Function | Definition |
---|---|---|---|---|---|
1 | RS485 | RS485- | 11 | Meter | Meter- |
2 | RS485+ | 12 | Meter+ | ||
3 | Remote Shutdown (For Europe only) or Rapid ShutDown (For North America | ||||
only) or Emergency Power Off(For India only) | RSD- | 13 | CT- | ||
4 | RSD+ | 14 | CT+ | ||
5 | Dry Contact | 1/03- | 15 | DRED |
(For Australia
only)| COM/DRMO
6| 1/03+| 16| REFGEN
7| 1/02-| 17| DRM4/8
8| 1/02+| 18| DRM3/7
9| 1/01-| 19| DRM2/6
10| I/01+| 20| DRM1/5
Communication Module
WiFi kit, LAN kit, 4G kit, GPRS, Bluetooth Kit, Wi-Fi/LAN Kit module: optional.
RS485-USB Cable(Optional): Brazil.
Power On and Off
Commissioning
Commissioning via LCD
Commissioning via SolarGo APP
http://www.sems.com.cn/home/solargo
Monitoring via SEMS Portal App
https://www.semsportal.com/home/AppDownload
For more detailed instructions, scan the QR codes below.
|
---|---
https://www.goodwe.com/Form/column?tpl=downloadcenter
&documenttype=%E7%94%A8%E6%88%B7%E6%89%8B%E5%86%8C&productmodel=DNS%20G3%E7%B3%BB%E5%88%97|
https://en.goodwe.com/Public/Uploads/sersups/WiFi%20Configuration%20Instruction.pdf
|
https://en.goodwe.com/Public/Uploads/sersups/User’s%20Guide%20of%20SolarGo%20App.pdf|
https://en.goodwe.com/Ftp/EN/Downloads/User%20Manual/GW_SEMS%20Portal-User
%20Manual-
EN.pdf
|
---|---
340-00821-01| https://en.goodwe.com/contact-
us.asp
GoodWe Technologies Co., Ltd.
No. 90 Zijin Rd., New District, Suzhou, 215011, China
www.goodwe.com
service@goodwe.com