VIGO VG6023 Houston Frameless Sliding Shower Door Instruction Manual

June 15, 2024
VIGO

VIGO VG6023 Houston Frameless Sliding Shower Door

Product Features

  • Left or right-side opening provides versatility for various bathroom floorplans
  • Includes all mounting hardware
  • Constructed from ANSI Z97.1 and 16 CFR 1201-certified tempered glass for added safety
  • RollerDisk™ Technology allows up to 3/8″ of adjustability to wall shift over time
  • High-quality stainless steel and solid brass hardware resists corrosion and tarnishing
  • All VIGO Shower Doors feature a quality assured Limited Lifetime Warranty

Specifications

Model| Inner Door / Puerta interior / Porte intérieure| Outer Door / Puerta exterior / Porte extérieure| Opening Sizes / Tamaños de apertura / Tailles ouverture| Height / Altura / Hauteur| Door opening width (Max) / Ancho de apertura de puerta (Max) / Largeur ouverture de porte (Max)
---|---|---|---|---|---
VG6023OX6076| 30″ x 75 ½”| 30″ x 75 ½”| 56″ – 60″| 76″| 24 ⅞” – 28 ½”
VG6023OX6066| 30″ x 65 ½”| 30″ x 65 ½”| 56″ – 60″| 66″| 24 ⅞” – 28 ½”

Parts List

  1. Wall mount bracket (2 pc)
  2. Structural rail (1 pc)
  3. Bumper (4 pc)
  4. Rollers (4 pc)
  5. Handle assembly (2 pc)
  6. Door threshold cap (2 pc)
  7. Bottom door guide (1 pc)
  8. Door threshold (1 pc)
  9. Phillips 1 ⅛” screw (4 pc)
  10. Plastic anchor (4 pc)
  11. HEX Screw 1 ⅝” (4 pc)
  12. Plastic anchor (4 pc)
  13. Allen key pack (1 pc)
  14. Door and fixed panel seal strip (3 pc)
  15. Door seal strip with flange (3 pc)

Required Tools and Hardware

  • Flat head screwdriver
  • Level (3ft/91cm)
  • Electric/Nivel drill, 3/8″ drill bit
  • Measuring tape (Cinta métrica / Ruban à mesurer)
  • Utility Knife (Cuchillo de uso / Couteau utilitaire)
  • Hacksaw (Sierra para metales / Scie à métaux)

Installation Steps

  1. Before installing the product, make sure that the wall and the ground are flat.
  2. Place the inner movable door panel inside the shower to ensure that the way of placing the glass will not damage the glass. Be careful to protect the glass corners.
  3. Place the structural track between two walls. Note that the top of the wall sleeve on the track is 1878mm from the ground, and the bottom of the wall sleeve is 1828mm from the ground. Make sure the track is level and wall mount brackets are attached to each end of the structural track.
  4. Mark the outer contour of the wall sleeves at both ends of the track, and take out the track. Use a hexagonal key to loosen the fixing nails on the wall sleeve, slide out the wall sleeve, and outline the wall as shown in the figure set of retainers.
  5. Apply silicone on the inside of the shower, where the wall sleeve is connected to the wall, the door bottom rail and the fixing parts. Note: Do not use the shower for 24 hours after the silicone is applied.
  6. If you notice there is no buffering effect after everything is installed, it is mainly caused by the rebound of the buffer sliding hook in the upper guide rail. A strip tool is required to push the buffer sliding hook to the designated position so that the end of the shock can slide into the buffer and slide together.

Finishing Up
After completing the installation, the finished product should resemble the illustration provided in the manual, with a frameless sliding shower door installed properly.

Warranty and Registration

Register your product to activate your warranty. Use the provided QR code or visit vigoindustries.com/register to register your VIGO Houston Frameless Sliding Shower Door.

Contact Information

VIGO Product Support: 866-591-7792, Option 2. Available Monday – Friday 8:00am – 5:30pm EST.

Service Technico de Productos Vigo: 866-591-7792, Option 2. Available Monday – Friday 8:00am – 5:30pm EST.

Company Information

For more information about VIGO and its products, visit vigoindustries.com.

FAQ

How do I register my VIGO product for warranty?

Use the QR code provided in the installation manual or visit the VIGO Industries registration website.

What tools will I need for the installation?

You will need a flat head screwdriver, level, electric drill with a 3/8

Can the door be installed on either the left or right side?

Yes, the door design allows for versatility to match various bathroom floorplans, with left or right-side opening.

Is there a specific height for the structural track installation?

The top of the wall sleeve on the track should be 1878mm from the ground, and the bottom should be 1828mm from the ground.

What should I do if the door is not level after installation?

Adjust the wheel in both directions with a hexagonal key until the door is level.

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

VIGO User Manuals

Related Manuals