LECTRIC EBIKES frontrack-QS eBike Front Rack Instruction Manual
- June 13, 2024
- LECTRIC eBIKES
Table of Contents
LECTRIC EBIKES frontrack-QS eBike Front Rack
How to correctly install your front rack
MAX Weight Capacity: 75lbs
STEP 1
Remove the headlight using a 5mm allen wrench to unscrew the fixture.
The fender will subsequently unattach. Reconnect the fender using the
screw/washer that previously held in the headlight. Then unplug the cable
connectors.
STEP 2
Place the lowest end of the rack so that it sits above/parallel to the front
tire, while aligning the 4 screw holes to the insertion points located on the
bike’s head tube harness – so that the wiring harness does not interfere with
any turning movements.
STEP 3
Use the hook, located above the screw holes of the front rack, to secure the
wiring harness – so that the wiring harness does not interfere with any
turning movements
STEP 4
Use a 5mm allen wrench to install the screws/washers.
STEP 5
Reinstall the headlight by turning it upside down and attaching it to the
insertion hole located at the front/bottom of the front rack. Then use a 5mm
allen wrench to fasten the screw/washer to the headlight.
STEP 6
Install the cable connector extension cord so that it runs through the center
of the suspension fork.
STEP 7
Install the cable clips to fasten the cable onto the grooves located under the
front rack.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>