antaira LNP-0802C-SFP-24 Series 8 Port Industrial PoE Unmanaged Ethernet Switch Installation Guide

June 13, 2024
antaira

antaira LNP-0802C-SFP-24 Series 8 Port Industrial PoE Unmanaged Ethernet

Switch

antaira-LNP-0802C-SFP-24-Series-8-Port-Industrial-PoE-Unmanaged-Ethernet-
Switch-product

Product Information

  • Product Name: LNP-0802C-SFP-24 Series
  • Brand: Antaira Technologies

Description: 8-Port Industrial PoE+ Unmanaged Ethernet Switch, w/610/100Tx (30W/Port) and 2Gigabit Combo Ports (210/100/1000 RJ45 and 2100/1000 SFP), 12~55VDC Power Input

System Interface/Performance:

  • All RJ45 ports support the auto MDI/MDI-X function
  • Embedded 610/100Tx (30W/Port) and 2Gigabit combo ports (210/100/1000Tx RJ45 and 2100/1000 SFP slots)
  • Store-and-Forward switching architecture
  • 8K MAC address table
  • Jumbo frame supports 9.6K

Power Input & Connection:

  • DC 12 to 55V redundant power, with a 6-pin removal terminal block
  • It is recommended to use a UL-listed industrial power supply

Case/Installation:

  • IP30 protection
  • DIN-Rail and wall mount design

Product Usage Instructions

Ethernet Ports
RJ45 Ports (Auto MDI/MDIX): All RJ45 ports are auto-sensing for 10Base-T, 100Base-TX, or 1000Base-T device connections. Please follow the wiring pin assignment table below for Ethernet port installation.

Pins T568A Color T568B Color
Pin 1 white/green stripe white/orange stripe
Pin 2 green solid orange solid
Pin 3 white/orange stripe blue solid
Pin 4 white/blue stripe orange solid
Pin 5 white/brown stripe brown solid
Pin 6 white/green stripe blue solid
Pin 7 white/blue stripe green solid
Pin 8 white/brown stripe brown solid

Power Input Wiring
Please follow the steps below to insert the power wire:

  1. Ensure the power input voltage is within the range of DC 12 to 55V.
  2. Use a UL-listed industrial power supply for safe and reliable operation.
  3. Locate the 6-pin removal terminal block on the product’s front panel.
  4. Insert the power wire into the corresponding slots of the terminal block, following the correct polarity.
  5. Tighten the screws on the terminal block to secure the connection.

Package Check List

The package contains the following items:

  • 1 – Quick installation guide
  • 1 – LNP-0802C-SFP-24(-T)
  • 1 – Wall mounting bracket set with screws
  • 1 – DC cable –18 AWG & DC jack 5.5 x 2.1mm
  • 1 – Dust cover set

Front Panel Layout

Top Panel View

LNP-0802C-SFP-24 series top panel is equipped with one 6-pin removal terminal block connector for dual DC power inputs (12~55VDC).

Product Overview

System Interface/Performance

  • All RJ45 ports support the auto MDI/MDI-X function
  • Embedded 610/100Tx (30W/Port) and 2Gigabit combo ports (210/100/1000Tx RJ45 and 2100/1000 SFP slots)
  • Store-and-Forward switching architecture
  • 8K MAC address table
  • Jumbo frame supports 9.6K

Power Input & Connection

  • DC 12 to 55V redundant power, with a 6-pin removal terminal block
  • It is recommended to use a UL-listed industrial power supply

Operating Temperature

  • Standard operating temperature model: -10°C to 70°C
  • Extended operating temperature model: -40°C to 75°C

Case/Installation

  • IP30 protection
  • DIN-Rail and wall mount design

LED Indicators

LED Color Description

Power 1

|

Green

| On| Power input 1 is active
Off| Power input 1 is inactive

Power 2

|

Green

| On| Power input 2 is active
Off| Power input 2 is inactive

Fault

|

Red

| On| Power input 1 or 2 is inactive
Off| Both power inputs 1 and 2 are active

PoE Indicators (Port 1~6)

|

Green

| On| The port is supplying power to the powered-device
Off| No powered-device attached or power supplying fails
LAN Port 1~6 (Upper LED)|

Green

| On| Connected to network, 100Mbps
Flashing| Networking is active
Off| Not connected to the network
LAN Port 1~6 (Lower LED)|

Green

| On| Connected to network, 10Mbps
Flashing| Networking is active
Off| Not connected to the network
SFP Port Combo G1~G2 LINK/ACT| Green| On| Connected to network, 1000Mbps
Flashing| Networking is active
Off| Not connected to the network
Amber| On| Connected to network, 100Mbps
Flashing| Networking is active
Off| Not connected to the network
LAN Port Combo G1~G2 (Upper LED)|

Green

| On| Connected to network, 1000Mbps
Flashing| Networking is active
Off| Not connected to the network
LAN Port Combo G1~G2 (Lower LED)|

Green

| On| Connected to network, 10/100Mbps
Flashing| Networking is active
Off| Not connected to network

Quick Installation

Ethernet Ports

RJ45 Ports (Auto MDI/MDIX)
All RJ45 ports are auto-sensing for 10Base-T, 100Base-TX or 1000Base-T device connections. Please follow the wiring pin assignment table below for Ethernet port installation.

RJ45 Ethernet Port Pin Outs


Pins

| ****

T568A Color

| ****

T568B Color

| 10Base-T, 100Base-TX| 1000

Base- T(X)

Pin 1| white/green stripe| white/orange stripe| Rx+| TP0+
Pin 2| green solid| orange solid| Rx-| TP0-
Pin 3| white/orange stripe| white/green stripe| Tx+| TP1+
Pin 4| blue solid| blue solid| unused| TP2+
Pin 5| white/blue stripe| white/blue stripe| unused| TP2-
Pin 6| orange solid| green solid| Tx-| TP1-
Pin 7| white/brown stripe| white/brown stripe| unused| TP3+
Pin 8| brown solid| brown solid| unused| TP3-

Power Input Wiring

Please follow the steps below to insert the power wire:

  1. Insert the positive and negative wires into the PWR1 (V1+, V1-) and PWR2 (V2+, V2-) contacts on the terminal block connector as shown below in Figure 1.
  2. Tighten the wire-clamp screws to prevent the wires from loosening, as shown below in Figure 2.
Industrial Switch Mounting

DIN-Rail Mounting
The DIN-Rail bracket is pre-installed on the industrial Ethernet switch from the factory. Please refer to Figure 3 for a DIN-Rail bracket installation reference. Follow the steps below for installing the industrial switch on the DIN-Rail track:

  1. Insert the top of the DIN-Rail onto the track as shown below in Figure 4.
  2. Lightly pull down the bracket onto the rail as shown below in Figure 5.
  3. Check if the bracket is mounted tightly on the rail.
  4. To remove the industrial Ethernet switch from the rail, do the opposite of the steps above.

Wall Mounting
Follow the steps below to mount the industrial Ethernet switch using the wall mounting bracket as shown below in Figure 6.

  1. Remove the DIN-Rail bracket from the industrial Ethernet switch by loosening the screws.
  2. Place the wall mounting brackets on the top and bottom of the industrial Ethernet switch.
  3. Use the screws to screw the wall mounting bracket on the industrial Ethernet switch.
  4. Use the hook holes at the corners of the wall mounting bracket to hang the industrial Ethernet switch on the wall.
  5. To remove the wall mount bracket, do the opposite from the steps above.

Field Maintenance and Service

  • If the device requires servicing of any kind, the user is required to disconnect and remove it from its mounting. The initial installation should be done in a way that makes this as convenient as possible.
  • Voltage/power lines should be properly insulated as well as other cables. Be careful when handling them so as to not trip over.
  • Do not under any circumstance insert foreign objects of any kind into the heat dissipation holes located in the different faces of the device. This may not only harm the internal layout, but might cause harm to user as well.
  • Do not under any circumstance open the device for any reason. Please contact your dealer for any repair needed or follow the instructions within the manual.

Warranty Policy

Warranty Conditions
Products supplied by Antaira Technologies are covered in this warranty for sub-standard performance or defective workmanship. The warranty is not, however, extended to goods damaged in the following circumstances:

  • Excessive forces or impacts
  • War or an Act of God: wind storm, fire, flood, electric shock, earthquake
  • Use of unqualified power supply, connectors, or unauthorized parts/kits
  • Replacement with unauthorized parts

RMA and Shipping Costs Reimbursement
Customers shall always obtain an authorized “RMA” number from Antaira before shipping the goods for repair or replacement.

  • Within the warranty period (based on the invoice date), all parts and labor are free of charge to the customers.
  • Customers are responsible for the cost of parts and labor if the products are out of warranty.
  • For RMA service, customers are responsible for the shipping expense for shipping the RMA unit(s) to Antaira. Antaira is responsible for the shipping expense via a ground service for the return repair/replacement unit(s) back to customers.

Limited Liability
Antaira would not be held responsible for any consequential losses from using Antaira’s product.

Warranty Period
5-Year Warranty

Anta ira’s Customer Service and Support

Any changes will be announced on the Antaira website.