antaira LMX-2602G-SFP Series 26 Port Industrial Rackmount Gigabit Managed Ethernet Switch Installation Guide

June 3, 2024
antaira

antaira LMX-2602G-SFP Series 26 Port Industrial Rackmount Gigabit Managed

Ethernet Switch

antaira-LMX-2602G-SFP-Series-26-Port-Industrial-Rackmount-Gigabit-Managed-
Ethernet-Switch-PRO

Package Check List

The package contains the following items:

  • 1 – Quick installation guide
  • 1 – LMX-2602G-SFP(-T)
  • 1 – RJ45 dust cover set
  • 1 – Set of rack-mounting brackets and screws
  • 1 – RJ45 to DB9 serial console cable

Front Panel Layout

antaira-LMX-2602G-SFP-Series-26-Port-Industrial-Rackmount-Gigabit-Managed-
Ethernet-Switch-1

Back Panel View
LMX-2602G-SFP series back panel is equipped with one AC power inputs socket (90~264VAC) and one 2-pin removal terminal block for relay output.

antaira-LMX-2602G-SFP-Series-26-Port-Industrial-Rackmount-Gigabit-Managed-
Ethernet-Switch-2

Product Overview

System Interface/Performance

  • All RJ45 ports support the auto MDI/MDI-X function
  • Embedded 2410/100/1000Tx RJ45 ports and 2gigabit combo ports (210/100/1000Tx and 2100/1000 SFP slots)
  • Store-and-forward switching architecture
  • 8K MAC address table

Power Input & Connection

  • AC 90 to 264V redundant power, with AC socket
  • It is recommended to use a UL listed industrial power supply

Operating Temperature

  • Standard operating temperature model: -10°C to 65°C
  • Extended operating temperature model: -40°C to 75°C

Case/Installation

  • IP40 protection
  • Rackmount design

LED Indicators

LED Color Description
Power Green On
Off Power input is inactive
Fault Green On
Red Off 1.  Power input 1 or 2 is inactive

2.  Port link-down / Broken

Master| Green| On| ERPS Owner Mode (Ring Master) is ready
Off| ERPS Owner Mode is not active
Ring| Green| On| ERPS Ring Network is active
Flashing| ERPS Ring works abnormally or misconfigure
Off| ERPS Ring Network is not active
LAN Port 1~24 (Left LED)| | On| Connected to network, 1000Mbps
Flashing| Networking is active
Off| Not connected to network
LAN Port 1~24 (Right LED)| | On| Connected to network, 10/100Mbps
Flashing| Networking is active
Off| Not connected to network
Combo Port 25~26 (Left LED)| | On| Connected to network, 1000Mbps
Flashing| Networking is active
Off| Not connected to network
Combo Port 25~26 (Right LED)| | On| Connected to network, 10/100Mbps
Flashing| Networking is active
Off| Not connected to network
SFP Port 25~26 (Link/Activity)| Green| On| Connected to network, 1000Mbps
Flashing| Networking is active
Off| Not connected to network
Amber| On| Connected to network, 100Mbps
Flashing| Networking is active
Off| Not connected to network

Installation

Ethernet Ports
RJ45 Ports (Auto MDI/MDI-X) All RJ45 ports are auto-sensing for 10Base-T, 100Base-TX or 1000Base-T device connections. Please follow the wiring pin assignment table below for Ethernet port installation.

RJ45 Ethernet Port Pin Outs

Pins| T568A Color| T568B Color| 10Base-T, 100Base-TX| 1000

Base- T(X)

Pin 1| white/green stripe| white/orange stripe| Rx+| TP0+
Pin 2| green solid| orange solid| Rx-| TP0-
Pin 3| white/orange stripe| white/green stripe| Tx+| TP1+
Pin 4| blue solid| blue solid| unused| TP2+
Pin 5| white/blue stripe| white/blue stripe| unused| TP2-
Pin 6| orange solid| green solid| Tx-| TP1-
Pin 7| white/brown stripe| white/brown stripe| unused| TP3+
Pin 8| brown solid| brown solid| unused| TP3-

SFP Slots
The Small Form-Factor Pluggable (SFP) is a compact optical transceiver used in optical communications.
Please follow the steps below for connecting the SFP and LC cable:

  1. Insert the SFP transceiver module into the SFP slot as shown below in Figure 1 (Notice that the triangle mark is at the bottom of the SFP slot). Figure 2 shows the SFP transceiver module was inserted.antaira-LMX-2602G-SFP-Series-26-Port-Industrial-Rackmount-Gigabit-Managed-Ethernet-Switch-7
  2. Insert the fiber cable of the LC connector into the transceiver as shown below in Figure 3.

Power Input Wiring
Please follow the below steps:

  1. Put the power switch into the off position.
  2. Insert the AC power cable into the universal AC socket as shown in Figure 4.
  3. Switch the power switch for power on.

Industrial Switch Mounting
The switch comes with a rack-mounted kit can be mounted in an EIA standard size, 19-inch rack. It can be placed in a wiring closet with other equipment.
Perform the following steps to rack-mount the switch.

  1. Position one plate to align with the holes on one side of the hub and secure it with the smaller plate screws. Then, attach the remaining plate to the other side of the switch.
  2. After attaching both mounting plates, position the switch in the rack by lining up the holes in the plates with the appropriate holes on the rack. Secure the switch to the rack with a screwdriver and the rack-mounting screws.

*Note: For proper ventilation, allow at least 4 inches (10 cm) of clearance on the front and 3.4 inches (8 cm) on the back of the switch. This is especially important for enclosed rack installation.

Field Maintenance and Service

  • If the device requires servicing of any kind, the user is required to disconnect and remove it from its mounting. The initial installation should be done in a way that makes this as convenient as possible.
  • Voltage/power lines should be properly insulated as well as other cables. Be careful when handling them so as to not trip over.
  • Do not under any circumstance insert foreign objects of any kind into the heat dissipation holes located in the different faces of the device. This may not only harm the internal layout, but might cause harm to user as well.
  • Do not under any circumstance open the device for any reason. Please contact your dealer for any repair needed or follow the instructions within the manual.

Warranty Policy

Warranty Conditions
Products supplied by Antaira Technologies are covered in this warranty for sub-standard performance or defective workmanship. The warranty is not, however, extended to goods damaged in the following circumstances:

  • (a) Excessive forces or impacts
  • (b) War or an Act of God: wind storm, fire, flood, electric shock, earthquake
  • (c) Use of unqualified power supply, connectors, or unauthorized parts/kits
  • (d) Replacement with unauthorized parts

RMA and Shipping Costs Reimbursement
Customers shall always obtain an authorized “RMA” number from Antaira before shipping the goods for repair or replacement.

  • Within the warranty period (based on the invoice date), all parts and labor are free of charge to the customers.
  • Customers are responsible for the cost of parts and labor, if the products are out of warranty.
  • For RMA service, customers are responsible for the shipping expense for shipping the RMA unit(s) to Antaira. Antaira is responsible for the shipping expense via a ground service for the return repair/replace unit(s) back to customers.

Limited Liability
Antaira would not be held responsible for any consequential losses from using Antaira’s product.

Warranty Period
5-Year Warranty

Antaira’s Customer Service and Support

*Any changes will be announced on the Antaira website.

Tel: 1-844-268-2472
Fax: 1-714-671-9944
www.antaira.com

References

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

antaira User Manuals

Related Manuals