LEVITON LWHEM Whole Home Energy Monitor User Guide

June 13, 2024
Leviton

LEVITON LWHEM Whole Home Energy Monitor

LEVITON-LWHEM-Whole-Home-Energy-Monitor-PRODUCT-IMG

Product Information

Leviton Load Center Phase Maps

The Leviton Load Center Phase Maps are illustrations designed to simplify the installation process of the Leviton Whole Home Energy Monitor (LWHEM). These maps help identify where the power wires of the device should be terminated based on the location of the 2-pole device used to supply power. Additionally, the maps provide guidance on where to mount the Smart Mains Metering Accessory CTs (LSMMA) for monitoring whole-home energy consumption. The circuit breaker positions labeled in the illustrations are color-coded to match the correct power wire from the Whole Home Energy Monitor for that specific breaker position.

Product Usage Instructions: Installation in a Main Breaker Load Center

Phase A

  • Connect the Service Wire to the corresponding terminal labeled “K” and “L” on the Load Center.
  • Install the CT (Current Transformer) with Black/Blue Wire in
    the designated position indicated by the number.

Phase B

  • Connect the Service Wire to the corresponding terminal labeled “K” and “L” on the Load Center.
  • Install the CT (Current Transformer) with Red/Blue Wire in the designated position indicated by the number.

Note: The position of the CTs may vary depending on whether the panels are inverted or not. Please refer to the instructions for applications with inverted panels.

Product Usage Instructions

Installation in a Main Lug Load Center

Phase A

  • Connect the Service Wire to the corresponding terminal labeled “K” and “L” on the Load Center.
  • Install the CT (Current Transformer) with Black/Blue Wire in the designated position indicated by the number.

Phase B

  • Connect the Service Wire to the corresponding terminal labeled “K” and “L” on the Load Center.
  • Install the CT (Current Transformer) with Red/Blue Wire in the designated position indicated by the number.

Note: The position of the CTs may vary depending on whether the panels are inverted or not. Please refer to the instructions for applications with inverted panels.

For more information, please visit our website at www.leviton.com/loadcenter.SC-012323-dp

Leviton Load Center Phase Maps

  • The Phase Map illustrations are intended to simplify the installation process of your new Leviton Whole Home Energy Monitor (LWHEM), identifying where the device’s power wires should be terminated depending on the location of the 2-pole device you will be using to supply power.
  • The map also provides locations to mount your Smart Mains Metering Accessory CTs (LSMMA) to monitor whole-home energy consumption.
  • The circuit breaker positions labeled in the illustrations are colored in accordance with the correct power wire from the Whole Home Energy Monitor for that breaker position

Installation in a Main Breaker Load Center

LEVITON-LWHEM-Whole-Home-Energy-Monitor-FIG-1

Installation in a Main Lug Load Center

LEVITON-LWHEM-Whole-Home-Energy-Monitor-FIG-2

Leviton Manufacturing Co., Inc.

  • 201 North Service Road, Melville, NY 11747-3138
  • Telephone: 1-800-323-8920 • Tech Line: 1-800-824-3005
  • Mon-Fri 8am-10pm EST, Saturday 9am-7pm EST, Sunday 9am – 5pm EST

Visit our Website at: www.leviton.com/loadcenter.
© 2023 Leviton Manufacturing Co., Inc. All rights reserved.

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals