ZURN AquaSense AV ZER Series Automatic Sensor Operated Battery Powered Flushometer Instruction Manual

June 13, 2024
ZURN

ZURN® AquaSense AV™ ZER Series Automatic Sensor-Operated Battery-Powered

Flushometer Instruction Manual

AquaSense AV™
ZER Series
Automatic Sensor-Operated,
Battery-Powered Flushometer
Installation, Operation, Maintenance and Parts Manual

WARNING: Cancer and Reproductive Harm – www.P65Warnings.ca.gov

LIMITED WARRANTY

All goods sold hereunder are warranted to be free from defects in material and factory workmanship for a period of three years from the date of purchase. Decorative finishes warranted for one year. We will replace at no costs goods that prove defective provided we are notified in writing of such defect and the goods are returned to us prepaid at Sanford, NC, with evidence that they have been properly maintained and used in accordance with instructions. We shall not be responsible for any labor charges or any loss, injury or damages whatsoever, including incidental or consequential damages. The sole and exclusive remedy shall be limited to the replacement of the defective goods. Before installation and use, the purchaser shall determine the suitability of the product for his intended use and the purchaser assumes all risk and liability whatever in connection therewith. Where permitted by law, the implied warranty of merchantability is expressly excluded. If the products sold hereunder are “consumer products,” the implied warranty of merchantability is limited to a period of three years and shall be limited solely to the replacement of the defective goods. All weights stated in our catalogs and lists are approximate and are not guaranteed.

PRIOR TO INSTALLATION

Prior to installing the ZER Flushometer, install the items listed below:

  • Closet or urinal fixture
  • Drain line
  • Water supply line

IMPORTANT:

  • ALL PLUMBING IS TO BE INSTALLED IN ACCORDANCE WITH APPLICABLE CODES AND REGULATIONS.
  • WATER SUPPLY LINES MUST BE SIZED TO PROVIDE AN ADEQUATE VOLUME OF WATER FOR EACH FIXTURE.
  • FLUSH ALL WATER LINES PRIOR TO OPERATION (See Step 9).
  • DIRT AND DEBRIS CAN CAUSE FLUSH VALVE TO RUN CONTINUOUSLY.

The ZER is designed to operate with 20 to 80 psi (138 to 552 kPa) of water pressure. THE MINIMUM PRESSURE REQUIRED TO THE VALVE IS DETERMINED BY THE TYPE OF FIXTURE SELECTED. Consult fixture manufacturer for pressure requirements. Protect the chrome or special finish of this flushometer. DO NOT USE TOOTHED TOOLS TO INSTALL OR SERVICE THE VALVE.

1.) Install stop valve assembly (A) using proper size supply escutcheon and sweat solder adapter kit if applicable. Thread sealing compounds should be used on male NPT threads only.

2.) Prior to inserting the flush valve tailpiece (B) into stop valve, be certain that the O-ring seal (C) is located in O-ring seal groove at the end of the tailpiece and the locking nut (D) and locking snap ring (E) are located as shown. Care should be taken not to damage the O-ring when inserting the tailpiece into the stop valve. If lubrication is needed, wetting the O-ring with water will be sufficient.

3.) Insert the flush valve tailpiece (B) into the stop valve (A) and hand tighten the lock nut (D) to the stop valve. Plumb the entire unit.

_ 4.) _Determine the length of vacuum breaker tube (F) required to join the flush valve and fixture spud. Cut the vacuum breaker tube, if required, to this length. Assemble the vacuum breaker tube assembly and spud nut assembly to the flush valve and fixture spud.

5.) Hand tighten spud nut and vacuum breaker tube nut to fixture and flush valve. Adjust the valve assembly for plumb. Tighten fixture spud nut, vacuum breaker tube nut and lock nut with a wrench. Do not turn water on until batteries are inserted – see 6.

6.) ACTIVATION

Using supplied battery compartment wrench,remove battery compartment from the E-Z Flush™ unit.

Load batteries into compartment tray (note position of batteries in tray), and reinstall battery tray into the E-Z Flush unit.

Secure tray with battery compartment wrench. The last three turns of the wrench will activate the E-Z Flush unit. The E-Z Flush System is now operational.

Your E-Z Flush unit comes preset from the factory. If special circumstances require adjustment of the activation distance, see Appendix A – Adjusting Your E-Z Flush.

The E-Z Flush unit has a 10-minute start-up sequence in which the Object Lock Sensor will flash the User-In-View yellow L.E.D. continuously as long as a user is in view. After the start-up sequence is completed and when the Object Lock Sensor has a user in view, the User-In-View yellow L.E.D. will flash only 3 times after a 5-second delay. This delay prevents needless flushes when someone walks by. Sensor units should not be located across from each other or in close proximity to highly reflective surfaces.

7.) VISUAL INDICATOR GUIDE

8.) ADJUSTING YOUR E-Z FLUSH


STEP A
Use battery compartment wrench to remove battery compartment tray.


STEP B
Pull cover off by rotating battery side forward and out.


STEP C
Sensor Adjustor Tool comes in a built-in storage pocket. Replace after use.

Before the supply water is turned on, be sure all stop valves to the flush valves are closed off tight. The stop valves can be opened and closed by using the adjusting screw located at the center of the stop valve cap (T) , behind the adjusting screw cover if already installed. Stop valve adjustments can only be made by using the adjusting screw. It is not necessary to remove the stop valve cap when making adjustments. If for any reason it becomes necessary to remove the stop valve cap, be certain the water is shut off at the main supply valve.

9.) When all flush valves are connected to the fixtures and water pressure is available, it is recommended that the supply piping be flushed to remove dirt, pipe chips, etc., from system.

Use the following procedure to flush out the supply piping:

A. Remove the main valve body cover . (O)

B. Remove the working parts from the flush valve (P) and (Q) (shown in 9b).

C. Replace the plastic cover (P) and main body cover (O) without reinstalling the working parts.

D. Open the stop valve by using the stop adjusting screw and flush out all debris from pipe and connections.

E. Shut stop, open cover, reinstall the working parts, replace both covers and tighten.

This procedure should also be repeated when the system is drained for seasonal use, as occurs in athletic fields, recreation parks, etc.

10.) The ZER flush valves are preset for fixture volume as marked on the valve cartons. The valve does not require regulation for variation in water pressure within its operating range. To set the flush valve for proper operation, gradually adjust the stop valve open, using the adjusting screw, while actuating the valve until the rate of water flow into the fixture is not excessive, yet is sufficient to adequately evacuate the waste. The final setting for urinals should be such that the fixture will not overflow when the valve is actuated in succession. The stop cap screw cover should be replaced after final adjustments have been made.

APPENDIX A

TO CHANGE ACTIVATION DISTANCE FOR THE OBJECT LOCK SENSOR

  1. Remove battery compartment tray as shown in Step 6.
  2. Remove cover and sensor adjust or tool as shown in Step 6.
  3. Replace battery compartment in E-Z Flush to activate unit.
  4. Press sensor range reset button (the yellow L.E.D. will flash continuously when it has an object in view for the 10-minute reset period).
  5. Stand at desired activation distance.
  6. Use sensor adjust or tool and turn Distance Adjustment Screw all the way down and then turn slowly up until yellow L.E.D. begins to flash.
  7. Ensure Object Lock Sensor is not detecting stall door or wall by closing door, stepping out of sensor path and making sure yellow L.E.D. is not flashing. If sensor locks onto door or wall, unit will not flush properly. Shorten activation distance.
  8. Remove battery compartment, replace sensor adjust or tool and cover. Replace battery compartment tray to reactivate E-Z Flush unit.
  9. After 10-minute start-up sequence, the yellow L.E.D. will flash only 3 times when a user is in view (after a 5-second delay).

WIRING DIAGRAM

TROUBLE SHOOTING GUIDE

AquaVantage® Exposed E-Z Flush Repair Kits

Part Identification

  1. Seal
  2. Collar Gasket
  3. Sensor Module
  4. Manual Overide Push Button
  5. Replacement Sensor Lens
  6. Chrome Plastic Cover
  7. Chrome Metal Cover
  8. Battery Drawer
  9. O-Ring
  10. Allen Wrench
  11. Handle Nut Wrench
  12. Valve Body Cover
  13. Plastic Cover
  14. Trip Mechanism
  15. Diaphragm Repair Kit
  16. Valve Body
  17. Vacuum Breaker Duckbill
  18. Vacuum Breaker Tube
  19. Vacuum Breaker Tube Nut
  20. Spud Nut
  21. Spud Friction Washer
  22. Spud Sleeve
  23. Spud Escutcheon
  24. Tailpiece
  25. Snap Ring
  26. Tailpiece O-Ring
  27. Locking Nut
  28. Setscrew for Cast Wall Flange
  29. Cast Wall Escutcheon
  30. Supply Cover Tube
  31. Sweat Solder Adapter
  32. Stop Body
  33. Piston Seal
  34. Piston
  35. Stop Spring
  36. Guide O-Ring
  37. Piston Guide
  38. Guide Holder
  39. Adjusting Screw
  40. Stop Cap
  41. Snap Cap Screw Cover
  42. Vandal – Resistant Control Stop Cover
  43. Setscrew for Control Stop Cover

Rev. H | Date: 11/11/22 | C.N. No. 144844 | Prod./Dwg. No. FV237

Patent zurn.com/patents

US 1.855.ONE.ZURN CANADA 1.877.892.5216

ZURN.COM

Documents / Resources

| ZURN AquaSense AV ZER Series Automatic Sensor Operated Battery Powered Flushometer [pdf] Instruction Manual
AquaSense AV ZER Series Automatic Sensor Operated Battery Powered Flushometer, AquaSense, AV ZER Series Automatic Sensor Operated Battery Powered Flushometer, Operated Battery Powered Flushometer, Battery Powered Flushometer, Powered Flushometer, Flushometer
---|---

References

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

ZURN User Manuals

Related Manuals