EUROfase 42724 Daulle 4 Light Black Flush Mount Instruction Manual

June 12, 2024
EUROfase

EUROfase -LOGO

EUROfase 42724 Daulle 4 Light Black Flush Mount

EUROfase -42724-Daulle-4-Light-Black-Flush-Mount-
PRODUCT

Product Information

Product Model 42724
Estimated Assembly Time 20 minutes
Tools Required For Assembly (not included) Flathead screwdriver, Phillips

screwdriver, Pliers, Electrical
Tape and Wire cutters
Helpful Tools (not included)| Wire strippers, Ladder
Electrical Specifications| 4 x 60W MAX, B10, 120V 60Hz (Bulbs not included)

Product Usage Instructions

  1. Before starting the assembly process, ensure you have the necessary tools and materials.
  2. Apply Silicone gel (not included) around the fixture body where it comes into contact with the ceiling.
  3. Identify the components labeled as follows:

A-Outlet Box screw x 2|
---|---
B-Black wire(L) from junction box|
C-White wire(N) from junction box|
D-Green wire/Bare copper (G) from the junction box|
E-Black wire (L) from a fixture|
F-White wire (N) from fixture|
G-Green wire/Bare copper from fixture|
H-Wire connector x 3|

Follow the provided instructions to properly connect and install the lighting fixture using the identified components.

Thank You
You’ve just purchased a lighting product designed and built to provide you with years of enjoyment.

INSTRUCTIONS

SAVE THESE INSTRUCTIONS FOR FUTURE REFERENCE
Follow the assembly instructions by reading the numerical order.

  • Use a qualified electrician for the installation of this lighting fixture.
  • Before installing the fixture, disconnect the power by turning off the circuit breaker or by removing the fuse at the fuse box.
  • All electrical connections must be in accordance with local and National Electrical Code or Canadian Electrical Code standards.
  • Use CSA or UL-certified wire connectors suitable for the gauge, type, and number of conductors.
  • Attach the junction box grounding wire (green or bare copper) and the bare copper wire from the fixture together. If the junction box has no ground wire, attach the bare copper fixture wire to the green ground screw on the crossbar.

Estimated Assembly Time: 20 minutes

Tools Required For Assembly (not included):

  • Flathead screwdriver,
  • Phillips screwdriver,
  • Pliers,
  • Electrical tape and
  • Wire cutters.

Helpful Tools (not included):

  • Wire strippers,
  • Ladder

4 x 60W MAX, B10, 120V 60Hz (Bulbs not included)EUROfase -42724-Daulle-4
-Light-Black-Flush-Mount-FIG-2

Note : Apply the Silicone gel (not included) around the fixture body where it comes into contact with the ceiling.

  • Outlet Box screw x 2
  • Black wire(L) from junction box
  • White wire(N) from junction box
  • Green wire/Bare copper (G) from the junction box
  • Black wire (L) from the fixture
  • White wire (N) from fixture
  • Green wire/Bare copper from the fixture
  • Wire connector x 3

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

EUROfase User Manuals

Related Manuals