PROSCEND 850G-10PWI Industrial Ethernet Switch Installation Guide
- June 12, 2024
- PROSCEND
Table of Contents
PROSCEND 850G-10PWI Industrial Ethernet Switch Installation Guide

850G-10PWI Industrial Ethernet Switch
Connecting Power
The 850G-10PWI Industrial Ethernet Switch can be powered from two power
supplies (input range 24~57 VDC). Two power supplies are on the top panel of
the switch. Insert the positive and negative wires (AWG 12-24) into V+ and V-
contacts on the terminal block respectively and use a flathead screwdriver to
push in and open the wire clamp.

WARNING
The DC power should be connected to a well-fused power supply.
Alarm Relay and Ground
- The alarm relay output contacts are shown as ALM next to the DC terminal block connector as the figure below.
- The alarm relay out is “Normal Open”, and it will be closed when it is detecting any predefined failure such as power failures.
- The relay output with current carrying capacity of 1A @ 24 VDC.
- The switch must be properly grounded for optimum system performance

Ground Connector
DIP Switch Setting
| DIP | Function Description |
|---|---|
| 1 (PWR)2 (RPS) | ON: Power alarm reporting is enabled. OFF: Power alarm |
reporting is disabled.
3 (Storm)| ON: Broadcast storm control is enabled.OFF: Broadcast storm control
is disabled.
4 (QoS)| ON: Port Priority is enabled on Port 2.OFF: Port Priority is
disabled.
5 (Port 9)6 (Port 10)| ON: Port 100FX support is enabled. OFF: Port 100FX
support is disabled.
Reset Button
LED Indicators
| Function | Operation |
|---|---|
| Reboot | Press the Reset button for 2 secondsand release. |
| Reset to factory default | Press the Reset button for 10 seconds and release. |
LED Indicators
| LED | Color | Description |
|---|---|---|
| PWR/RPS | On: Green | PWR/RPS is powered. |
| Off | PWR/RPS is not powered. | |
| ALM | On: Red | Alarm for abnormal power status or function. |
| Off | Normal operation or DIP switch OFF. | |
| RJ45 LAN port Link/Act | On: Green | Ethernet LINK UP. |
| Blinking:Green | Ethernet traffic detected. | |
| Off | Ethernet LINK DOWN. | |
| RJ45 LAN port Speed | On: Green | Ethernet LINK UP at 1000Mbps. |
| Off | Ethernet LINK DOWN or LINK UP at10Mbps/100Mbps | |
| UPLINK | On: Green | LINK UP. |
| Blinking: Green | Traffic detected. | |
| Off | LINK DOWN. | |
| PoE | On: Green | PoE PD (Powered Device) connected. |
| Off | PoE PD (Powered Device) disconnected. |

RJ45 Connector Pinouts
The pin assignment of RJ45 connector is shown in the following table.
| Pin | Description | PoE Pinouts |
|---|---|---|
| 1,2 | T/Rx+, T/Rx- | V+ |
| 3,6 | T/Rx+, T/Rx- | V- |
| 4,5 | T/Rx+, T/Rx- | X |
| 7,8 | T/Rx+, T/Rx- | X |
DIN-rail Mounting
STEP 1: Use the screws to install the DIN-rail kit to attach at the rear
side of the switch.

STEP 2: Hook the unit onto the DIN-rail.
STEP 3 : Push the bottom of the unit towards the DIN-rail until it locks
in place

Web Interface: Connect & Login
- Factory default IP: 192.0.2.1
- Login with default account and password.
Username : root
Password: 2wsx#EDC
NOTE
Please scan below QR Code to download online resources.
Download Link:
https://www.proscend.com/en/product/850G-10PWI.html
Prescind Communications Inc. All rights reserved

References
- PROSCEND is a leading global provider of mission-critical Internet of Things (IoT) connectivity products, services, and solutions with high levels of reliability and security.
- PROSCEND is a leading global provider of mission-critical Internet of Things (IoT) connectivity products, services, and solutions with high levels of reliability and security.
- Industrial 10-Port GbE Managed PoE Switch | Industrial 5G Cellular Router Manufacturer | PROSCEND
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>