GROWATT SPA 4000-10000TL3 BH-UP String Inverter User Guide
- June 12, 2024
- Growatt
Table of Contents
GROWATT SPA 4000-10000TL3 BH-UP String Inverter User Guide
Overview
- Front panel
- Double color LED
- LCD screen
- Push button
- Magnetic devices
- Heat sink
- Battery connector
- USB port
- Dry connector
- Communication ports
- AC grid connector
- Reserved hole
- Breathable valve
- Grounding screw
- EPS connector
Note:
- Only three-phase meter supports current direction detection.
- Function introduction of communication ports(11) in the follow.
Note:
- This file will be updated from time to time due to product upgrades or other reasons. Unless otherwise agreed, this document is intended as a guide only. All information and suggestions do not constitute an express or implied warranty. The final interpretation of the content is at Growatt.
- This document is for quick guidance installation only. For details, please refer to the User Manual.
- Machine damage caused by failure to follow the content is not covered by the warranty.
Installation
System Overiew
Note:
The installation of this AC coupled system needs to comprehensively consider the position of the battery and the power collector.
Installation requirements
Wall mounting
Note:
Be careful : Avoid water a n d e l e c tri c i t y p i p e s when punching
holes in the wall, otherwise it may be dangerous.
communication module installation
Connecting cables
Please prepare the cable before connecting as follows.
Number | Cable name | Type | Recommend module |
---|---|---|---|
1 | Grounding wire | Single multi-core yellow-green copper wire | Wire |
diameter>AWG10
2| AC output wire| Two or three different color multi-core copper wires| Wire
diameter>AWG12
4| Battery input wire| Red and black multi-core copper| Wire diameter>AWG10
5| Communication wire| CAT5E| /
Notice:
- Lithium battery has its own power line and communication line, so please use them directly.
- AC coupled inverter include the basic communication line. So please use them directly.
- Please make sure all the switches off before connection. For your safety, please do not operation when power on.
Grounding
**AC GRID and EPS output connection
**
DC connection
Battery input terminal installation
-
- Please make sure cable can’t put out from terminal after pressing.
-
Pull Battery cable make sure there is no loosen or shaking
-
Lock nut to ensure fastening.
-
Make sure the cable polarity is correct.
Plug in Battery terminal
Notes:
- Turn off the battery cabinet switch and disconnect the CAN communication cable before inserting. Make sure that the battery input voltage/current does not exceed the specifications.
- When installing the battery terminal, pay attention to the distinction between the positive and n e g a t i v e t e r m i n a l s a n d t h e o n e – t o – o n e correspondence between the terminals and AC coupled inverter.
- When the terminal is docked, there is a click sound. After the terminal is docked, gently pull the battery cable to observe whether the terminal is shaking or not
**Communication cables installation
**
When all the communication lines are installed, push the waterproof cover into the bottom, lock the screws fixed to the frame, and finally lock the waterproof cap
Post-installation check
Number | Acceptance Criteria | Number | Acceptance Criteria |
---|---|---|---|
1 | AC coupled inverter is installed correctly and firmly | 2 | ShineWiFi-X or |
Shinelink or GPRS is installed correctly and firmly.
3| Cable wiring is reasonable, meets the requirements, no broken skin, etc.|
4| The ground wire confirms the connection and is reliable.
5| All switches off| 6| All wires are correct and securely connected.
7| Cable tie port trimming, no sharp corners, etc.| 8| All exposed terminals
are well protected, no vacant ports.
9| Pay attention to packing all the residual materials.| |
On off AC coupled inverter
Notes:
Before power on, please make sure all of the voltage and current are in the
range of specification of AC coupled inverter.
Otherwise it will be damage to AC coupled inverter.
Follow are the steps of turn on actions:
- Turn on the switch between Grid and AC coupled inverter.
- Turn on battery and the switch between battery and AC coupled inverter.
- Turn on Battery switch.
- If need to setup AC coupled inverter. Please turn to user manual of AC coupled inverter for detail description.
- The shutdown steps are opposite to the above order.
- The AC coupled has an installation diagnosis function, please run “DiagnoseFun” after the installation is completed.
Status of AC coupled inverter
Customer can read more information by push button. Follow are the instruction of button and LED.
Mark | Description | Explanation |
---|---|---|
Push-button | Operation of display screen and set system | |
Status symbol of SPA | Green light on | SPH run normally |
Red light on | Fault state | |
Green lightblinking | Alarm state | |
Red lightblinking | Softwareupdating |
Definition of RJ45 Port Pin
No.| CAN| METER| COM| DRMS| NTC| 485-1/485-2| 485-3|
---|---|---|---|---|---|---|---|---
1| /| RS485B| DRY+| DRM1/5| GND| RS485B| RS485B
2| /| GND| /| DRM2/6| GND| GND| GND
3| /| /| DRY-| DRM3/7| GND| /| /
4| CANH| /| /| DRM4/8| GND| RS485B| /
5| CANL| RS485A| /| REF| NTC| RS485A| RS485A
6| GND| /| /| COM| NTC| /| /
7| /| /| /| /| NTC| RS485A| /
8| WAKEUP| /| /| /| /| RS485B| /
Service and contact
Shenzhen Growatt New Energy Co., Ltd
4-13/F,Building A,Sino-German(Europe) Industrial Park, Hangcheng Ave, Bao’an
District, Shenzhen, China
Tel: +86 0755 2747 1942
Email: service@ginverter.com
Web: www.ginverter.com