METRO SASE Wire Shelving Instruction Manual
- June 12, 2024
- METRO
Table of Contents
METRO SASE Wire Shelving
Product Information: Seismic Wire Shelving
These instructions are for the installation and usage of Seismic Wire Shelving. The Seismic Wire Shelving can be used with Metro Super Erecta, Super Adjustable Super Erecta, and qwikSLOT to connect the product to the floor. The sway braces are optional on Super Erecta and Super Adjustable. However, qwikSLOT sway braces are required on qwikSLOT. The seismic foot plates and sway braces in this document can be used for site-specific approvals. Anchors, however, are not included.
List of Components
The following is a list of components for the Single Unit and Back-to-Back Unit:
Item | Description | Qty. |
---|---|---|
A | End Sway Brace | 4 |
B | Back Sway Brace | 2 (4 for Single Unit with Back Sway Braces) |
C | Sway Brace Clamp | 12 |
D | 3/8 Hex Bolt | 12 |
E | 3/8 Hex Nut | 12 |
F | Post Clamp | 6 |
G | 10-24 Nut | 6 |
H | 10-24 Screw | 6 |
I | Washer | 12 |
J | Foot Plate Single Hole | 8 (4 for Single Unit) |
Product Usage Instructions: Seismic Wire Shelving
Single Unit (SES / SASE)
Two people are required to assemble the unit. The following are the instructions for usage:
- Assemble your shelving unit as described in the instruction sheet packed with the shelving.
- Sway braces are optional on Super Erecta and Super Adjustable.
- Sway brace clamp position: Spread the clamp and fit on all sway brace clamps.
- Anchor the foot plates to the floor using approved diameter expansion anchors or thru-bolts (not provided).
- Be certain to follow any site-specific or local requirements.
Back-to-Back Unit (SES / SASE)
Two people are required to assemble the unit. The following are the instructions for usage:
- Assemble your shelving unit as described in the instruction sheet packed with the shelving.
- Sway braces are optional on Super Erecta and Super Adjustable.
- Refer to page 3 for the installation of back sway braces on single unit without back sway braces.
- Refer to page 3 for the installation of end sway braces on single unit.
- Anchor the footplates to the floor using approved diameter expansion anchors or thru-bolts (not provided).
- Be certain to follow any site-specific or local requirements.
Note: Follow site-specific or local requirements when installing shelving.
INSTALLATION GUIDE FOR SEISMIC WIRE SHELVING (For installations not requiring
OSHPD pre-approval.
These seismic components may be used for site-specific approvals.)
NOTE: The seismic foot plates and sway braces in this document can be used with Metro Super Erecta, Super Adjustable Super Erecta and qwikSLOT to connect the product to the floor. Anchors are not included.
SEISMIC WIRE SHELVING — INSTRUCTIONS FOR USE
NOTE: Read the following prior to assembling your shelving unit.
- Your shelving must be assembled as per any site-specific or local requirements.
- Assemble the first shelf a maximum of 7″ from the floor.
- There must be a clearance of at least 18″ below sprinkler systems.
- Each shelving unit, whether single or back-to-back, is a “stand-alone unit” it does not connect to other shelving units or walls.
- Shelving must be assembled using designated seismic posts only.
Reference product spec sheet# 10.16.
LIST OF COMPONENTS
SINGLE UNIT | BACK-TO-BACK UNIT |
---|---|
ITEM | DESCRIPTION |
A | End Sway Brace |
Back Sway Brace | 2 |
B | Sway Brace Clamp |
C | 3/8 Hex Bolt |
D | 3/8 Hex Nut |
E | TEK Screw |
J | Foot Plate Single Hole |
G | |
H | 10-24 Screw |
I | Washer |
J | Foot Plate Single Hole |
SINGLE UNIT (SES / SASE)
Two People Required to Assemble Unit.
NOTE: Sway braces are OPTIONAL on Super Erecta and Super Adjustable.
- ASSEMBLE YOUR SHELVING UNIT AS DESCRIBED IN THE INSTRUCTION SHEET PACKED WITH THE SHELVING
- BE CERTAIN TO FOLLOW ANY SITE-SPECIFIC OR LOCAL REQUIREMENTS
- SWAY BRACE CLAMP POSITION
- SPREAD THE CLAMP AND FIT
- End Sway Brace
- ON ALL SWAY BRACE CLAMPS
- TEK Screw
- ANCHOR THE FOOT PLATES TO THE FLOOR USING APPROVED DIAMETER EXPANSION ANCHORS OR THRU-BOLTS (NOT PROVIDED).
- NOTE:
For site-specific approval the anchorage to the structure must be independently verified for each installation by the Structural Engineer of Record. The Engineer of Record must also verify that the structure itself is adequate for applied loads.
BACK-TO-BACK UNIT (SES / SASE)
Two People Required to Assemble Unit.
NOTE: Sway braces are OPTIONAL on Super Erecta and Super Adjustable.
-
ASSEMBLE YOUR SHELVING UNIT AS DESCRIBED IN THE INSTRUCTION SHEET PACKED WITH THE SHELVING
BE CERTAIN TO FOLLOW ANY SITE-SPECIFIC OR LOCAL REQUIREMENTS -
REFER TO PAGE3 FOR THE INSTALLATION OF BACK SWAY BRACES ON SINGLE UNIT
-
Single Unit without Back Sway Braces
-
REFER TO PAGE3 FOR THE INSTALLATION OF END SWAY BRACES ON A SINGLE UNIT
-
ANCHOR THE FOOT PLATES TO THE FLOOR USING APPROVED DIAMETER EXPANSION ANCHORS OR THRU-BOLTS (NOT PROVIDED).
-
THIS COMPLETES THE ASSEMBLY OF BACK-TO-BACK UNIT
-
NOTE:
For site-specific approval the anchorage to the structure must be independently verified for each installation by the Structural Engineer of Record. The Engineer of Record must also verify that the structure itself is adequate for applied loads. -
NOTE:
Follow site-specific or local requirements when installing shelving.
qwikSLOT
Assemble your qwikSLOT shelving unit as described in the instruction sheet packed with the shelving.
qwikSLOT Assembly Specific Rules:
- Locking clips must be used with the qwikSLOT shelves (9985QSL).
- Top and Bottom Shelves MUST be round collar Super Erecta style shelving.
- Follow the assembly instructions included with the qwikSLOT shelves and posts.
SINGLE UNIT (qwikSLOT)
Two People Required to Assemble Unit.
NOTE: Sway braces are REQUIRED on qwikSLOT.
-
ASSEMBLE YOUR SHELVING UNIT AS DESCRIBED IN THE INSTRUCTION SHEET PACKED WITH THE SHELVING
BE CERTAIN TO FOLLOW ANY SITE-SPECIFIC OR LOCAL REQUIREMENTS -
SWAY BRACE CLAMP POSITION
-
SPREAD THE CLAMP AND FIT
-
ANCHOR THE FOOT PLATES TO THE FLOOR USING APPROVED DIAMETER EXPANSION ANCHORS OR THRU-BOLTS (NOT PROVIDED).
-
NOTE:
For site-specific approval the anchorage to the structure must be independently verified for each installation by the Structural Engineer of Record. The Engineer of Record must also verify that the structure itself is adequate for applied loads.
BACK-TO-BACK UNIT (qwikSLOT)
Two People Required to Assemble Unit.
NOTE: Sway braces are REQUIRED on qwikSLOT.
-
ASSEMBLE YOUR SHELVING UNIT AS DESCRIBED IN THE INSTRUCTION SHEET PACKED WITH THE SHELVING
BE CERTAIN TO FOLLOW ANY SITE-SPECIFIC OR LOCAL REQUIREMENTS -
REFER TO PAGE6 FOR INSTALLATION OF END SWAY BRACES ON SINGLE UNIT
-
THIS COMPLETES THE ASSEMBLY OF BACK-TO-BACK UNIT
-
ANCHOR THE FOOT PLATES TO THE FLOOR USING APPROVED DIAMETER EXPANSION ANCHORS OR THRU-BOLTS (NOT PROVIDED).
-
NOTE:
For site-specific approval the anchorage to the structure must be independently verified for each installation by the Structural Engineer of Record. The Engineer of Record must also verify that the structure itself is adequate for applied loads. -
NOTE:
Follow site-specific or local requirements when installing shelving.
SEISMIC FOOT PLATE WITH SINGLE HOLE
* Save this document
for future application, load rating and/or safety reference.
© 2021 InterMetro Industries Corporation, Wilkes-Barre, PA 18705
L01-152 REV C 07/21
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>