POWER-LITE EXITBOX-R-B LED Exit Sign Instruction Manual
- October 30, 2023
- POWER-LITE
Table of Contents
POWER-LITE EXITBOX-R-B LED Exit Sign
Wall Mount
-
Release the clip to UNLOCK status by a screwdriver. Slide the cover away from the housing.
-
Connect the battery with quick connector.
-
Knock out the holes for screwing and AC wiring Connect wiring to terminals. Mount the cover onto the wall.
-
Slide the housing into the cover.
-
Fasten the clip to LOCK status. Switch on.
Recessed Mount (EXITBOX -RK-B Sold Separately)
-
Cut out size: L420mm x W80mm.
-
Unscrew the side cover from fixture.
-
Knock out the side hole, put the panel through the recessed kit, and the recessed kit will be fixed onto the fixture. Plug the recessed kit’s indicator and test button PCBA onto the main PCBA. Screw the side cover back.
-
Press the springs upwards into the ceiling.
-
Finish installation. Switch on.
Instructions for automatic test option
Instruction for Automatic test function
Once the unit is powered up, a self-diagnostics test will be automatically initiated:
- Check battery, lamp, charge board and transfer fault all the time.
- Run 2H duration test every half a year.
Note: All test functions are preset and no need field adjustment.
Dual Colour LED Status Indicator Meaning
- Green indicator solid on: Ready/ Normal Operation
- Red indicator flashes: Require service
•
| One flash, 4s pause| Battery disconnected
---|---|---
••
| Two flashes, 4s pause| Low battery voltage
•••
| Three flashes, 4s pause| Charge board fault
••••
| Four flashes, 4s pause| AC/DC transfer fault
•••••
| Five flashes, 4s pause| LED lamp fault
Note: When the fault is recovered, press the test button for 2s, the red flashing indicator will turn green. The fault is cleared, and the unit is back to normal.
Button Test
Press test button once | run a 30s duration test |
---|---|
Press test button twice within 2s | run a 3mins duration test |
Press test button 3 times within 2s | run a 30mins duration test |
Press test button 4 times within 2s | run a 2H duration test |
Precautions
Normal Operation: The green LED indicator stays on when connected to
mains supply. The indicator will turn off when the mains supply fails, or when
the internal charger malfunctions, or when the luminaire is in test mode.
Battery: LiFePO4 rechargeable battery pack. Battery should be replaced
when it reaches the end of its lifetime. To avoid damage to the luminaire and
ensure its performance, the battery should be replaced with same type.
Test Switch: Press the test button, LED indicator will turn off and the
luminaire will be powered by the battery pack. The light source is non-
replaceable. When the light source reaches the end of its lifetime, the whole
luminaire shall be replaced.
Installation Procedure
WARNING
- Switch off before installation or maintenance.
- Switch on only after complete installation and examination of the circuit.
- Professional electrician for installation and maintenance only.
- This luminaire is not intended for use in high-risk task area lighting.
Read instructions and check you have all the tools and accessories to complete the installation correctly.\
Ceiling Mount
-
Release the clip to UNLOCK status by a screwdriver. Slide the cover away from the housing.
-
Connect the battery with quick connector.
-
Connect wiring to terminals. Mount the cover onto the ceiling
-
Slide the housing into the cover.
-
Fasten the clip to LOCK status. Switch on.
Customer Support
Free Call: 1800 909 306
Website: nedlandsgroup.com.au
Email: sales@nedlandsgroup.com.au
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>