NCF 315547 Pisces Queen Platform Bed Instruction Manual
- October 30, 2023
- NCF
Table of Contents
315547 Pisces Queen Platform Bed
Instruction Manual
ASSEMBLY INSTRUCTIONS
Thank you for purchasing this quality product. Be sure to check all packing materials carefully for small parts, which may have come loose inside the carton during shipment. Identify and count all items and compare with the parts list and/or hardware list shown.
PARTS LIST
No | ITEM | Qty |
---|---|---|
A | Headboard | |
B | Footboard | |
c | Headboard Leg LSF | |
D | Headboard Leg RSF | |
E | Bed Roll-Out Slats | |
F | Bed Slats Support | |
G | Side Rail Left | |
H | Side Rail Right | |
I | Center Slat | |
J | Side Rail Leg |
HARDWARE LIST
No | ITEM | Qty |
---|---|---|
1 |
JCBC M6 x 30mm
| 12pcs
2|
JCBC M6 x 50mm
| 4 pcs
3|
Flat Washer 1/4″ID x 19mmOD Blk
| 12 pcs
4|
ALLEN KEY m4x65mm Blk (FOR HB LEG)
| 1 pc
5|
ALLEN KEY m5x65mm Blk (FOR SIDE RAIL)
| 1 pc
6|
Flat Head Chipboard Screw m4x32mm Row
| 32 pcs
STEP 1.1 : Attach Head Board Leg ( C,D ) to Head Board ( A ) as shown using
JCBC BOLT( 1 ) with Flat washer (3)and securing with ALLEN KEY ( 4 ) .
STEP 1.2 : Fix the other holes with Cask Screw (6) as shown.
NOTE : MUST TIGHTEN SCREWS PERIODCALLY WITH USE SCREW WILL BECOME LOOSE CHECK TIGHTNESS OF ALL SCREW EVERY 6-8 WEEKS.
STEP 2.1 : Attach Side Rail ( G ) & ( H ) to the Side Rail Leg ( J ) as shown
using JCBC BOLT( 1 )with Flat washer (3)and securing with ALLEN KEY ( 4 ) by
outside side rail (G) & (H) .
STEP 2.2 : Loosen JCBB Bolt at Headboard & Footboard Leg using Allen Key (5)
(Do not tighten them before Hook SET-UPSIDE RAIL TO HEAD BOARD (A) closely and
push down to fit and tighten them accordingly.
Repeat step 2.2 with other end of rail to hook onto FOOTBOARD (B).
STEP 3 : Fix the Bed Slat Support (F ), to Bed Slat (E) and Center slats (I)
tighten with JCBC Bolt (2) as shown . Install the bed slat ( E ) to side rail
( G ) & ( H ) and tighten with Cask Screw ( 6 ) as per diagram shown. (NOTE:
THE SETUP MUST DONE AT THE DECIDED LOCATION FOR THE BED TO OBTAIN PERFECT
STABILITY)
Repeat step 3 for other set of slats assembly.
Push the side rail(G)&(H) meet with wooden slat(E) and fix the CSK Screw(6) by
using the Screw Driver.
NOTE : MUST TIGHTEN SCREWS PERIODCALLY WITH USE SCREW WILL BECOME LOOSE CHECK TIGHTNESS OF ALL SCREW EVERY 6-8 WEEKS.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>