Fronius TS 5kA-3 Smart Meter User Guide

October 30, 2023
Fronius

Fronius-LOGO

Fronius TS 5kA-3 Smart Meter

Product Information

The Fronius Smart Meter TS 5kA-3 is an energy meter that measures the energy consumption of a single-phase or three-phase system. It has a maximum current of kVT x kCT and measures the active and reactive energy accurately in compliance with EN IEC 62053-21 and EN IEC 62053-23 standards. The meter has an RS485 communication output that is electrically isolated from the input and auxiliary voltage, and it supports Modbus RTU protocol with 1-255 standard addresses and baud rates of 9600, 19200, and 38400 bit/s. The housing of the meter is made of Noryl, which is self-extinguishing and has a degree of protection of IP54.

Product Usage Instructions

  1. Switch off the circuit breaker before installing the Fronius Smart Meter.
  2. Mount the smart meter on a 35 mm DIN rail.
  3. Connect the auxiliary power supply to the meter.
  4. Choose one of the following options based on your system configuration:
  5. For a single-phase, 2-wire system with CT, connect the wires to the screw terminals labeled L1 and L2.
  6. For a single-phase, 2-wire system with VT/CT, connect the wires to the screw terminals labeled L1 and L2 for CT and L3 for VT.
  7. For a two-phase, 3-wire system with CT, connect the wires to the screw terminals labeled L1, L2, and L3.
  8. For a two-phase, 3-wire system with VT/CT, connect the wires to the screw terminals labeled L1, L2, and L3 for CT and L4 for VT.
  9. For a three-phase, 3-wire system with CT, connect the wires to the screw terminals labeled L1, L2, L3, and N.
  10. For a three-phase, 3-wire system with VT/CT, connect the wires to the screw terminals labeled L1, L2, L3, N for CT and L4, L5, L6 for VT.
  11. For a three-phase, 4-wire system with ARON CT, connect the wires to the screw terminals labeled L1, L2, L3, N for CT and ARON for the ARON CT.
  12. For a three-phase, 4-wire system with CT, connect the wires to the screw terminals labeled L1, L2, L3, N for CT and L4, L5, L6 for VT.
  13. For a three-phase, 4-wire system with VT/CT, connect the wires to the screw terminals labeled L1, L2, L3, N for CT and L4, L5, L6 for VT.
  14. Connect the data cables to the RS485 communication output of the meter.
  15. Configure the meter’s settings according to your system requirements.
  16. Set up a password to secure access to the meter’s configuration.

FIND MORE INFORMATIONmanuals.fronius.com/html/4204260348

QUICK START GUIDE

Fronius Smart Meter TS 5kA-3

WARNING! Incorrect operation and incorrectly performed work can cause serious personal injury or material damage. The Fronius Smart Meter may only be installed and commissioned by trained personnel and only within the scope of the technical regulations. Before working with the device, read and understand all enclosed, printed and online documents! This document does not describe all of the possible system configurations

SPECIFICATION

Fronius-TS 5kA-3-Smart-Meter-FIG-2Fronius-
TS 5kA-3-Smart-Meter-FIG-3Fronius-TS 5kA-3-Smart-Meter-
FIG-4

Detailed, country-specific warranty terms are available on: www.fronius.com/solar/warranty

INSTRUCTIONS

Fronius-TS 5kA-3-Smart-Meter-FIG-5Fronius-TS
5kA-3-Smart-Meter-FIG-6Fronius-TS 5kA-3-Smart-Meter-
FIG-7Fronius-TS 5kA-3-Smart-Meter-FIG-8Fronius-TS
5kA-3-Smart-Meter-FIG-9Fronius-TS 5kA-3-Smart-Meter-
FIG-10Fronius-TS 5kA-3-Smart-Meter-
FIG-11Fronius-TS 5kA-3-Smart-Meter-
FIG-12Fronius-TS 5kA-3-Smart-Meter-
FIG-13

References

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Fronius User Manuals

Related Manuals