Edge-corE AS7946-74XKSB Ethernet Switch User Guide
- June 10, 2024
- Edge-core
Table of Contents
- Edge-corE AS7946-74XKSB Ethernet Switch
- Package Contents
- Overview
- Front LEDs
- FRU Replacement
- Air Filter Replacement
- Mount the Device
- Ground the Device
- Connect Power
- Connect Timing Ports
- Make Network Connections
- Make Management Connections
- Hardware Specifications
- References
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
Edge-corE AS7946-74XKSB Ethernet Switch
Package Contents
- AS7946: 74XKSB
- Rack mounting kit: 2 rack-rail assemblies and 20 screws
- Console cable: RJ-45 to D-Sub
- Documentation: Quick Start Guide (this document) and Safety and Regulatory Information
Overview
- 2 x 100G QSFP-DD
- 8 x 40G/100G QSFP28
- 64 x 10G/25G SFP28
- Timing ports: 3 x RJ-45 BITS ports,1 x RJ-45 1PPS/ToD port, 1 x 1PPS connector, 1 x 10MHz connector
- USB port
- RJ-45 Management port
- Air filters
- Reset button
- Console ports: 1 x Micro-USB, 1 x RJ-45
- Product tag
- DC terminal or AC power socket
- Grounding point
- 5 x fans
Front LEDs
- QSFP-DD Port LEDs:
- LED1 (top) — Blue (100G)
- LED2 (bottom) — Blue (all lanes linked), Off (not all lanes linked), Blinking (activity)
- QSFP28 Port LEDs:
- LED1 (left) — Blue (100G), Green (40G)
- LED2 (right) — Blue (link), Off (not all lanes linked), Blinking (activity)
- SFP28 Port LEDs:
- LED1 (left) — Blue (25G), Green (10G)
- LED2 (right) — Blue (link), Blinking (activity)
- System LEDs:
- DIAG — Green (OK), Amber (fault detected)
- LOC — Flashes Amber when the command is activated
- FAN — Green (OK), Amber (fault)
- PS0 and PS1 — Green (OK), Amber (fault)
- Management Port LEDs:
- RJ-45 OOB Port — Left (link), Right (activity)
FRU Replacement
PSU Replacement
- Remove the power cord.
- Press the release latch and remove the PSU.
- Install replacement PSU with matching airflow direction.
Fan Tray Replacement
- Press the release latch in the fan tray handle.
- Pull out to remove the fan.
- Install replacement fan with matching airflow direction.
Air Filter Replacement
- Unscrew the filter cover captive screws.
- Remove the old filter and install a replacement filter.
- Replace the filter cover and tighten the captive screws.
Warning: For a safe and reliable installation, use only the accessories
and screws provided with the device. Use of other accessories and screws could
result in damage to the unit. Any damages incurred by using unapproved
accessories are not covered by the warranty.
Note: The drawings in this document are for illustration only and may not
match your particular model.
Mount the Device
- Separate the rack-rail assembly into two sections.
- Use the included ten screws to attach the bracket to each side of the device.
- Slide the device into the rack.
- Hold it in place and secure the rack-assembly to the front post using four screws.
- While holding the device in place, slide the inner section of rack-rail assembly from the back until it fits the rear post.
- Secure the rack-rail assembly to the rear using four screws.
Ground the Device
Verify Rack Ground
Ensure the rack on which the device is to be mounted is properly grounded and
in compliance with ETSI ETS 300 253. Verify that there is a good electrical
connection to the grounding point on the rack (no paint or isolating surface
treatment).
Attach Grounding Wire
Attach a lug (not provided) to a #8 AWG minimum grounding wire (not provided),
and connect it to the grounding point on the device rear panel. Then connect
the other end of the wire to rack ground.
Caution
- The chassis ground connection must not be removed unless all supply connections have been disconnected.
- The device must be installed in a restricted-access location. It should have a separate protective ground terminal on the chassis that must be permanently connected to a well grounded chassis or frame to adequately ground the device chassis and protect the operator from electrical hazards.
Connect Power
DC Power
Install two DC PSUs and then connect them to a DC power source.
Caution:
- Use a IEC/UL/EN 60950-1 and/or 62368-1 certified power supply to connect to a DC converter.
- All DC power connections should be performed by a qualified professional.
Note: Use # 8 AWG/ 6 mm2 copper wire (for a -40 to -75 VDC PSU) to connect to a DC PSU.
- Use the ring lugs included with the DC PSU.
- DC return
- -40 -75 VDC
- Use a 8 AWG green/yellow ground wire to ground the DC PSU.
AC Power
Install two AC PSUs and then connect them to an AC power source.
Connect Timing Ports
-
RJ-45 BITS
Use a Cat. 5e or better twisted-pair cable to synchronize the device. -
RJ-45 1PPS/ToD
Use a Cat. 5e or better twisted-pair cable to connect the 1-pulse-persecond (1PPS) and Time of Day to other synchronized devices. -
10MHz IN/1PPS OUT
Use coax cables to connect the 10MHz IN and 1-pulse-per-second (1PPS) OUT ports to other synchronized devices.
Make Network Connections
100G QSFP-DD Ports
Install transceivers and then connect fiber optic cabling to the transceiver
ports. The following transceivers are supported in the QSFP-DD ports:
- Power class 8 up to 16.5W
100G QSFP28 Ports
Install transceivers and then connect fiber optic cabling to the transceiver
ports. The following transceivers are supported in the QSFP28 ports:
- 100GBASE-SR4, LR4, CWDM4, DR1
- 40GBASE-SR4, LR4
Alternatively, connect DAC cables directly to the QSFP28 slots.
SFP28 Ports
Install transceivers and then connect fiber optic cabling to the transceiver
ports. The following transceivers are supported in the SFP28 ports:
- 25GBASE-SR, LR
- 10GBASE-SR, LR, ER, ZR
Alternatively, connect DAC/AOC cables directly to the SFP28 ports.
Make Management Connections
MGMT RJ-45 Port
Connect Cat. 5e or better twisted-pair cable.
RJ-45 Console Port
Connect the included console cable and then configure the serial connection:
115200 bps, 8 characters, no parity, one stop bit, 8 data bits, and no flow
control.
Micro-USB Console Port
Connect using a standard USB to Micro-USB cable.
Hardware Specifications
Interfaces
Management
- 1 x RJ-45 Console port
- 1 x RJ-45 10/100/1000BASE-T Management port
- 1 x USB2.0 Port
- 1 x Micro USB Console port
Network
- 64 x 10G/25G SFP28
- 8 x 40G/100G QSFP28
- 2 x 100G QSFP-DD
Chassis
- Size (WxDxH): 440 x 480 x 87 mm (17.3 x 18.9 x 3.4 in)
- Weight: 15.3 kg (33.73 lb)
- Operating Temperature: 0° C to 45° C (32° F to 113° F)
- Storage Temperature: -40° C to 70° C (-40° F to 158° F)
- Humidity:
- Operating: 5% to 85% (non-condensing)
- Storage: 5% to 95% (non-condensing)
- Power: 527 W at 25° C (77° F)
- Consumption: 723 W at 45° C (113° F)
48 VDC PSU
- DC Input: -40 -75 VDC, 40 A max
AC PSU
- AC Input: 100-120 VAC, 50-60 Hz, 12 A Max. 200-240 VAC, 50-60 Hz, 7.5 A Max.
Regulatory Compliances
Emissions
- EN 55032:2015+A1:2020
- EN 61000-3-2:2019+A1:2021
- EN 61000-3-3:2013+A1:2019
- FCC Part 15 subpart B Class A CCC GB/T 9254.1-2021 Class A BSMI VCCI
Immunity
EN 55024:2010+A1:2015 EN 55035:2017+A11:2020 IEC 61000-4-2/3/4/5/6/8/11
Safety : UL/CUL (CAN/CSA 22.2 No 62368-1 & UL 62368-1) CB (IEC/EN 60950-1 & IEC/EN 62368-1) CCC (GB4943.1-2011) BSMI VCCI
Taiwan RoHS CNS 15663
Warranty Information and Technical Support
Registering your product enables you to receive a more efficient warranty
service. Be sure to register at www.edge-core.com.
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>