GOODWE LX F6.6-H Rechargeable Lithium Ion Battery System Installation Guide
- June 11, 2024
- GOODWE
Table of Contents
- Safety Precaution
- Product Introduction
- Battery System Installation
- Deliverables (PCU)
- Deliverables (Battery Module)
- Space Requirements
- Angle Requirements
- Battery Quantity Requirements
- Installation Requirement For Locking Bracket
- Battery System Installation(Without adjustable leveling feet)
- Battery System Installation(With adjustable leveling feet)
- Installation of PCU
- Electrical Connection
- Power ON and OFF
- Commissioning
- Customer Support
- References
- Read User Manual Online (PDF format)
- Download This Manual (PDF format)
GOODWE LX F6.6-H Rechargeable Lithium Ion Battery System
Safety Precaution
General Disclaimer
- The information in this user manual is subject to change due to product updates or other reasons. This guide cannot replace the product labels or the safety precautions in the user manual unless otherwise specified. All descriptions in the manual are for guidance only.
- Before installations, read through the quick installation guide. For additional information, please see the user manual.
- All installations should be performed by trained and knowledgeable technicians who are familiar with local standards and safety regulations.
- Check the deliverables for correct model, complete contents, and intact appearance. Contact after sales service if any damage is found or any component is missing.
- Use insulating tools and wear personal protective equipment (PPE) when operating the equipment to ensure personal safety. Wear anti-static gloves, cloths, and wrist strips when touching electron devices to protect the equipment from damage.
- Strictly follow the installation, operation, and configuration instructions in this guide and relative user manual. The manufacturer shall not be liable for equipment damage or personal injury if you do not follow the instructions. For more warranty details, please visit: https://en.goodwe.com/warranty.
Safety Disclaimer
Instructions during Installation
- The battery system is a high voltage system. High voltage exists when the equipment is running. Please keep Power Off before any operations to avoid danger. Strictly follow all safety precautions outlined in this manual and safety labels on the equipment during the operation.
- The inverter used with the battery shall be approved by the battery manufacturer. The approved list of batteries and the matched inverter can be obtained through the official website.
- Do not disassemble, modify, or replace any part of the battery or the power control unit without official authorization from the manufacturer. Otherwise, it will cause electrical shock or damages to the equipment, which shall not be borne by the manufacturer.
- Do not hit, pull, drag, squeeze or step on the equipment or put the battery into fire. Otherwise, the battery will be exploded.
- Do not place the battery in a high temperature environment. Make sure that there is no heat source near the battery and no direct sunlight. When the ambient temperature exceeds 60 ℃, it will cause a fire.
- Do not use the battery or the power control unit if it is defective, broken, or damaged. The damaged battery may leak electrolyte.
- To protect the battery pack and its components from damage during transportation, please ensure that the transportation personnel are professionally trained. All operations during the transportation have to be recorded. The equipment shall be kept in balance, thus avoiding falling down.
- The battery equipment is heavy. Please equip the corresponding personnel according to its weight, so that the equipment does not exceed the weight range of the human body can carry, and smash the personnel.
- Contact after-sale service immediately if the battery is not able to be started. Otherwise, the battery might be damaged permanently.
- Do not move the battery system if it is connected with external battery modules. Contact after-sale service if the battery shall be replaced or added.
Emergency Measures
Battery Electrolyte Leakage
If the battery module leaks electrolyte, avoid contact with the leaking liquid or gas. The electrolyte is corrosive. It will cause skin irritation or chemical burn to the operator. Anyone contacts the leaked substance accidentally has to do as following:
- Breath in the leaked substance : Evacuate from the polluted area, and seek immediate medical assistance.
- Eye contact : Rinse your eyes for at least 15 minutes with clean water and seek immediate medical assistance.
- Skin contact : Thoroughly wash the touch area with soap and clean water, and seek immediate medical assistance.
- Ingestion : Induce vomiting, and seek immediate medical assistance.
Fire
- The battery may explode when the ambient temperature exceeds 150℃. Poisonous and hazardous gas may be released if the battery is on fire.
- In the event of a fire, please make sure that the carbon dioxide extinguisher or Novac1230 or FM-200 is nearby.
- The fire cannot be put out by water or ABC dry powder extinguisher. Firefighters are required to wear full protective clothing and self-contained breathing apparatus.
Label Description
| Potential risks exist. Wear proper PPE before any operations.| | Keep the equipment away from
open flame or ignition source.
---|---|---|---
| HIGH VOLTAGE HAZARD.
High voltage exists during the equipment’s running. Ensure the equipment is
powered off before any operations.| | Keep the equipment away from children.
| Operate the equipment properly to avoid explosion danger.| | No
extinguishing with water.
| The equipment contains corrosive electrolytes. In case of a leak in the
equipment, avoid contact the leaked liquid or gas.| | Do not dispose of the
equipment with household garbage at its end of life. Dispose of it according
to local laws and regulations. or send it to the manufacturer.
| Batteries contain flammable materials, beware of fire.| | Recycle
regeneration mark.
| Read
through the user manual before any operations.| | CE Marking
| Pay
attention to wearing PPE during installation, operation and maintaining of the
equipment.| |
Grounding point.
Check Before Power ON
No. | Check Item |
---|---|
1 | The battery is firmly installed in a clean place where is well-ventilated |
and easy to operate.
2| The PE cable, power cable, communication cable, and the terminal resistors
are connected correctly and securely.
3| Cable ties are intact, routed properly and evenly.
4| Unused ports and terminals are sealed.
EU Declaration of Conformity
GoodWe Technologies Co., Ltd. hereby declares that the equipment without wireless communication modules sold in the European market meets the requirements of the following directives:
- Electromagnetic compatibility Directive 2014/30/EU (EMC)
- Electrical Apparatus Low Voltage Directive 2014/35/EU (LVD)
- Battery Directive 2006/66/EC and Amending Directive 2013/56/EU
- Waste Electrical and Electronic Equipment 2012/19/EU
- Registration, Evaluation, Authorization and Restriction of Chemicals (EC) No 1907/2006 (REACH)
You can download the EU Declaration of Conformity on the official website: https://en.goodwe.com.
Product Introduction
Parts Introduction (PCU)
- DC Terminal (BAT)
- Ventilation Valve
- Communication Terminal (COM)™
- Grounding Point
- Circuit Breaker
- SOC Indicator
- Button Indicator
- Rectangular Connector
Parts Introduction (Battery) Parts Introduction (Battery Base)
- Ventilation Valve
- Rectangular Connector
- Grounding Point
- Adjustable Leveling Feet (Optional)
Dimensions
-
Lynx home F series
-
Lynx home F Plus+ series
Battery System Installation
Deliverables (PCU)
Deliverables (Battery Module)
Space Requirements
Angle Requirements
Battery Quantity Requirements
Installation Requirement For Locking Bracket
Battery System Installation(Without adjustable leveling feet)
Battery System Installation(With adjustable leveling feet)
Installation of PCU
Electrical Connection
Wiring Diagram for battery systems
Single battery system
For Lynx home F series and Lynx home F Plus+ series.
Parallized battery systems
Only for Lynx home F Plus+ series.
Connecting the PE cable
Connecting the Power Cable(Type1)
Cross-sectional area of the power cable S: 14mm2≤S≤16mm2
For Lynx home F series and Lynx home F Plus+ series.
Cross-sectional area of the power cable S: 4mm2≤S≤6mm2
For Lynx home F series and Lynx home F Plus+ series.
Connecting the Power Cable(Type2)
Only for Lynx home F Plus+ series.
Connecting the Communication Cable
Lynx home F series
RJ45 Connector
Lynx home F Plus+ series
RJ45 Connector
PIN | COM1 | COM2 | COM3 | Description |
---|---|---|---|---|
1 | CAN_3H | CAN_3H | CAN_3H | BMS communication for battery system parallel |
connection
2| CAN_3L| CAN_3L| CAN_3L
3| N/A| N/A| N/A| Reserved
4| CAN_2H| N/A| N/A| COM1: connects to the inverter BMS communication port to
communication with the inverter
COM2, COM3: reserved
5| CAN_2L| N/A| N/A
6| GND| GND| GND| PIN for grounding.
7| HVIL_IN| HVIL_IN| N/A| COM1, COM2: interlock function COM3: reserved
8| HVIL_OUT| HVIL_OUT| N/A
Installing the terminal resistor
Lynx home F series
Lynx home F Plus+ series
Single battery system
Parallized battery systems
For Battery 1
For Battery N
Installing the protection cover
Power ON and OFF
NOTICE
The DC breaker between the inverter and the battery (DC Breaker 2), and
between the two batteries (DC Breaker 5), shall be installed in accordance
with local laws and regulations.
Single battery system
Parallized battery systems
Commissioning
Commissioning via SolarGo APP
Monitoring via SEMS Portal APP
For more information, please scan the following QR for User Manual.
Customer Support
No. 90 Zijin Rd., New District, Suzhou, 215011, China
www.goodwe.com
service@goodwe.com
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>