SDHQ-10-1141-AC-A Switch Pros Power Module Mount Instruction Manual

June 10, 2024
SDHQ

SDHQ-10-1141-AC-A Switch Pros Power Module Mount Instruction Manual
SDHQ-10-1141-AC-A Switch Pros Power Module Mount

INSTALLATION INSTRUCTIONS

Product: SDHQ-10-1141-AC
Description: 2015-current Ford F150/Raptor and 2017- current Ford F250+ Switch Pros Power Module Mount

OVERVIEW

Parts List Hardware List Required Tools
(1) SDHQ Power Module Mount (2) ¼” – 20 x ¾” S.S. Hex Head Bolt

7/16” Socket and Wrench
SDHQ -10-1141-AC-A| (3) ¼” S.S. Washer| 10mm Deep Socket
(1) SDHQ Power Module Mount Bracket| (1) ¼” x 1” S.S. Fender Washer| 15mm Socket or Wrench
SDHQ -10-1141-AC-B| (2) ¼” – 20 S.S. Nylock nut| Ratchet
(1) Hardware Package| (2) #8 S.S. SAE Washers| Wire Strippers
SDHQ -10-1141-AC-C| | 1/8” Hex Bit
| | Panel clip removal tool
Tech Notes
Use anti-seize on stainless steel hardware.Adjust the battery as necessary for optimal fitment.Make sure terminal crimps are tight to avoid damage and fire hazard.Fits: 2015+ Ford F150, 2017+ Ford Raptor, 2017+ Ford F250/350/450/550 Approx. install time = 1 – 1 ½ Hours (not including wiring)

INSTRUCTION

Installation Instructions:

  1. Unbox and verify all parts are accounted for. Familiarize yourself with the parts and the diagram above.

  2. Preparing your vehicle. Plastic cover removal. Proceed to Step 6 if you do not have the plastic cover shown below. If you have the plastic cover shown below, you will need to remove it to access one of the mounting studs. Begin by removing the (x2) panel clips and harness connected to the top of the plastic cover. Remove the 15mm nut circled below.
    Installation Instructions
    Installation Instructions

  3. If applicable, the fuse boxes clipped to the side of the battery box will need to be moved to allow enough space for removal of the plastic cover. Disconnect the 10mm nut securing the power wire from the fuse box. The cover for this fuse box will need to be opened to access a clip near the battery, circled right. Push in this clip and pull up to disconnect it from the battery box. Repeat this for the (2) clips securing the fuse box closer to the fire wall, arrowed at right.
    Installation Instructions

  4. Remove the (3) PCM connections. The grey handles are tabbed in place, push in the tab and rotate the handle. Below the PCM connectors are white and black electrical connections, arrowed at below. It may be easier to disconnect these. Remove the plastic panel those are connected to from the plastic cover by pressing the tab down, arrowed at right in blue.
    Installation Instructions

  5. You are ready to remove the plastic cover now. There are (6) clips securing  the plastic cover to the fire wall, (2) on top and bottom, (1) on both sides. Start on the passenger side and work your way towards the engine. Once unclipped, the fuse boxes and connectors will need to be adjusted such the plastic cover can be removed. Re-install all connections and fuse boxes.
    Installation Instructions

  6. Use a 15mm socket or wrench to remove the nut circled in red below, leave the ground cable on the stud (reinstall if moved for plastic cover removal). Use a 10mm deep socket and ratchet to loosen the PCM nut circled in blue. This nut doesn’t need to be completely removed.
    Installation Instructions

  7. Slide the SDHQ Power Module Mount Bracket behind the PCM nut loosened in Step 6. Tighten this nut until the bracket doesn’t fall. This will be tightened in a later step.
    Installation Instructions

  8. Installing the Power Module to the SDHQ Mount. Align the Switch Pros Power Module to the SDHQ Mount. Insert the Switch Pros Supplied bolts through the Power Module and Mount. Secure using the #8 S.S. SAE Washers supplied in this kit and the Switch Pros supplied nut. Use the diagrams shown below to align the Switch Pros Power Module.
    Installation Instructions

  9. Installing the SDHQ Power Module Mount. Install the SDHQ Power Module Mount as pictured below; note the SDHQ Mount under the body panel, shown circled in red. Follow the diagram on Page 4 to secure the mount to the truck. Keep all hardware loose.
    Installation Instructions

  10. Thread and tighten the 15mm nut onto the stud it was removed from in Step 2 or Step 6. Tighten the 10mm PCM nut. Tighten the ¼” hardware with the fender washer, then the other ¼” hardware.
    Installation Instructions

  11. The install on your SDHQ Power Module Mount is complete! Now onto wiring. Enjoy!

Wiring:
Once the Switch-Pros power module is mounted, but BEFORE it is connected to anything else, do the following:

  1. Reinstall battery (if battery was removed during installation), and secure factory connections. Start vehicle and confirm that battery is properly installed, connected and grounded.
  2. Connect the Switch-Pros Ground wire lug to the negative terminal on the battery (grounding elsewhere will not properly filter noise and will void your product warranty).
  3. Plug the 16-pin harness into the power module; be sure it locks in.
  4. Connect the red Battery Cable to the positive terminal on the battery. Tighten down both ends, to prevent lug from rotating and possibly causing friction or spark.

Double check all hardware is installed correctly and tight
Re-torque ALL bolts after 100 miles

190 S McQueen Rd
Ste 109 Gilbert, AZ 85233
Phone: 480-633-2929 | Fax: 480-633-1791
www.sdhqoffroad.com

Follow us on:

 Facebook
 Instagram

For questions or help with the installation, please call SDHQ Offroad @ 480-633 2929 Mon.–Fri. 8:00am–5:30pm and Sat. 8:00am–3:30pm Arizona Time. www.sdhqoffroad.com Page 8 of 8

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

SDHQ User Manuals

Related Manuals