nJoy PWUP-BP16PBA-AZ01B Balder Battery Pack 2U User Manual

June 9, 2024
NJOY

nJoy PWUP-BP16PBA-AZ01B Balder Battery Pack 2U

nJoy PWUP-BP16PBA-AZ01B Balder Battery Pack 2U

Thank you for purchasing our products!

Please read this manual before using the product.

| Focusing on quality at competitive prices, nJoy designs consumer products for a better and enjoyable way into the digital world.
---|---

The battery pack is a product that works only with an UPS. The battery pack will provide or extend the backup time of your UPS.

Package Contents

✓ Battery pack unit
✓ User manual
✓ Battery connection cable
✓ Warranty card

NOTE: If any of the above package content is missing or is damaged please contact the shop from where you have bought this product

Product Overview

Front View

Product Overview

Back View

Product Overview

  1. DC connector: connects to either UPS or 2nd battery pack
  2. DC breaker
    • Battery over-current protection breaker
    • Easy swap battery: When switching battery, put the position of the breaker in “O” position. In case there is a second (or further) battery pack connected to the battery bank, the DC voltage from the UPS will flow through without any interruption to the following battery bank(s)

Important Safety Warnings

Please read carefully the following instructions before installing the unit. Do not operate this unit before reading through all safety information and operating instructions carefully!

Preparation

This battery bank is connected to an UPS. There will be voltage at the output terminals if the UPS is turned on even if the input AC Mains is not available.
Make sure that the AC Utility outlet is correctly grounded.
Do not try to repair the unit yourself, contact your local supplier or your warranty will be void.

Installation and connection warnings

Use a certified input power cable with the correct plugs and sockets.
To eliminate any overheating of the battery bank, keep all ventilation openings free from obstruction and do not place any foreign objects on top of the battery bank. Keep the battery bank 20 cm away from the wall.
Make sure the battery bank is installed within the proper environment as specified: 0-40°C and 30- 90% non-condensing humidity

Cautions regarding battery installation

Do not install the battery bank under direct sunlight. Your warranty will be void if the batteries fail due to overheating.
This battery bank is designed for indoor use only.
This battery bank is not designed for use in dusty, corrosive and salty environment.

Storage and maintanance

The warranty for this battery bank will be void if water or other liquid is spilt or poured directly onto the battery bank. Similarly, warranty is void if any damage to the battery bank occurs due to foreign objects which are deliberately or accidentally inserted into the battery bank enclosure.
The battery will discharge naturally if the system is unused for a period of time. It should be recharged every 2-3 months if unused. If this is not done, then the warranty will be void. During normal operation, the batteries will be automatically charged.
Servicing of batteries should be performed or supervised by trained personnel only. When replacing batteries, replace with the same quantity, type & capacity.
The unit contains no user-serviceable parts. If the battery service life has been exceeded, the batteries must be replaced. In this case, please contact your dealer.

Other cautions

Do not dispose of batteries in an open fire, they may explode.
Do not open or otherwise damage the batteries. The electrolyte from the batteries is toxic and harmful to the skin and eyes. Risk of electric shock! The battery circuit is not isolated from AC, hazardous voltage may exist between battery terminals and ground. Test before touching with bare hands.
A battery can present a risk of electrical shock and high short circuit current.

Installation

NOTE: Before installation, please inspect the unit. Be sure that nothing inside the package is damaged. Please keep the original package in a safe place for future use

Properly install the battery pack into the rack using screws

Rack – mount instalation

Installation

Installation

Connection of the battery pack

Follow the below installation chart in order to connect with UPS and other battery pack (if applicable) with included cable.

Installation

Battery Installation

If your battery pack is not installed with batteries, please follow the proper procedure to put the batteries inside the unit.

NOTE: Make sure that the battery pack is disconnected from the ups before performing the following sequence of operations!

The following precaution should be observed when working on batteries:

  1. Remove watches, rings, or other metal objects.
  2. Use tools with insulated handles.
  3. Wear rubber gloves and boots.
  4. Do not lay tools or metal parts on top of batteries as you might produce a short.
  5. Disconnect charging source prior to connecting or disconnecting battery terminals.
  6. Do not plug or unplug the battery connector if UPS works in DC (discharging) mode.

Install batteries into the pack connecting them serially using the wires inside the unit, as shown on the following diagram:

Installation

Disposal of Old Electrical & Electronic Equipment 

(Applicable in the European Union and other European countries with separate collection systems)

This symbol on the product or on its packaging indicates that this product shall not be treated as household waste.

Instead it shall be handed over to the applicable collection point for the recycling of electrical and electronic equipment.

By ensuring this product is disposed of correctly, you will help prevent potential negative consequences for the environment and human health, which could otherwise be caused by inappropriate waste handling of this product.

The recycling of materials will help to conserve natural resources.

EU Declaration of Conformity

We, manufacturer / importer

Balder Battery Pack 2U: PWUP-BP16PBA-AZ01B

is in conformity with

(EC conformity marking)

Tested with the listed standards, the above mentioned product was found in compliance with 2004/108/EC EMC Directive and with 2006/95/EC LVD Directive.

Logo

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Related Manuals