GROWATT MIN 2500-6000 TL-XH Solar Inverter User Guide

June 9, 2024
Growatt

GROWATT MIN 2500-6000 TL-XH Solar Inverter

GROWATT-MIN-2500-6000-TL-XH-Solar-Inverter-PRODUCT

Product Information

Overview

The Min 2500-6000 TL-XH is an inverter used for converting DC power generated by solar panels into AC power that can be used in homes or businesses. It comes with a mounting bracket, self-tapping screws, safety-lock screw, plastic expansion pipe, monitor (optional), signal connector, and installation tools.

Object Description Quantity
A Inverter 1
B Mounting bracket 1
C Quick Guide 1
D Monitor(Optional) 1
E Signal connector 2
F Self-tapping screws 3
G Safety-lock screw 1
H Plastic expansion pipe 3
I PV+/PV- terminal 2/2
--- --- ---
J PV+/PV- and BAT+/BAT- metal terminal 3/3
K AC connector 1
L Uninstall signal or AC connector tool 1
M Uninstall PV or BAT terminal tool 1

Installation Requirements

The Min 2500-6000 TL-XH requires a minimum tilt and space of 2500mm – 6000mm. Before installation, check that all components are present and undamaged. If any damage is found or any component is missing, contact your dealer.

Installing the Device

  1. Install the Mounting Bracket and Min 2500-6000 TL-XH by drilling holes and fixing the wall bracket using the provided screws.
  2. Ensure that the Monitor (optional) is securely installed on the inverter side.
  3. Connect the PV input power cable, BAT input power cable, AC output power cable, and SYS COM signal cable according to the instructions provided in sections 3.1 – 3.5 below.
  4. Lock the housing on the client side to secure the device.

Installation Requirements
Tilt and Space

GROWATT-MIN-2500-6000-TL-XH-Solar-Inverter-FIG-2

Installing the Monitor
Ensure that the Monitor is installed securely.

GROWATT-MIN-2500-6000-TL-XH-Solar-Inverter-FIG-3

Ensure that the Monitor is installed securely.

GROWATT-MIN-2500-6000-TL-XH-Solar-Inverter-FIG-4

Connecting Cables

Installing the PV Input Power Cable

GROWATT-MIN-2500-6000-TL-XH-Solar-Inverter-FIG-5

  1. Connect the positive and negative metal terminals to the positive and negative connectors on the PV input power cable respectively.
  2. Pull the PV input power cable back to ensure that it is connected securely on the inverter side.

Installing the BAT Input Power Cable

GROWATT-MIN-2500-6000-TL-XH-Solar-Inverter-FIG-6

  1. Connect the positive and negative metal terminals to the positive and negative connectors on the BAT input power cable respectively.
  2. Pull the BAT input power cable back to ensure that it is connected securely on the inverter side.

Installing the AC Output Power Cable

GROWATT-MIN-2500-6000-TL-XH-Solar-Inverter-FIG-7

  1. Connect the AC output power cable to the AC connector on the inverter side.
  2. Lock the housing on the client side to secure the device.

Notice: On the right is the Australian special AC connector. Suggest using 6mm2 cables Ensure the exposed core wire is totally inserted into the cable hole and connected securely.

Installing the SYS COM Signal Cable

GROWATT-MIN-2500-6000-TL-XH-Solar-Inverter-FIG-8

  1. Connect RS485A2 or RS485B2 to Min ShineBus or third-party monitoring equipment, depending on your system requirements.
  2. Connect RS485A1 or RS485B1 to your meter signal.
  3. Connect BAT-B to BDC communication RS485B or CANL.
  4. Connect BAT-A to BDC communication RS485A or CANH.
  5. Click the connectors into place on the inverter side.

SYS COM Port Pin Definitions

NO Definition
1 Enable-: Connect BDC enable signal port negative
2 Enable+: Connect BDC enable signal port positive
3 RS485A2:Connect Min ShineBus or Third party monitoring equipment
4 RS485B2:Connect Min ShineBus or Third party monitoring equipment
5 RS485A1:Signal for meter
6 RS485B1:Signal for meter
7 BAT-B: Connect BDC communication RS485B or CANL
8 BAT-A: Connect BDC communication RS485A or CANH

Installing the COM Signal Cable
We use 8Pin COM Port Connector as Power Control Interface(PCI) for European models or Connector as inverter DRED connection(DRM) for Australia. For European models, connect the PCI connector to the inverter side and connect pins 1-6 as follows: +12V, GND, Relay contact 1 input, Connect to RRCR, Not connected, K1- output.

GROWATT-MIN-2500-6000-TL-XH-Solar-Inverter-FIG-9

  1. For Australian models, connect the DRED connector to the inverter side and connect pins 1-8 as follows: +12V, GND, Relay contact 1 input, Connect to RRCR, Not connected, K1- output, Relay contact 2 input, K2- output, Relay contact 3 input, K3- output, Relay contact 4 input, K4- output, and Relays common node.
  2. Click the connectors into place on the inverter side.

Note : Ensure that all cables are connected securely to prevent any accidents or damage to the device. Always follow the instructions provided in the user manual.

COM Port Pin Definitions- Power Control Interface(PCI).

NO 1 2 3 4 5 6 7 8
Function +12V GND Relay contact 1 input Relay contact 2 input Relay
contact 3 input Relay contact 4 input GND Not connected
Connect to RRCR Not connected K1- output K2- output K3- output K4-
output Relays common node Not connected

COM Port Pin Definitions- DRED connection

NO 1 2 3 4 5 6 7 8
Function +12V GND DRM1/5 DRM2/6 DRM3/7 DRM4/8 REFGEN COM/DRM0

Notice

  1. When laying out signal cables, separate them from power cables to avoid strong signal interference sources.
  2. Do not confuse the connector to the COM port and the connector to the SYS COM port.
  3. The COM port Aonly provides a functional port-PCI or DRM.

Connecting Meter

The following table describes how we can connect EASTRON meter (SDM230-Modbus)to inverter:

GROWATT-MIN-2500-6000-TL-XH-Solar-Inverter-FIG-10

Meter Pin NO. Description Connect to Inverter
1 L-in /
2 L-out AC connector & Load L
3 N-in /
4 N-out AC connector & Load N
5 RS485A SYS COM Pin 5 RS485A1
6 RS485B SYS COM Pin 6 RS485B1

The following table describes how we can connect CHINT meter (DDSU666) to inverter:

GROWATT-MIN-2500-6000-TL-XH-Solar-Inverter-FIG-11

Meter Pin NO. Description Connect to Inverter
1 L-in /
2 L-out AC connector & Load L
3 N-in /
4 N-out AC connector & Load N
7 RS485A SYS COM Pin 5 RS485A1
8 RS485B SYS COM Pin 6 RS485B1

Verifying the Installation

  1. The Min 2500-6000TL-XH is installed correctly and securely.
  2. The Monitor is installed correctly and securely.
  3. The Ground cable is connected correctly and securely.
  4. The DC switch and all the switches connecting to the Min 2500-6000TL-XH are OFF.
  5. The AC output power cable, PV&BAT input power cable and signal cable are connected correctly and securely.
  6. Unused terminals and ports are locked by watertight caps.

Button touch operation

Touch button Description
Single touch Switch display or Number +1
Double touch Enter
Three touch Previous menu
Hold 5s Confirm country setting or Number recover defaut value

Powering On the System

  1. Step1 : Turn on the DC switch at the bottom of the Min 2500-6000TL-XH.
  2. Step2 : Turn on the AC switch between the Min 2500-6000TL-XH and the power grid.
  3. Step3 : When the OLED show ”Country/Area VDE0126”, Please Set the country follow the below step4. Country/Area VDE0126 When the OLED show ”Country/Area Australia”, Please Set the country follow the step5 Country/Area Australia
  4. Step4 : Single touch to switch Country, such as N4105, Then jump to step6.
  5. Step5 : Single touch to switch Country, such as Newzealand. Country/Area Newzedland
  6. Step6 : Press the touch key for 5s or No operation on the OLED for more than 30S (The country of the current interface is selected by default)the OLED shows Country setting is complete Set OK

Tips
If the LED light is green, the system is operating normally. You can reset the country by “Set Country” in the submenu of “Set parameter”.

Shenzhen Growatt New Energy Co., Ltd 4-13/F,Building A,Sino-German(Europe) Industrial Park, Hangcheng Ave,Bao’an District, Shenzhen, China

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals