Cell2 B19 Internal Magnetic Mount User Manual
- June 9, 2024
- Cell2
Table of Contents
Cell2 B19 Internal Magnetic Mount
WIRING/ OPERATION
-
RED: To +VDC with Fuse (Fuse Rating 5A @12-24VDC)
-
BLACK: To Chassis Ground (-)
-
WHITE: Apply +VDC continually for low power operation
Note: All units should be set at the same pattern
Momentarily apply +VDC to Y ….. OW wire:- once for next pattern
- quick 3 times to Flash Pattern 1.
FP# | FLASH PATTERNS |
---|---|
1 | Double [R65] |
2 | Single [2Hz] |
3 | Quad [2Hz] |
4 | Single [SAE] [CA 13] |
5 | Double [SAE] |
6 | Quad [SAE] |
7 | Quint [SAE] |
8 | Mega |
9 | Ultra [SAE] |
10 | Single-Quad |
11 | Single H/L |
12 | Rotator x1 |
13 | Rotator x2 |
14 | Rotator x2 – Quint |
MIRROR MOUNTING
OPEN
- Remove 2 screws from the base that secures the dome.
- Remove the dome with a flat-blade screwdriver, then lift the lens with both hands in an upright direction.
CAUTION: Beware of scratching the inner dome surface.
CAUTION: Lift with both hands in an upright direction!
INSTALLATIONS
- Locate 3 assembling holes (130mm or 144mm) on the inside bottom of the beacon base and remove 3 screw hole plugs.
- Assemble the mirror mount bracket on to the beacon: make wire passage through the wire guard center hole, align the beacon with the bracket and secure it with 3 screws.
- Secure the beacon assembly on to the mirror using the supplied LI-Bolts (Choose either 1 1/8″ clamp or a 7/8″ clamp) and elastic stop nuts.
Mirror Mount
CLOSE
- Check that the gasket is properly seated around the inner dome.
- Align the dome with base notch, and carefully place the dome firmly on to the base.
- Secure the dome with 2 screws on either side. Suggested torque force 6.5~6kgf-cm.
CAUTION: The gasket must be properly seated around the inner dome. CAUTION: Align the dome with base notch, and carefully place the dome firmly on to the base.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>