EG4 ELECTRONICS Brightmount Fixed Angle Ground Mount System Installation Guide
- June 9, 2024
- EG4 ELECTRONICS
Table of Contents
EG4 ELECTRONICS Brightmount Fixed Angle Ground Mount System

PARTS DIAGRAM

DIMENSIONS AND LAYOUT

INSTALLATION
Tools needed

- A Install leg group Using a M8’80 boli, M8 washers, M8 nut Install the U45 connector as shown to the right

- B Install mounting bracket using M8’65 bolts, M8 washers and M8 nuts to connect the legs to the mounting bracket as shown to the left
- C Install ‘L’ foot M8’65 bolt, M8 washers, and M8 nut to Install the “L’ foot.


- F Connect the frames together using Junction brackets, and M8 allen bolts

- Completed cunstructlon.

- Install PV modules using the End & Mid clamps.

- H Install earth lug on the end of the rails.
www.eg4electronics.com support@eg4electronics.com Sulphur Springs. TX Dec 2022 Ver 1.1.0 1 Specifications subject to change without notice
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>