EG4 Electronics 14.3kWh Wall Mount All Weather User Guide

May 15, 2024
EG4 ELECTRONICS

EG4-LOGO

EG4 Electronics 14.3kWh Wall Mount All Weather

EG4-Electronics-14-3kWh-Wall-Mount-All-Weather-PRODUCT

Product Information

Specifications

  • Product Name: WallMount All Weather
  • Application: Outdoor usage
  • Designed: to meet international safety regulations
  • Installation: Must follow applicable national or local standards and regulations

Product Usage Instructions

Safety Instructions

Danger! Avertissement! International safety regulations have been strictly observed in the design and testing of the battery. Before beginning any work, carefully read all safety instructions, and always observe them when working on or with the battery. Incorrect installation may cause:

  1. Beware of high battery current. Ensure that the battery module breakers and/or on/off switches are in the open or off position before installing or working on the battery.
  2. Do not open the battery while it is operating to avoid electric shock and damage from live voltage and current within the system.
  3. Do not make any connections or disconnections (PV, battery, grid, communication, etc.) while the battery is operating.
  4. An installer should be well protected by appropriate insulative equipment (e.g., personal protective equipment) before working on the system.
  5. Inspect all existing wiring before installing, operating, or maintaining the system to ensure it meets appropriate specifications and conditions for use.
  6. Ensure PV, battery, and grid connections are secure and proper to prevent damage or injuries caused by improper installation.
  7. All work on this product must be carried out by qualified personnel to reduce the risk of injury.

Installation Guide

Follow these steps for installing the WallMount All Weather product:

  1. Locate a suitable outdoor wall for installation following the provided location selection guidelines.
  2. Ensure the area is safe and free from any obstructions before proceeding with the installation.
  3. Install the battery following all safety instructions mentioned above to avoid any potential hazards.

Battery Installation

To install the battery, follow these steps:

  1. Make sure all power sources are turned off before starting the installation process.
  2. Securely mount the battery on the designated wall mount following the provided orientation examples.
  3. Connect the battery to the appropriate power sources ensuring proper connections are made.
  4. Check all connections using a voltmeter to confirm there is no DC voltage present before turning on the system.

Maintenance

Regular maintenance of the WallMount All Weather product is essential to ensure optimal performance and safety. Follow these maintenance tips:

  1. Periodically check all connections for any signs of wear or damage.
  2. Clean the exterior of the battery unit to prevent dust accumulation that can affect performance.
  3. Monitor battery performance regularly and address any issues promptly.

FAQ

  • Q: Who should install the WallMount All Weather product?
  • A: All work on this product must be carried out by qualified personnel to ensure safety and proper installation. Do not attempt to install or service the product unless you are qualified to do so.
  • Q: Can I open the battery while it is operating?
  • A: No, it is not safe to open the battery while it is operating as it may result in electric shock or damage from live voltage and current within the system. Always ensure all power sources are turned off before any maintenance work.

SAFETY

SAFETY INSTRUCTIONS

DANGER! AVERTISSEMENT!

International safety regulations have been strictly observed in the design and testing of the battery. Before beginning any work, carefully read all safety instructions, and always observe them when working on or with the battery. The installation must follow all applicable national or local standards and regulations.

Incorrect installation may cause

  • Injury or death to the installer, operator or third-party
  • Damage to the battery or other attached equipment

IMPORTANT SAFETY NOTIFICATIONS

Various safety concerns must be carefully observed before, during, and after the installation, as well as during future operation and maintenance. The following are important safety notifications for the installer and any end users of this product under normal operating conditions.

  1. Beware of high PV voltage. Please install an external DC disconnect switch or breaker and ensure it is in the “off” or “open” position before installing or working on the battery. Use a voltmeter to confirm there is no DC voltage present to avoid electric shock.
  2. Beware of high grid voltage. Please ensure the AC switch and/or AC breaker are in the “off” or “open” position before installing or working on the battery. Use a voltmeter to confirm there is no voltage present to avoid electric shock.
  3. Beware of high battery current. Please ensure that the battery module breakers and/or on/off switches are in the “open” or “off” position before installing or working on the battery. Use a voltmeter to confirm there is no DC voltage present to avoid electric shock.
  4. Do not open the battery while it is operating to avoid electric shock and damage from live voltage and current within the system.
  5. Do not make any connections or disconnections (PV, battery, grid, communication, etc.) while the battery is operating.
  6. An installer should make sure to be well protected by reasonable and professional insulative equipment [e.g., personal protective equipment (PPE)].
  7. Before installing, operating, or maintaining the system, it is important to inspect all existing wiring to ensure that it meets the appropriate specifications and conditions for use.
  8. Ensure that the PV, battery, and grid connections to the battery are secure and proper to prevent damage or injuries caused by improper installation.

WARNING: To reduce the risk of injury, read all instructions

All work on this product (system design, installation, operation, setting, configuration, and maintenance) must be carried out by qualified personnel. To reduce the risk of electric shock, do not perform any servicing other than those specified in the operating instructions unless you are qualified to do so.

  1. Read all instructions before installing. For electrical work, follow all local and national wiring standards, regulations, and installation instructions.
  2. Make sure the battery is properly grounded. All wiring should be under the National Electrical Code (NEC), ANSI/NFPA 70.
  3. The battery and system can interconnect with the utility grid only if the utility provider permits. Consult with your local AHJ (Authority Having Jurisdiction) before installing this product for any additional regulations and requirements for your area.
  4. All warning labels and nameplates on this battery should be visible and must not be removed or covered.
  5. The installer should consider the safety of future users when choosing the battery’s correct position and location as specified in this manual.
  6. Please keep children away from touching or misusing the battery and relevant systems.

DISCLAIMER
EG4 reserves the right to make changes to the material herein at any time without notice. Please refer to www.eg4electronics.com for the most updated version of our manuals/spec sheets.

PACKING LIST

The items listed below will arrive with the product shipment:
EG4 WallMount All Weather

EG4-Electronics-14-3kWh-Wall-Mount-All-Weather-FIG-2

The mounting bracket will arrive attached to the back of the battery

LOCATION SELECTION AND INSTALLATION

Requirements for installation location:

  • The wall mount is heavy. Use a lift or other equipment to lift and carry the unit.
  • The battery can be installed on either flat ground or on the wall. If installing on flat ground, ensure there is proper drainage on the ground surrounding the battery to maintain the integrity of the module over time. If installing on the wall, ensure at least a 12 in. gap on each side of the unit for adequate airflow and operations.
  • Install the battery in a location that prevents damage from flooding.
  • Ensure the battery is mounted upright.
  • The battery must be installed with at least 12 in. of clearance on all sides of the unit.

NOTE: The battery will be shipped with temporary lifting handles for removing the battery from its packaging. The battery is very heavy. Use the team-lift technique during installation and remove the temporary lifting handles before making any connections within the system.

PARALLEL EXAMPLES
The diagrams below show different parallel orientations. These diagrams are for reference only!

EG4-Electronics-14-3kWh-Wall-Mount-All-Weather-FIG-3

ORIENTATION EXAMPLES

EG4-Electronics-14-3kWh-Wall-Mount-All-Weather-FIG-4

INSTALLING THE BATTERY

The WallPower All Weather battery is designed to be wall-mounted. Follow the steps listed below to ensure the battery is mounted correctly.

NOTE: The battery will be shipped with temporary lifting handles for removing the battery from its packaging. EG4 recommends these handles be removed before making any connections.

STANDALONE BATTERY INSTALL

  1. Remove the 4 set screws holding the mounting bracket to the back of the battery pack and set them to the side.
  2. Remove the mounting bracket from the battery.
  3. Position the bottom of the mounting bracket on the wall at the desired mounting height, with a minimum clearance of 28.0625 in. from the ground.
  4. Using a level, ensure the bracket is level and drill 6 holes to accommodate the mounting hardware used.
  5. Secure the mounting bracket to the wall using the included expansion bolts or appropriate hardware required for the mounting surface.
  6. Attach the battery pack to the mounting bracket. Using the team-lift technique, lift the battery and hook the back flange onto the front flange of the mounting bracket.
  7. Secure the battery to the mounting bracket using the 4 included side screws.
  8. Finally, properly ground the battery, attaching a grounding conductor to the M6 grounding screw on top of the battery to the Equipment
    Grounding System. DO NOT GROUND THE NEGATIVE BATTERY CABLE!

BATTERY INSTALL WITH CONDUIT BOX

  1. Remove the 4 set screws holding the mounting bracket to the back of the battery pack and set them to the side.
  2. Remove the mounting bracket from the battery.
  3. Position the mounting bracket on the wall at the desired mounting height, with a minimum clearance of 28.0625 in.
  4. Using a level, ensure the bracket is level and drill 6 holes to accommodate the mounting hardware used.
  5. Secure the mounting bracket to the wall using the included expansion bolts (concrete or brick walls) or appropriate hardware for the mounting surface.
  6. Attach the battery to the mounting bracket. Using the team-lift technique, lift the battery and hook its back flange onto the front flange of the mounting bracket.
  7. Secure the battery to the mounting bracket using the 4 included side screws.
  8. Attach the optional conduit box to the top of the battery using the included hardware.
  9. Finally, properly ground the battery, attaching a grounding conductor to the M6 grounding screw on top of the battery to the Equipment Grounding System. DO NOT GROUND THE NEGATIVE BATTERY CABLE!

NOTE: If mounting the bracket at 28.0625 in. from the ground, the battery will rest on the ground.

BATTERY INSTALL WITH CONDUIT BOX & 18KPV

The WallPower All Weather battery is designed to mate perfectly with the EG4 18kPV Hybrid Inverter.
Follow the steps listed below to ensure proper connections are made in the system.

  1. Remove the 4 set screws holding the mounting bracket to the back of the battery pack and set them to the side.
  2. Remove the mounting bracket from the battery.
  3. Position the mounting bracket on the wall at the desired mounting height, with a minimum clearance of 28.0625 in.
  4. Using a level, ensure the bracket is level and drill 6 holes to accommodate the mounting hardware used.
  5. Align the provided X-bracket with the holes on the mounting bracket and secure both to the wall, using the included expansion bolts (concrete/brick walls) or appropriate hardware required for the mounting surface. The X-bracket will be behind the mounting plate, against the wall.
  6. Attach the optional conduit box to the top of the battery using the included hardware.
  7. Attach the 18kPV to the inverter mounting bracket and ensure the inverter’s bottom knockouts align with the conduit box.
  8. Finally, properly ground the battery, attaching a grounding conductor to the M6 grounding screw on top of the battery to the Equipment Grounding System. DO NOT GROUND THE NEGATIVE BATTERY CABLE!

The image to the right represents a completed install showing a rear view.

EG4-Electronics-14-3kWh-Wall-Mount-All-Weather-FIG-7

PRE-WIRE STEPS AND WIRING

Refer to the table below for wire size and torque recommendations for the battery cables.

# OF CABLES| CABLE SIZE| MAX. DISTANCE| TORQUE VALUES
---|---|---|---
2 sets| 1/0 AWG (53.5 mm2)| 10 ft.| Max. 165 in-lbs. (18.6 Nm)
2 sets| 2/0 AWG (67.4 mm2)| 20 ft.| Max. 165 in-lbs. (18.6 Nm)
1 set| 4/0 AWG (107 mm2)| 10 ft.| Max. 275 in-lbs. (31.1 Nm)
1 set| 250 kcmil (127 mm2)| 20 ft.| Max. 275 in-lbs. (31.1 Nm)

IMPORTANT The battery is capable of charging/discharging up to 200A before the BMS shuts off the pack. Ensure the inverter is configured to handle this high of a current and size all wires accordingly! Refer to an NEC- approved ampacity chart or consult with the installer or a solar electrician for more information.

MULTIPLE BATTERY PARALLEL INSTALL

When paralleling multiple WallMount All Weather batteries, an optional paralleling kit must be purchased through the distributor.
Follow the steps outlined below to ensure the proper installation of multiple batteries in parallel.

  1. Ensure all circuit breakers are open (off). Using a multimeter, check for voltage at all available disconnects and lines. Once no voltage is confirmed, proceed to the next step.
  2. Set the DIP switch address on the master battery to address 1, and all other batteries in parallel to differing addresses going in ascending order. (See image)
  3. Reset the battery BMS via the power button to register the address change.
  4. Set up communication between the batteries via the “Battery-Com” ports by using a CAT 5, 5e, or 6 cable. Refer to the image below for an example.EG4-Electronics-14-3kWh-Wall-Mount-All-Weather-FIG-9
  5. The battery set to address 1 will connect directly to the inverter BMS communication port via CAT 5, 5e or CAT 6 cable.
  6. Install battery paralleling cables between the batteries included in the optional paralleling kit ensuring the connectors are seated properly.

MULTIMETER TESTING AND WIRING
Follow the steps outlined below to both test the inputs and wire the battery pack to the inverter.

  1. Ensure all circuit breakers are open (off). Using a multimeter, check for voltage at all available disconnects and lines. Once no voltage is confirmed, proceed to the next step.

  2. Connect the included sets of 2/0 AWG (70mm?) with outdoor-rated connectors to the battery’s positive and negative terminals. The connectors will “click” when seated properly.
    NOTE: If installing the battery pack with the optional conduit box, secure the conduit fittings to the enclosure using the counter nuts after step

  3. If applicable, route the battery power cables through the conduit box to the inverter without making any connections!
    DANGER!
    No connections should be made until proper polarity of cables has been confirmed!

  4. Ensure proper polarity of cables. Once confirmed, proceed to the next step.

  5. Install the 2 positive battery cables to the inverter’s positive battery terminals following proper torque values.

  6. Install the 2 negative battery cables to the inverter’s negative battery terminals following proper torque values.

BMS COMMUNICATIONS

EG4 batteries interface with compatible inverters by designating a “Master” battery (DIP switch ID No. 1).

EG4-Electronics-14-3kWh-Wall-Mount-All-Weather-FIG-10

  • The battery will connect directly to the inverter via an RS485 battery communications cable or a standard CAT 5, 5e, or 6 cable for closed-loop communications with supported EG4 and non-EG4 inverters using CAN bus protocol.
  • The PC software “BMS TOOLS” provides real-time battery analysis and diagnostics. The battery cannot communicate with the software and a closed-loop inverter simultaneously.
  • Scan the QR code for a white sheet walking through the BMS Tools setup process.

EG4-Electronics-14-3kWh-Wall-Mount-All-Weather-FIG-11

CLOSED-LOOP COMMUNICATIONS

  1. Power off all battery DC breakers and BMS power buttons.
  2. The inverter protocol can only be changed with the master battery temporarily set to address 64 (all switches ON). After the DIP switch is changed, restart the BMS using the BMS power button for the settings to take effect. (See image)
  3. On the master battery, press and hold the “Return” key for 5 seconds and release it to enter the “Protocol Setting” menu.
  4. Select the corresponding CAN protocol (P01-EG4/LUX) for the system if using EG4 inverters, (See table below).
  5. Change the master DIP switch address back to address 1 for inverter communications & power cycle the BMS. (See image)

The tables below show compatibility lists depending on the type of communication protocol used for closed-loop communications between the battery and inverter.

CLOSED-LOOP COMMS. WITH EG4 INVERTERS

MODEL| PROTOCOL SELECTION
18kPV| CAN – P01
6000XP| CAN – P01
8k Hybrid| CAN – P01
6000-EX| RS485 – P01
6500-EX| RS485 – P01

3000EHV| RS485 – P01 ***
CAN PROTOCOL LIST**

PROTOCOL #| MANUFACTURER
P01-EG4/LUX| EG4/LUX
P02-GRW| Growatt
P03-SLK| Sol-Ark
P04-DY| Deye
P05-MGR| Megarevo
P06-VCT| Victron
P07-LUX| Luxpower
P08-SMA| SMA
RS485 PROTOCOL LIST

PROTOCOL #| MANUFACTURER
P01-EG4| EG4
P02-GRW| Growatt
P03-SLK| Sol-Ark
P04-SCH| Schneider

NOTE: Closed loop communications using RS485 protocols require a specific pinout on the comms cable from battery to inverter. Refer to the table below for EG4 specifics.

EG4 INVERTER MODEL COMMUNICATION CABLE PINOUT
3000EHV To Inverter – USB Type B

To Battery – RJ45 Pins 1-B & 2-A

6000EX| To Inverter – RJ45 Pins 3 & 5

To Battery – RJ45 Pins 1-B & 2-A

6500EX| To Inverter – RJ45 Pins 3 & 5 To Battery – RJ45 Pins 1-B & 2-A

FIRMWARE UPDATES

  • Always ensure all system components are fully up to date before commissioning the system.
  • Navigate to the EG4 WallMount All Weather product page to find the latest downloads for the battery. A PDF walkthrough will be included in the downloaded .zip file.
  • If encounter difficulties during the updating process, contact the distributor for more information.

CONTACT

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

EG4 ELECTRONICS User Manuals

Related Manuals