oventrop HydroCom V Double Regulating and Commissioning Valve Installation Guide
- June 9, 2024
- oventrop
Table of Contents
oventrop HydroCom V Double Regulating and Commissioning Valve
Safety and installation advice
- OVENTROP GmbH & Co. KG
- Paul-Oventrop-Straße 1
- 59939 Olsberg
- DEUTSCHLAND
- www.oventrop.com
- Technischer Kundendienst
- Telefon: +49 (0) 29 62 82-234
- Water / glycol mixtures with a max. glycol content of 50%
Kvs
- DN15 2,0
- DN20 3,7
- DN25 5,9
- DN32 13,0
Correct use
Work on this product may only be carried out by suitably qualified specialist
tradespeople.
The Hydro Com V double regulating and commissioning valve is installed in the
risers of hot water central heating systems and cooling systems and enables
the hydronic balancing of the risers among each other.
The HydroCom A shutoff valve is installed in the risers of hot water central
heating systems and cooling systems and enables the risers to be shut off.
Any use beyond and/or different from this is considered improper use.
Installation
Observe the instructions for installation in the operating instructions for this product
- Fit the double regulating and commissioning valve/shutoff valve into the pipe.
- 2 Screw the double regulating and commissioning valve/shutoff valve on tightly.
Disposal
When the product reaches the end of its service life or has an irreparable defect, it must be dismantled and disposed of in an environmentally friendly manner or the components must be recycled.
NOTICE
Risk of environmental pollution!
Incorrect disposal may lead to environmental damage.
- Dispose of packaging material in an environmentally friendly manner.
- If possible, recycle the components.
- Dispose of components which cannot be recycled according to the local regulations.
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>