DucoBox Energy Printed Circuit Board PCB User Manual

June 9, 2024
Duco

**DucoBox Energy Printed Circuit Board PCB

**

Instruction

  1. Make a note of the settings (if the screen is still legible)
    • a. Scroll down to ADVANCED and press enter
    • b. Enter the code 9876 and press enter
    • c. Scroll down to CALIBRATION → WIZARD and press enter
    • d. Record pressure drops and flow rates at supply & extract
  2. Pull the plug out of the power socket
  3. Click on both sides using a screwdriver to remove the control unit from the device
  4. Disconnect the cables from the circuit board
  5. Detach the circuit board, insert the new one and click it into its place
  6. Reconnect the cables, see the drawing/pictures below
  7. Click the control unit onto the device
  8. Put the plug into the socket.
  9. Set the unit using the enable code
    • a. Long press ENTER (> 5 sec) and release
    • b. Select the device and press ENTER
    • c. Please contact DUCO on +32/58/33.00.33
    • d. Mention the subtype (found on the CE label) and the device ID, that can be read from the display
    • e. Enter the code you receive from DUCO
  10. After starting up the unit, continue with the following (see “DucoBox Energy Installation Manual”)
    • a. Pairing control components
    • b. Air-side calibration
    • This can be done based on the flow rates and settings recorded in step 1
    • The valves do not need to be calibrated or adjusted again
    • However, the flow rates through the valves need to be measured again

Assembly Instruction

  1. Use a screwdriver to press the tabs in at the position shown and slide the cover forwards by around 1 cm.

  2. Lift the cover off the unit.

  3. Assembly Instruction

Product Overview

Product Overview

References

Read User Manual Online (PDF format)

Loading......

Download This Manual (PDF format)

Download this manual  >>

Related Manuals