DucoBox Energy Printed Circuit Board PCB User Manual
- June 9, 2024
- Duco
Table of Contents
**DucoBox Energy Printed Circuit Board PCB
**
Instruction
- Make a note of the settings (if the screen is still legible)
- a. Scroll down to ADVANCED and press enter
- b. Enter the code 9876 and press enter
- c. Scroll down to CALIBRATION → WIZARD and press enter
- d. Record pressure drops and flow rates at supply & extract
- Pull the plug out of the power socket
- Click on both sides using a screwdriver to remove the control unit from the device
- Disconnect the cables from the circuit board
- Detach the circuit board, insert the new one and click it into its place
- Reconnect the cables, see the drawing/pictures below
- Click the control unit onto the device
- Put the plug into the socket.
- Set the unit using the enable code
- a. Long press ENTER (> 5 sec) and release
- b. Select the device and press ENTER
- c. Please contact DUCO on +32/58/33.00.33
- d. Mention the subtype (found on the CE label) and the device ID, that can be read from the display
- e. Enter the code you receive from DUCO
- After starting up the unit, continue with the following (see “DucoBox Energy Installation Manual”)
- a. Pairing control components
- b. Air-side calibration
- This can be done based on the flow rates and settings recorded in step 1
- The valves do not need to be calibrated or adjusted again
- However, the flow rates through the valves need to be measured again
Assembly Instruction
-
Use a screwdriver to press the tabs in at the position shown and slide the cover forwards by around 1 cm.
-
Lift the cover off the unit.
Product Overview
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>