TFC Group WIR16JB 16 Way Junction Box Installation Guide
- June 3, 2024
- TFC Group
Table of Contents
Group WIR16JB 16 Way Junction Box
Installation Guide
WIR16JB 16 Way Junction Box
WIRE RITE JUNCTION BOX WIR16JB
INSTALLATION INSTRUCTIONS FOR ‘S-PLAN’ SYSTEM, USING TWO x 2-PORT MOTORISED
VALVES ALL WIRING MUST BE ACCORDING TO CURRENT I.E.E. WIRING REGULATIONS, AND
MUST BE CARRIED OUT BY A QUALIFIED INSTALLER. CONNECT SYSTEM CONTROL
COMPONENTS TO NUMBERED TERMINALS ACCORDING TO THE SCHEMATIC DIAGRAM BELOW.
THE SCHEMATIC DIAGRAM IS SUITABLE ONLY FOR MAINS-RATED COMPONENTS AND SWITCH
INPUTS TO PUMP & BOILER.
FOR CLARITY, NEUTRAL AND EARTH CONNECTIONS ARE NOT SHOWN-THERE ARE FOUR PRE-
LINKED TERMINALS FOR ALL NEUTRAL CONDUCTORS, AND FOUR SEPARATE PRE-LINKED
TERMINALS FOR ALL EARTH CONDUCTORS.
FIT ADDITIONAL LINKS AS INDICATED BY DOTTED LINES. ENSURE WIRING IS NEAT, AND
OF OPTIMUM LENGTH TO MINIMISE BUNCHING. USE CABLE RESTRAINTS. DO NOT TRAP OR
PINCH WIRES WHEN RE-FITTING JUNCTION BOX COVER.
WIRERITE JUNCTION BOX WIR16JB
INSTALLATION INSTRUCTIONS FOR ‘Y-PLAN’ SYSTEM, USING ONE THREE-PORT MOTORISED
VALVE ALL WIRING MUST BE ACCORDING TO CURRENT I.E.E. WIRING REGULATIONS, AND
MUST BE CARRIED OUT BY A QUALIFIED INSTALLER. CONNECT SYSTEM CONTROL
COMPONENTS TO NUMBERED TERMINALS ACCORDING TO THE SCHEMATIC DIAGRAM BELOW. THE
SCHEMATIC DIAGRAM IS SUITABLE ONLY FOR MAINS-RATED COMPONENTS AND SWITCH
INPUTS TO PUMP & BOILER.
FOR CLARITY, NEUTRAL AND EARTH CONNECTIONS ARE NOT SHOWN-THERE ARE FOUR PRE-
LINKED TERMINALS FOR ALL NEUTRAL CONDUCTORS, AND FOUR SEPARATE PRE-LINKED
TERMINALS FOR ALL EARTH CONDUCTORS.
FIT ADDITIONAL LINKS AS INDICATED BY DOTTED LINES. ENSURE WIRING IS NEAT, AND
OF OPTIMUM LENGTH TO MINIMISE BUNCHING. USE CABLE RESTRAINTS. DO NOT TRAP OR
PINCH WIRES WHEN RE-FITTING JUNCTION BOX COVER.
QR0513 Prepared for TFC Group by: J.
Todd Issue 1: September 2020
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>