TFC Group TRADE03 Magnetic Filter Instruction Manual
- June 9, 2024
- TFC Group
Table of Contents
TFC Group TRADE03 Magnetic Filter
Component parts
Installation Instructions
- Locate a suitable site for the filter to allow access and servicing.
- Return pipe is recommended, do not fit it between the boiler and the overflow on the open vented systems.
- Release and drain the heating system pressure.
- Mark the pipe, using a suitable tool to cut 190mm out of the marked section and remove burrs.
- Fit the isolating valves provided onto both inlet and outlet pipes.
- Introduce the diverter, ensuring the arrow direction follows the heating system flow.
- Fit the diverter using the provided flat washers, and tighten the inner nuts fully.
- After that, tighten the outer compression nuts on valves to ensure a watertight seal.
- Fit the filter body to the diverter and hand tighten the locking collar (Do not over tighten).
- The Filter body must be installed vertically.
- This filter’s magnetic bar is removable.
- Open the isolation valves and turn on heating system.
- Vent as required by using the Top Air Bleed Valve.
Annual Servicing Requirement
- Isolate the heating system and close both of the two isolating valves. Prepare a suitable bucket to collect spillage.
- Unscrew the knurled moulding at the top of the filter and withdraw the magnetic bar.
- Drain the filter chamber into the bucket using the drain-off valve (e)
- Use the castellated wrench (s) supplied (or a strap wrench) to loosen the lower body (d) of the filter chamber. Unscrew the filter body fully, clean the body (d), the plastic filter (i) and the magnet cover (c) using hot, soapy water, and rinse with fresh water.
- Re-assemble the body (d) to the upper section (b), taking care to fit the plastic mesh filter (i) centrally inside body (d), and O-ring (f) onto the recess above the female threaded section of body (d).
- Fully hand-tighten the lower body (d) to upper body (b). Ensure drain-off valve is closed.
- Partly open the inlet valve (according to flow direction arrow on rotating joint (k)) and the brass air vent bleed screw, until all air is removed. Close bleed screw, then fully open inlet and outlet valves and check for leaks.
- Start the heating system
Chemical dosing
- Isolate the boiler and close both isolating valves.
- Release air pressure by opening the Top Air Bleed valve.
- Prepare a suitable bucket to collect spillage.
- Drain the filter fully via drain-off valve (e).
- Unscrew and remove filter body (d) as per
- above. Fill body (d) with water treatment chemical (capacity 300ml). Re-assemble body (d) to body (b) as per 5. Above. 4.
- Re-connect the filter to the heating system as per 6. above.
- Run the system for approximately 5 minutes to disperse chemical additive into system.
- Repeat 1. – 5. if necessary to add any further water treatment chemical into the system.
Trouble shooting
- Problem 1: Water is leaking from the filter
- Solution: Turn off the system, close the isolating valves. Perform the following checks:
- Check all seals for location and condition.
- Check the isolating valve nuts to ensure they are fully tightened.
- Check the converter locking collar is firmly tightened and not cross threaded.
- Problem 2: Poor flow through filter
- Solution: Clean the filter when reduced flow is noted.
TFC Group
- TFC Group LLP Tower House
- Vale Rise, Tonbridge, Kent TN9 1TB
- Telephone: 01732 351680
- Fax: 01732 354445
- Web: www.tfc-group.co.uk
References
Read User Manual Online (PDF format)
Read User Manual Online (PDF format) >>