ELTEC CYBOX GW 2-P Mobile Wireless Gateway with 5G and WIFi 5, Wave2 Installation Guide
- June 3, 2024
- ELTEC
Table of Contents
ELTEC CYBOX GW 2-P Mobile Wireless Gateway with 5G and WIFi 5, Wave2
DISCLAIMER
Copyright
© 2022 ELTEC Electronic AG. The information, data, and figures in this
document including respective references have been verified and found to be
legitimate. In particular in the event of error they may, therefore, be
changed at any time without prior notice. The complete risk inherent in the
utilization of this document or in the results of its utilization shall be
with the user; to this end, ELTEC Electronic AG shall not accept any
liability. Regardless of the applicability of respective copyrights, no
portion of this document shall be copied, forwarded or stored in a data
reception system or entered into such systems without the express prior
written consent of ELTEC Electronic AG, regardless of how such acts are
performed and what system is used (electronic, mechanic, photocopying,
recording, etc.). All product and company names are registered trademarks of
the respective companies.
Our General Business, Delivery, Offer, and Payment Terms and Conditions shall
otherwise apply.
SAFETY INFORMATION
Electrical safety
WARNING
The device can be operated with voltages over 75 V DC.
Incorrect handling risks causing a fatal electrical shock.
Before connecting the power supply, connect the device to protective earth.
General advice
- Only qualified personnel is allowed to install, operate and maintain the devices.
- Please take safety precautions against electrostatic discharge (ESD).
- Access to the devices may only be granted to qualified personnel.
- To prevent the risk of electric shock, turn off the external power supply and remove the power supply cable from the electrical outlet before handling or disassembling the system.
- When adding or removing devices to or from the system, ensure that the power cables for the devices are unplugged before the signal cables are connected.
- Make sure that your power supply is set to the correct voltage in your area. If you are not sure about the voltage of the electrical outlet you are using, contact your local power company.
- If the power supply is broken, do not try to fix it by yourself. Contact a qualified service technician or your retailer.
Operation safety
WARNING
The device can become very hot during operation (> 80 ° C).
Make sure it is protected from accidental contact.
The device must be installed so that it is not accessible to children.
To prevent burns, switch off the device and allow to cool down for half an
hour before disassembling or working on it.
- Before installing the device and connecting cables to it, carefully read the related manuals.
- Before using the device, make sure all cables are correctly connected and the power cables are not damaged. If you detect any damage, contact your dealer immediately.
- Avoid dust, humidity, and temperature extremes. Do not place the product in any area where it may become wet.
- Place the product on a stable surface.
- If you encounter technical problems with the product, contact a qualified service technician or your retailer.
Radio Frequency Exposure Statement
At least 20 cm separation distance between the antenna and the user’s body
must be maintained at all times.
RECYCLING
Please recycle packaging environmentally friendly:
Packaging materials are recyclable. Please do not dispose packaging into domestic waste but recycle it.
Please recycle old or redundant devices environmentally friendly:
Old devices contain valuable recyclable materials that should be reutilized. Therefore please dispose old devices at collection points which are suitable.
EU DECLARATION OF CONFORMITY
ELTEC Electronic AG herewith declares that the device is compliant to the basic requirements of the directive 2014/53/EU. The full text of the EU declaration of conformity is available in the Download Center at www.eltec.com.
CONTACT
ELTEC Electronic AG
Galileo-Galilei-Straße 11
55129 Mainz
Germany
- Fon +49 6131 918 100
- Fax +49 6131 918 195
- Email info@eltec.com
- www www.eltec.com
ABOUT THIS DOCUMENT
This installation manual is intended only for system developers and
integrators. It is not intended for end users.
It describes the hardware functions of the product, connection of peripheral
devices and integration into a system. Additional information on special
applications and the configuration of the product is available in a separate
configuration manual which can be downloaded from the Download Center at
www.eltec.com.
OVERVIEW
PRODUCTS
This installation manual comprises all information to set-up the following product.
Figure 1 : Picture of Cybex GW 2-P
HARDWARE
DEVICE CONNECTORS
POWER SUPPLY CONNECTOR
The CyBox GW 2-P can be powered by a DC power source connected to the internal
power supply and I/O connector, shown in Table 1 . The nominal input voltage
can vary between 24 V and 110 VDC. The electrical power can be supplied to the
device using the A-coded M12 power connector, labeled PWR.
Table 1 shows the pin assignment of the power supply connector.
| PIN| SIGNAL NAME| DESCRIPTION
---|---|---|---
| 1| +VIN| Supply voltage, positive terminal
2| +VIN| Supply voltage, positive terminal
3| -VIN| Supply voltage, negative terminal
4| -VIN| Supply voltage, negative terminal
Table 1 Pin Assignment of Power Supply Connector (PWR)
M12 ETHERNET INTERFACES
The two LAN ports of the Cybex GW 2-P are utilizing M12 X-coded connectors
with the pin assignment as shown in Table 2. Mating connectors are available
from several manufacturers.
| PIN| SIGNAL NAME| DESCRIPTION
---|---|---|---
| 1| D1+| First data line plus
2| D1-| First data line minus
3| D2+| Second data line plus
4| D2-| Second data line minus
5| D4+| Fourth data line plus
6| D4-| Fourth data line minus
7| D3-| Third data line minus
8| D3+| Third data line plus
Table 2 Pin Assignment of M12 Ethernet Connectors (LAN 1/2)
M12 SERVICE INTERFACE (USB AND SERIAL PORT)
The CyBox GW 2-P is equipped with a M12-A coded USB/serial port. The USB port
can be used to attach a memory device to update the firmware or to configure
the device.
Note:
The USB port is a dedicated maintenance port. It is not designed to be used
while the device is in operation inside rolling stock equipment.
Table 3 shows the pin assignment of the service connector
| PIN| SIGNAL NAME| DESCRIPTION
---|---|---|---
| 1| USB-VCC| USB positive power supply voltage
2| USB-D-| USB negative data line
3| USB-D+| USB positive data line
4| USB-GND| USB negative power supply voltage
5| n.c.| Not connected
6| RS232-TX| Console port transmit data
7| RS232-RX| Console port receive data
8| RS232-GND| Console port ground
Table 3 Pin Assignment of M12 Service Connector
MEZZANINE EXTENSIONS
MVB INTERFACES
The MVB interfaces of the CyBox GW 2-P are utilizing D-Sub 9 connectors. Two
MVB connectors are available (in and out) to connect one MVB device. Both MVB
connectors provide the same MVB signals so that a typical MVB bus topology
connection can be realized. The pin assignment is shown in Table 4 below.
Mating connectors are available from several manufacturers.
INTERFACE | MVB IN | MVB OUT |
---|---|---|
CONNECTOR | D-SUB 9-PIN, FEMALE | |
PIN | SIGNAL NAME | DESCRIPTION |
Pin Assignment ESD+ | 1 | ADP |
2 | ADN | Data N from Line A |
3 | NC | Not connected |
4 | BDP | Data P from Line B |
5 | BDN | Data N from Line B |
6 | AGND | GND from Line A |
7 | BGND | GND from Line B |
8 | A5V | 5V from Line A |
9 | B5V | 5V from Line B |
Pin Assignment EMD | PIN | SIGNAL NAME |
1 | ADP | Data P from Line A |
2 | ADN | Data N from Line A |
3 | NC | Not connected |
4 | BDP | Data P from Line B |
5 | BDN | Data N from Line B |
6 | ATP | Termination P from Line A |
7 | ATN | Termination P from Line A |
8 | BTP | Termination P from Line B |
9 | BTN | Termination P from Line B |
GBPS ETHERNET INTERFACE
The 2.5 Gb LAN port extension of the CyBox GW 2-P is utilizing an M12 X-coded
connector with the pin assignment as shown in Table 5. Mating connectors are
available from several manufacturers.
| PIN| SIGNAL NAME| DESCRIPTION
---|---|---|---
| 1| D1+| First data line plus
2| D1-| First data line minus
3| D2+| Second data line plus
4| D2-| Second data line minus
5| D4+| Fourth data line plus
6| D4-| Fourth data line minus
7| D3-| Third data line minus
8| D3+| Third data line plus
Table 5 Pin Assignment of 2.5 Gb M12 Ethernet Connector (LAN 3)
M.2 PCIE SSD EXTENSION
The quad-core CyBox GW 2-P is equipped with an internal M.2 B-M-Key SATA SSD
with a storage capacity of up to 960 GB. In addition, an M.2 M-Key PCIe SSD
can be equipped as a mezzanine extension for all CyBox GW 2-P variants to
further extend the storage capacity.
Figure 2 Example M.2 PCIe SSD
ANTENNA CONNECTORS
The QLS antenna connectors are located at the lower part of the front panel.
All connectors are labeled for each radio interface and GNSS.
When connecting an antenna to the QLS connector, make sure that you hear a
‘click’ sound confirming proper mounting.
To remove an antenna, it has to be gently pulled from the basis of the
connector with one hand while the other hand is holding the antenna.
Alternatively, a screwdriver can be used as a lever arm at the basis of the
antenna to facilitate the removal as illustrated below.
STEP 1 | STEP 2 |
---|---|
Place the screwdriver between the connector and the gateway | Rotate and/or |
push the screwdriver while pulling the antenna
|
FRONT PANEL AND MODULE-TO-ANTENNA CONNECTIONS
The figure below provides some examples of different front panel versions.
Figure 3 Examples of Front Panels
CORRELATION FRONT PANEL LABELLING – SOFTWARE
- The ports and LEDs “LAN 1” and “LAN 2” correspond to the interfaces “eth0” and “eth1”
- The LEDs “Module 1” to “Module 4” refer to WLAN and/or 5G/LTE modules
- WLAN modules are called “radio” within the software
- 5G/LTE modules are called “modem” within the software
- The number of antennas depends on the modules inserted in your CyBox model with max. 4 module slots available
CYBOX MODELS | LED ó SOFTWARE CORRELATION | ANTENNAS |
---|---|---|
2x 5G/LTE + 2x WLAN | Module 1 ó MODEM_S1 Module 2 ó MODEM_S2 Module 3 ó Radio | |
0 Module 4 ó Radio 1 | 5G/LTE 1 (MODEM_S1) A1-A4 | 5G/LTE 2 (MODEM_S2) A1-A4 |
WLAN 1 (Radio_0)
A1-A3| WLAN 2
(Radio_1)
A1-A3
2x 5G/LTE + 1x WLAN| Module 1 ó MODEM_S1 Module 2 ó MODEM_S2 Module 3 ó Radio
0| 5G/LTE 1 (MODEM_S1) A1-A4| 5G/LTE 2 (MODEM_S2) A1-A4| WLAN 1
(Radio_0) A1-A4| Not used
3x 5G/LTE| Module 1 ó MODEM_S1 Module 2 ó MODEM_S2 Module 3 ó MODEM_S3| 5G/LTE
1 (MODEM_S1) A1-A4| 5G/LTE 2 (MODEM_S2) A1-A4| 5G/LTE 3 (MODEM_S2) A1-A4| Not
used
Table 6 Overview Front Panel Antenna Description
LED INDICATORS
The LEDs on the front panel of the CyBox GW 2-P provide quick indication of the device status.
POWER LED STATUS
LED COLOR | STATE | DESCRIPTION |
---|---|---|
Green | On | Device is receiving correct input power |
Green | Off | Device is not powered |
Table 7 Power LED Status
STATUS LED 1|
LED COLOR| STATE| DESCRIPTION
Red| On| Error detected
Green| On| Normal operation
Green| Off| U-Boot and self testing executed
Green| Blinking| Resetting to factory settings
Red/Green| Blinking| Executing emergency system
Table 8 Status LED 1
STATUS LED 2|
LED COLOR| STATE| DESCRIPTION
Red| Off| Not used
Green| Off| Not used
Table 9 Status LED 2
MODULE 1-4 LED STATUS
LED COLOR | STATE | DESCRIPTION |
---|---|---|
Green | On | Indicates module N (1..4) is in use |
Green | Blinking | Indicates data transfer on module N (1..4) |
Green | Off | Indicates module N (1..4) is inactive |
Table 10 Module 1-4 LED Status
LAN LED (100 M | 1000 M) STATUS
1 GBIT (GREEN) | LINK/ACT (YELLOW) | DESCRIPTION |
---|---|---|
On | On | 1 Gbit link established |
Off | Off | No link |
On | Off | 10/100 Mbit link established |
Blinking | Off | 10/100 Mbit link established and active |
Blinking | On | 1 Gbit link established and active |
Table 11 LAN LED Status
RESET SWITCH
The CyBox GW 2-P is equipped with a hidden reset switch behind the front panel, close to the LEDs. The button is accessible with a straightened paper clip pushed through the little hole on the front panel. The effect of pressing the reset switch depends on the duration of its activation, as indicated in Table 12 below. The time response is valid only if the device has completely booted (after approx. 1 min). While the device is booting or executing U-Boot, pushing the button will always reset the device.
The following table describes the functions of the reset switch.
HOLD TIME | FAIL LED BEHAVIOR | ACTION |
---|---|---|
< 2 seconds | Off | Reset after release |
2-5 seconds | Off | No action |
> 5 seconds | Green blinking | Remove custom configuration then reset |
Table 12 Reset Switch Behavior
SIM CARDS
The Cybox GW 2-P provides 4 SIM slots per 5G/LTE modem. Only one slot per modem can be active at any time. To install SIM cards the back panel of the CyBox GW 2-P has to be removed using a suitable torx 10 screwdriver. After installing the SIM cards the back panel must be closed and the screws tightened to a maximum torque of 0.55 Nm. The indexing of SIM slots is software dependent and can be selected via an SNMP command or using the web interface.
Note:
Switching between SIM slots takes about 30 seconds, slot 1 being preselected
at power up. If you plan to use only one SIM card for a given 5G/LTE modem it
is advisable to use slot 1 to avoid slot switching delay during booting.
Figure 4 shows the SIM slot assignment per modem.
Figure 4 SIM Slot Assignment per Modem
Important:
Do not change the SIM cards when the device is powered since there is a danger
of touching the main voltage when the device is open.
MOUNTING
When mounting the CyBox GW 2-P please take the following aspects into account.
- Do not install the device close to any sources of heat such as radiators or heat registers.
- Keep the device away from any liquids and avoid exposure to dripping or splashing. The protection class of the housing is IP40.
- Keep a free space of at least 150 mm around the housing to ensure adequate heat dissipation capabilities.
- For optimal heat dissipation the connectors should face down.
- The housing provides four mounting cutouts to install the device in horizontal or vertical orientation on a flat and stable surface.
- For fixation use M6 screws of sufficient length with additional M6 washers.
Figure 5 shows the outer dimensions of the housing including the position of the mounting cutouts.
Figure 5 Dimensions of the Housing
CONNECTING AN EARTHING CABLE
A M6 earthing stud on the front panel of the device (also refer to Figure 1) for protective earth connection is essential for the device security. Carry out the following steps to connect an earthing cable:
- Use an earthing cable with a cross-section of at least 2.5 mm² and a wire end sleeve with eyelet suitable for a 6 mm threaded bolt.
- Mount the earth cable as shown in Figure 6.
- Fasten the cable by tightening the nut to the required torque (recommended according to EN 60947-1 are 3 Nm).
Figure 6 Earth Cable Mounting on Earth Stud
ELECTRICAL CONNECTION
- Make sure the device is properly grounded.
- Establish a connection to the network by plugging a M12 patch cable to one of the front panel M12 connectors. Each LAN port may be used if the gateway is supplied by a local power supply through the power supply connector.
- Connect the desired number of antennas to the device. Each radio/modem can use up to four antennas for maximal performance.
- In case of using a local power supply the appropriate wiring (see Table 1 ) must be established to connect the power line to the device.
- Make sure that the voltage of the power supply conforms to the voltage on the type plate.
- Ensure that the power supply is grounded correctly and that the power cable is intact and undamaged. Do not switch on the system if there are damages on the power cable or plug.
- Use power cables which are approved for the power supply in your country.
- The device itself has no on/off switch, it starts as soon as it is supplied with power.