Schneider Electric Pytes E-Box 48100R Lithium Iron Phosphate Battery User Guide

June 3, 2024
Schneider Electric

E-Box 48100R Lithium Iron Phosphate Battery
User GuideSchneider Electric Pytes E-Box 48100R Lithium Iron Phosphate
Battery

Pytes E-Box 48100R Lithium Iron Phosphate Battery

Schneider Guide
All Open Loop Settings are programmable with a SCP, Insight Local or/and Insight Cloud.
Disregard the communication cable that would go from battery to inverter.
Settings for Pytes Batteries with Schneider Inverters

Charger Setting > Custom Setting

Battery Type| Custom
Charge Cycle| 2StgNoFloat
Bulk Voltage| 56 V
Max Bulk Current| 50A per battery
Max Discharge Current| 50A per battery
Battery Capacity| 100 Ah per battery
Max Charge Rate Percentage (%)| 50A per battery
Divided by Total Inverter DC Amps*
Default Battery Temperature| Warm
Recharge Volts| 51.2 V
Grid Support Volts| 53 V
Absorb Volts| 56 V
Absorb Time| 1 hour
Charge Block Start| Default
Charge Block Stop| Default
Advanced Setting > Inverter Settings
Low Battery Cut Out Voltage| 47 V
LBCO Hysteresis| 2.0 V
LBCO Delay| 5 Sec
High Battery Cut Out Voltage| 56.5 V
Search Watts| Default
Search Delay| Default

Settings with Schneider Charge Controllers
Parameter Setting for Pytes Batteries with Schneider XW+&XW Pro MPPT 60/80

Advanced Setting > Charger Setting

Battery Type| Custom
Custom Setting
Charge Mode| 3 Stage
Eqlz Mode| Disabled
Bulk Voltage| 56.2 V
Absorb Voltage| 56.2 V
Absorb Time| 60 minutes
Float Voltage| 55.8 V
Battery Temperature Compensation| OmV/C
Battery Capacity| 100Ah per battery
Max Charge Rate Percentage| 50 A per battery
Divide by total CC amp output
Charge Cycle| Warm
Recharge Volts| 53 V
Absorb Time| 1 Hour
Default Battery Temperature| Warm
Battery Voltage (Auto-detected)| 51.2 V

Note: The charge controllers can be set to a 3 stage charging cycle, but the inverter should be kept in a 2 stage charging cycle. Doing so, as well as setting the charge controller recharge voltage to be greater than that of the inverter recharge voltage, will prioritize charge controller charging over the inverter charging. Inverter charging is a grid/generator charge which has a lower priority than solar charge controller charging.
Please refer to XW Pro Commissioning Guide – Schneider Electric Solar for more information.

References

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Schneider Electric User Manuals

Related Manuals