ECTIVE MSP 260 Flex Flexible Solarmodule Instruction Manual

August 16, 2024
ECTIVE

ECTIVE MSP 260 Flex Flexible Solarmodule

Specifications:

  • Product Name: ECTIVE MSP & SSP Series Solar Modules
  • Module Type: Monocrystalline
  • Series: ECTIVE MSP & SSP
  • Mounting Type: Freestanding or Adhesive (for MSP-/SSP-FLEX series)
  • Warranty: 3 years manufacturer’s warranty

Product Usage Instructions

General Information
Thank you for choosing the ECTIVE solar module! Read the manual carefully before installation. Visit ECTIVE.DE for more information.

Safety Instructions
Ensure safety during installation and use. Follow all safety guidelines provided in the manual.

Installation of Solar Modules

  1. Remove all protective films, covers, and corner protections from the solar panel.
  2. For freestanding installation, ensure modules are not shaded or shadowed by other objects. For ground-level installation, prevent snow accumulation at the bottom.
  3. For MSP-/SSP-FLEX series, use DEKAsyl Ms-5 adhesive applied in a snake-line pattern at the center of the panel. Space adhesive strips 15 cm apart, about 5 cm from the edge. Apply adhesive 8-10 mm thick. Allow it to dry for 24 hours before adding DEKAsyl MS-1 or MS-6.

Electrical Installation
Refer to the provided electrical installation instructions for connecting the solar modules correctly.

Troubleshooting and Maintenance
Refer to the manual for guidance on identifying and resolving common issues with the solar modules. Perform regular maintenance as recommended.

Disposal
Follow local regulations for the proper disposal of solar modules at the end of their lifespan.

FAQ

Q: How do I ensure proper adhesive application for MSP-/SSP-FLEX series modules?
A: Apply DEKAsyl Ms-5 adhesive in a snake-line pattern at the center of the panel, spaced 15 cm apart, about 5 cm from the edge. Allow it to dry for 24 hours before adding additional adhesive.

Welcome!

Thank you for choosing the ECTIVE solar module!
Please read this manual carefully before installing and using the device. Also make sure to read and follow the instructions for any charge controller or any other devices you connect to the solar module.
ECTIVE stands for power supply solutions at an unbeatable price-performance ratio.
Explore our brand and products at ECTIVE.DE

General Information About this Manual

Subject and Purpose of these Instructions
This manual presents all relevant information for the safe installation of ECTIVE MSP and SSP solar modules. Expert knowledge is required for the installation and commissioning of photovoltaic systems. Therefore, you should read this manual carefully and take into account all the safety instructions listed here when installing the modules. If you have any questions about the products, simply contact our service team by mail (info@ective.de). Keep the manual in a safe place for future reference, such as maintenance and care of the solar module.

Validity
Please note that our products are subject to unannounced technical changes at any time and that the associated instructions may change accordingly. The validity of the information in this document is based on the data of your order confirmation for the purchased product. If you have any questions, please contact ECTIVE.

Warranty
The current warranty conditions of ECTIVE apply to the solar modules. In addition to the legal warranty for production and material defects existing at the time of delivery, we grant a voluntary manufacturer‘s warranty of three years on our products..

Disclaimer
The use of ECTIVE solar modules is at your own risk. The manufacturer is not liable for typical wear and tear of the products. Likewise, no responsibility is assumed for defects resulting from improper use or lack of maintenance. Liability for damages is excluded in the following cases:

  • Device damage due to overvoltage or mechanical influences.
  • Faulty assembly/installation
  • Damage due to device use for purposes other than those intended by the manufacturer
  • Technical/structural modifications to the devices by the manufacturer without written approval

Safety Instructions

Dangers
The installation of the ECTIVE solar modules may only be carried out by competent specialists. The following must be observed:

  • The installer himself is liable for injuries or accidents of any kind in the course of installation.
  • A single solar module generates DC voltages of 30 volts and more, which can already lead to dangerous electric shocks. If several modules are connected in series, the voltage of the individual modules adds up to a correspondingly higher total voltage.
  • Cover the solar module with an opaque material during installation so that no solar current can be generated and thus there is no risk of electric shock.
  • Use only insulated tools approved for electrical work during installation.
  • When disconnecting the modules from the solar system, do not apply any current. Ensure beforehand that the inverter is disconnected from the power supply on both sides (DC and AC sides).
  • Never carry out work on the solar system during rain or strong winds. Use suitable fall protection for work on the roof.
  • During transport, installation and maintenance of all components of the photovoltaic system, all safety specifications of the manufacturers must always be observed.

Damage to Equipment and Property
To avoid damage due to improper use, you should observe the following instructions:

  • Only use cables, connections and racks intended for this purpose for your photovoltaic system.
  • Only use solar modules of the same type within a photovoltaic system.
  • Only use intact solar modules.
  • Do not short-circuit the modules.
  • Abruptly setting down or dropping the modules, as well as heavy objects lying or falling on them, can lead to damage. Likewise, persons should not walk or stand on the modules.
  • During transport and installation, make sure to hold the modules carefully by the frame and not by the electrical connection components.
  • Do not drill any additional holes on the frame or on the glass surface.
  • Individual components of the module as well as glued-on information signs must not be removed.
  • Avoid getting paint or adhesives on the module surface.
  • Artificial amplification of the incident sunlight (e.g. by a mirror) must be avoided.
  • Avoid direct sunlight on the back of the modules.
  • Do not place the modules in locations where flammable gases can escape.
  • Unpack the product only in the manner specified by the manufacturer and with suitable tools to avoid damage.
  • The manufacturer assumes no responsibility for an improperly set up rack or non-compliance with the locally applicable legal requirements for the installation of photovoltaic systems.

Installation of Solar Modules

Make sure to remove any protective films, covers and corner protections from your solar panel.

Location
ECTIVE solar modules are designed to be mounted on the ground or on roofs of houses or vehicles. You should also consider the following when choosing a location:

  • In southern latitudes, solar modules should face north, while in northern latitudes they should face south.
  • Seek professional help from a solar installer or system designer to determine the proper tilt angle of your modules.
  • When positioning the modules, make sure that the solar cells are free of shade all day and over their entire surface.
  • For upright placement, the connection socket should face upward while the connection cables run downward.

Rack
Solar modules require a frame made of UV and corrosion resistant material that provides sufficient stability for loads caused by snow and wind. When mounting, consider the following:

  • All four anchoring points of the modules must be securely fixed to the frame. For additional stabilization in case of stronger wind or snow load, you should attach further anchors.
  • Depending on the frame, mounting is possible using turn screws or module clamps.
  • Recommended tightening torque for mounting screws: 6 to 14 Nm.
  • Recommended clamping area per module clamp: 600 mm² or more.
  • When mounting on a car roof, use special plastic profiles.

Types of Mounting
ECTIVE solar modules are suitable for free-standing, on-roof and in-roof mounting as well as for mounting on poles or masts.

  • When mounting, make sure that the ventilation and drainage openings located in the frame remain free.
  • The modules should be placed at an installation angle of at least 15°for optimal self-cleaning.
  • A distance of at least 5 mm should be maintained between the modules.
  • The distance between the end clamp and the mounting rail should be 8 to 10 cm.

Important for free-standing installation: Make sure that the modules are not in the shade or shade each other. If installed close to the ground, the lower area must not be covered with snow. Damage caused by flying sand or small stones must also be excluded.
Important for mounting parallel to the roof (e.g. car roof): Ensure sufficient air space (min. 100 mm) between the solar module and the mounting surface. Any holes in the roof required for mounting must be securely sealed at the end.

ECTIVE Mounting Accessories
With the mounting sets from ECTIVE, solar modules can be installed particularly securely and ergonomically. This minimizes flow resistance and wind noise, while ensuring optimal hold. The mounting elements, which are available in six different sets depending on requirements, contain corner profiles, short and long holding spoilers as well as a roof grommet for cables. We offer the elements in black and white.
The profiles are attached to the solar module frame with screws and then glued, e.g. to the roof of a camper. The corresponding special body adhesives are generally suitable for ambient temperatures between -20 °C and +60 °C and a maximum permissible humidity of 100% (non-condensing).

Models of the ECTIVE MSP-/SSP-FLEX-Series
Solar modules of the ECTIVE MSP-/SSP-FLEX series are light, handy and easy to mount. Due to their outstanding flexibility, these high-quality modules can also be mounted on round surfaces, such as the roof of a mobile home or on a boat. The MSP-/SSP-FLEX modules can be easily and securely bonded to almost any surface, even if it is not perfectly flat.
To guarantee a long-lasting bond, the surface should be thoroughly cleaned before attaching the panel, especially of oil and dust. The special vehicle adhesives are generally suitable for ambient temperatures between -20 °C and +60 °C and a maximum permissible humidity of 100% (non-condensing).
Please be sure to follow the recommendations and installation instructions below when attaching our flexible panels. Improper bonding can result in a panel being difficult to remove from the surface or damage the solar module in the process.
We recommend the use of two DEKALIN adhesives for bonding MSP/SSP-FLEX modules: DEKAsyl MS-5 and DEKAsyl MS-1 (or alternatively MS-6). These adhesives are resistant to weathering and ageing, vibration-resistant and easy to apply. This makes them ideal for attaching flexible solar panels. To guarantee a secure hold on your vehicle and so that the panel can be removed again if necessary without damaging it, use the adhesive as follows:
Apply DEKAsyl MS-5 in a series of wavy lines in the centre of the panel. The adhesive strips should be spaced approx. 15 cm apart and the lines should end approx. 5 cm from the edge of the panel. The adhesive should be applied to a thickness of about 8 to 10 mm. Attach the solar panel and allow the adhesive to dry for 24 hours.

The back of the solar panel must not be roughened or sanded for bonding! This reduces the adhesive strength.
After 24 hours, grout the solar panel with DEKAsyl MS-1 or MS-6.
Ensure that even pressure is applied to the entire panel when applying and pressing the panel onto the vehicle surface. Use a spatula to remove any adhesive that is squeezed out at the edges of the panel.
If you want to remove the glued panel later, remove it from the vehicle surface very carefully using a flat object such as a spatula. Make sure that you do not damage the panel in the process.

Red: Dekalin DEKAsyl MS-5
Blue: Dekalin DEKAsyl MS-1 or
Dekalin DEKAsyl MS-6

Electrical Installation

General Notes
The currents and voltages produced by the module under normal conditions differ from the values on the data sheet because they were obtained under standard test conditions.

  • To determine component voltages, load capacity, fuse size, etc. within your system, you should multiply the specified short-circuit current and open-circuit voltage values by a factor of 1.25.
  • Be careful not to exceed the maximum system voltage of the components and the allowable input voltage of the connected inverter.
  • Recommended cable cross-sectional area per module: 4 mm².
  • Recommended rated current per connection > 10 A.

Important: If you want to feed the produced solar power into your utility grid, you usually need a permit for this from the responsible utility grid operator. The connection of the system to the house power grid may only be carried out by a qualified specialist.

Grounding
It is imperative that you comply with the locally applicable grounding regulations. Do not use grounding connections such as bolts and screws for module fastening to the rack. The holes provided for this purpose at the rear of the module frame must be used for fastening the equipotential bonding.

Wiring
Only use suitable plugs of the same type and UV-resistant solar cables for the installation.

  • When laying the cables, avoid kinking them or chafing them along sharp objects.
  • Ensure that the bending radius of the cables is sufficient (at least 8 times the cable outer diameter) and that there is sufficient distance between the bend and the junction box (at least 5 cm).
  • Do not lay cables under tensile stress; a tensile moment of 50 N (5 kg) must not be exceeded.
  • Use cables that are as short as possible to reduce inherent loss.

Testing
Before use, test the electrical components of your system.

  • Check the open circuit voltage of each string using a digital multimeter. The values must equal the sum of the nominal voltage specified for each module.
  • On each series circuit, check the short-circuit current using a multimeter. The measured value must be 1.25 times the rated short-circuit current of the respective module.

Troubleshooting and Maintenance

Defective Bypass Diodes
Shaded solar cells can cause high reverse currents, causing the affected cells to heat up strongly. To protect the solar modules from damage in such cases, they have bypass diodes. If one of these diodes fails, you must replace it. By stating the serial number of your module, you can request the appropriate diode type from ECTIVE.

Low Voltage
Excessive low voltage may be caused by faulty terminations or defective bypass diodes.

  • Check all cable connections to ensure that they are connected correctly.
  • Measure the open circuit voltage at each module.
  • Cover all modules with an opaque material.
  • Disconnect both terminals on the module under test, remove the cover on that module, and measure the open circuit voltage at the terminals.
  • If the voltage is only half the nominal voltage, the bypass diode is defective.
  • If the voltage between both terminals deviates by more than 5 %, there is a faulty connection.

Maintenance
We recommend the following measures for regular maintenance of your ECTIVE Solar modules:

  • Remove dirt from the glass surfaces with water and a soft cloth or sponge. Do not use any abrasive cleaning solutions.
  • Check all connections every six months to ensure that they are not damaged, dirty or loose.
  • Consult a competent professional if any problems occur.

Disposal The EU Directive 2012/19/EU WEEE regulates the disposal of solar modules. According to this, the local recycling center is obligated to accept solar modules and feed them into the recycling process. If you have any questions about this, please do not hesitate to contact us.
Please recycle or dispose of the packaging material for this product.
The german Electronic Equipment Act (ElektroG) regulates how to place electronic devices on the market, how to recycle and dispose of them.

eine Marke der / a brand of batterium GmbH
Robert-Bosch-Straße 1 71691 Freiberg am Neckar Germany
Tel.: +49 7141 1410870
ECTIVE.DE

Read User Manual Online (PDF format)

Read User Manual Online (PDF format)  >>

Download This Manual (PDF format)

Download this manual  >>

Related Manuals